Forwards IE Insp Repts 50-456/81-02 & 50-457/81-02 on 810127-28.No Noncompliance Noted
ML19350B626
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/10/1981
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19350B627 List:
References
NUDOCS 8103230156
Download: ML19350B626 (2)


See also: IR 05000456/1981002

Text

p.3Ettg

e

/[

jg

UNITED STATES

&

[g

j

NUCLEAR REGULATORY COMMISSION

d

3 ,,

"

g

~r

REGION 111

o,

g

799 ROOSEVELT ROAD

b

o

GLEN ELLYN. ILLINolS 60137

.....

B ' O 1981

1 A L] 4 (,g.~

'l f

9y 6z'[

/j/y/n, jj h

Docket No. 50-456

j

'<3,,

S ! o,% ,1 IQ

4

%U

Docket No. 50-457

O

11

f

Commonwealth Edison Company

'\\

h

A

)

E'

'b4 '$'/

ATTN:

Mr. Cordell Reed

Vice President

,

Post Office Box 767

4

-

'

Chicago, IL 60600

This refers to the routine inspection conducted by Messrs. R. L. Lee and

J. H. Neisler of this office on January 27-28, 1981, of activities at the

Braidwood Nuclear Power Station, Units 1 and 2, authorized by NRC

Construction Permits No. CPPR-132 and No. CPPR-133 and to the discussion

of our findings with Mr. T. R. Sommerfield and others of your staff at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompli:nce with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code af Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty-five days of the date of this letter, to

withhold such informatior. from public disclosure. The application must

include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary

information identified in the application is contained in an enclosure

to the application.

,'

S10323015 6

Q

.

'

t EB

Commonwealth Edison Company

-2_

1 0 1981

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

'

G. Fiore11i, Chief

Reactor Ccnstruction and

Engineering Sur, ort Branch

Enclosure:

IE Inspection

Reports No. 50-456/81-02

and No. 50-457/81-02

cc w/ encl:

J. S. Abel, Director

of Nuclear Licensing

R. Cosaro, Project

.

Superintendent

V. I. Sc'.losser,

Project Manager

J. F. Gudac, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC'

Dean Hansell, Office of

Assistant Attorney General

,

e