Text
p.3Ettg
e
/[
jg
UNITED STATES
&
[g
j
NUCLEAR REGULATORY COMMISSION
d
3 ,,
"
g
~r
REGION 111
o,
g
799 ROOSEVELT ROAD
b
o
GLEN ELLYN. ILLINolS 60137
.....
B ' O 1981
1 A L] 4 (,g.~
'l f
9y 6z'[
/j/y/n, jj h
Docket No. 50-456
j
'<3,,
S ! o,% ,1 IQ
4
%U
Docket No. 50-457
O
11
f
Commonwealth Edison Company
'\\
h
A
)
E'
'b4 '$'/
ATTN:
Mr. Cordell Reed
Vice President
,
Post Office Box 767
4
-
'
Chicago, IL 60600
This refers to the routine inspection conducted by Messrs. R. L. Lee and
J. H. Neisler of this office on January 27-28, 1981, of activities at the
Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC
Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion
of our findings with Mr. T. R. Sommerfield and others of your staff at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No items of noncompli:nce with NRC requirements were identified during the
course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code af Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty-five days of the date of this letter, to
withhold such informatior. from public disclosure. The application must
include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary
information identified in the application is contained in an enclosure
to the application.
,'
S10323015 6
Q
.
'
t EB
Commonwealth Edison Company
-2_
1 0 1981
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
'
G. Fiore11i, Chief
Reactor Ccnstruction and
Engineering Sur, ort Branch
Enclosure:
IE Inspection
Reports No. 50-456/81-02
and No. 50-457/81-02
cc w/ encl:
J. S. Abel, Director
of Nuclear Licensing
R. Cosaro, Project
.
Superintendent
V. I. Sc'.losser,
Project Manager
J. F. Gudac, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
TIC'
Dean Hansell, Office of
Assistant Attorney General
,
e