UNITED STATES
5
0
.-
-' .
NUCLEAR REGULATORY COMMisslON
5 *) D :
639 PARK AVENUE
d
$
S
REGION I
8,
KING OF PRU551 A. PENMMV ANI A 19406
,
.....
23 m
Docket No. 50-21;
Connecticut Yankee Atomic Power Company
ATTN: Mr. W. G. Counsil
Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject:
Inspection 50-213/80-24
This refers to the routine inspection conducted by Dr. L. Bettenhausen of this
office on November 19-21, 1980 at the Haddam Neck Plant of activities authorized
by NRC License No. DPR-61 and to the discussions of our findings held by Dr.
Bettenhausen with Mr. Graves of your staff at the conclusion of the inspection,
and to a subsequent telephone discussion between Dr. Bettenhausen and Mr. Test
on November 26, 1980.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Our inspector also verified the steps you have taken to correct the item of
noncompliance brought to your attention in the enclosure to our letter dated
September 18, 1979.
We have no further questions regarding your action at this
time.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels described in the Federal Register Notice
(45 FR 66754) dated October 7, 1980.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infomation
that you (or your contractor) believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must be accompanied by
an affidavit executed by the owner of the infomation, which identifies the
8108200 Q
1
.
.
Connecticut Yankee Atomic
Power Cecpany
2
3g
document or part sought to be withheld, and which contains a statement of reascns
which addresses with specificity the items which will be considered by the
Comission as listed in subparagraph (b) (4) of Section 2.790. The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear feco you in this regard within the
specified period, the report will be placed in the Public Docu ent Rocra.
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincereiy,
4
___
m_
EW nr. Brunner, Chief
Reactor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Office of Inspection and Enforcement Inspection
Report Number 50-213/80-24
cc w/ encl:
R. Graves, Plant Superintendent
D. G. Diedrick, Manager of Quality Assurance
J. R. Hicrelwright, Licensing Safeguards Engineer