Geor7a Pc*er Corecany
[.
230 Peacnnee Street g
Pos CNe Box 4545 A tarta Georc-a 30302 Te'epncre 404 522 6060
' O
,i 9{
R. J. Kelly 9
Senior ece Pr+so:em i
i L
'"' ""~
03 e Gene,aNr.
March 3, 1981 United States Nuclear Regulatory Commssion
REFERENCE:
Office of Inspection and Enforcement IE:
II: JRH Region II - Suite 3100 50-424/81-01 101 Marietta Street 50-425/81-01
~ Atlanta, GA 30303-File: X78G10 Attention: Mr. C. E. Murphy Log:
GN-116 Gentlemen:
The Georgia Power Company wishes to submit the following information concerning the-violation of concrete test cylinder sampling'as discussed
'in your inspection report 50-424/81-01 and 50-425/81-01. A review has been conducted of the sampling data and the sampling frequency and we concur that the sampling frequency was not in accordance with the procedure and construc-tion specification requirements.
A change notice to Construction Specification X2AP01, which changed the testing frequency when correlation testing-is in effect, was received on site approximately 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to the start of the pour. Georgia
, Power.; procedures require.that.when differences. exist between s_ite procedures
. and the construction specification, the requirements of the specification shall take precedence. ~Since the change. notice arrived on si.te the day before
~
~
~
~
th'e' p'our,: inadequate' time was' available~ for discussion and coordination among the various testing personnel of = the test frequency changes.
~
LCorrective action was taken to review the new testing frecuency imme-
' diately'following"the Containment Building Unit' #1' pour 'and to insure that all personnel assigned to concrete testing were aware of the new testing frequency. A procedure change was made to Plant Vogtle Field Procedure CD-T-02 to incorporate the new testing frequency and revise the Concrete Placement Pour Log.
This form was changed to -institute an easier means of correlating the truck and pump discharge results to insure compliance. A Non-Conformance L Report"(NCR) was written onT the_ missing ~ test samples'and presented'to engi-
~'
'neering for a disposition.
A Concrete Testing Review Sheet has been developed to insure that_a
-review of the test. frequency is. performed. This fann is a visual represen-
-tation used to depict the cubic yardage at which each test was taken and whether it falls within the required test frequency.
It is a Civil Q.C.
review fonn and shall be maintained in a desk top procedure. The Concrete Testing Review Sheet will note any problems for resolution from engineering and will serve to measure the effectiveness of the training program.
81032'4O M
s Georgia Power A Mr. C. E. Murphy IE:
II: JRH 50-424/81-01; 50-425/81-01 March 3, 1981 Page 2 Full compliance will be achieved by April 24, 1981.
Neither the inspection report nor this reply contain any proprietary
-infonnation and may be.placed in the NRC's Public Document Room.
Very truly yours, b
R. J. Kelly RJ K:tp STATE OF GEORGIA COUNTY OF FULTON R. d. ' Kelly stat'es that'he is Senior Vice President of Georgia Power Company
~
~
~
and is authorized. to execute this oath on. behalf _of Georgia Power. Company, and thit'to the best of his'kn'owledge and belief the facts set forth'in' this letter are true.
l
.GPC by:
~ Wh M l
-1 R. J. Kelly
. Sworn to and subscribed before me this-3rd day of March, 1981..
.c A
W 0
. Notary Public- *
~
g.
l L
J