Responds to NRC Re Violations Noted in IE Insp Repts 50-424/81-01 & 50-425/81-01.Corrective Actions: Procedure Change Made to Incorporate Correct Testing Procedure & Revise Concrete Placement Pour Log
ML19350C010
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 03/03/1981
From: Kelly R
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19350C009 List:
References
GN-116, NUDOCS 8103240668
Download: ML19350C010 (2)


Text

- (

Geor7a Pc*er Corecany

[.

230 Peacnnee Street g

Pos CNe Box 4545 A tarta Georc-a 30302 Te'epncre 404 522 6060

' O

,i 9{

R. J. Kelly 9

Senior ece Pr+so:em i

i L

'"' ""~

03 e Gene,aNr.

March 3, 1981 United States Nuclear Regulatory Commssion

REFERENCE:

Office of Inspection and Enforcement IE:

II: JRH Region II - Suite 3100 50-424/81-01 101 Marietta Street 50-425/81-01

~ Atlanta, GA 30303-File: X78G10 Attention: Mr. C. E. Murphy Log:

GN-116 Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the-violation of concrete test cylinder sampling'as discussed

'in your inspection report 50-424/81-01 and 50-425/81-01. A review has been conducted of the sampling data and the sampling frequency and we concur that the sampling frequency was not in accordance with the procedure and construc-tion specification requirements.

A change notice to Construction Specification X2AP01, which changed the testing frequency when correlation testing-is in effect, was received on site approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to the start of the pour. Georgia

, Power.; procedures require.that.when differences. exist between s_ite procedures

. and the construction specification, the requirements of the specification shall take precedence. ~Since the change. notice arrived on si.te the day before

~

~

~

~

th'e' p'our,: inadequate' time was' available~ for discussion and coordination among the various testing personnel of = the test frequency changes.

~

LCorrective action was taken to review the new testing frecuency imme-

' diately'following"the Containment Building Unit' #1' pour 'and to insure that all personnel assigned to concrete testing were aware of the new testing frequency. A procedure change was made to Plant Vogtle Field Procedure CD-T-02 to incorporate the new testing frequency and revise the Concrete Placement Pour Log.

This form was changed to -institute an easier means of correlating the truck and pump discharge results to insure compliance. A Non-Conformance L Report"(NCR) was written onT the_ missing ~ test samples'and presented'to engi-

~'

'neering for a disposition.

A Concrete Testing Review Sheet has been developed to insure that_a

-review of the test. frequency is. performed. This fann is a visual represen-

-tation used to depict the cubic yardage at which each test was taken and whether it falls within the required test frequency.

It is a Civil Q.C.

review fonn and shall be maintained in a desk top procedure. The Concrete Testing Review Sheet will note any problems for resolution from engineering and will serve to measure the effectiveness of the training program.

81032'4O M

s Georgia Power A Mr. C. E. Murphy IE:

II: JRH 50-424/81-01; 50-425/81-01 March 3, 1981 Page 2 Full compliance will be achieved by April 24, 1981.

Neither the inspection report nor this reply contain any proprietary

-infonnation and may be.placed in the NRC's Public Document Room.

Very truly yours, b

R. J. Kelly RJ K:tp STATE OF GEORGIA COUNTY OF FULTON R. d. ' Kelly stat'es that'he is Senior Vice President of Georgia Power Company

~

~

~

and is authorized. to execute this oath on. behalf _of Georgia Power. Company, and thit'to the best of his'kn'owledge and belief the facts set forth'in' this letter are true.

l

.GPC by:

~ Wh M l

-1 R. J. Kelly

. Sworn to and subscribed before me this-3rd day of March, 1981..