Forwards IE Insp Rept 50-213/80-24 on 801119-21 & Notice of Violation
ML19350B462
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/23/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML19350B459 List:
References
NUDOCS 8103200579
Download: ML19350B462 (2)


See also: IR 05000213/1980024

Text

.

.

    • %

UNITED STATES

5

0

.-

-' .

NUCLEAR REGULATORY COMMisslON

5 *) D :

639 PARK AVENUE

d

$

S

REGION I

8,

KING OF PRU551 A. PENMMV ANI A 19406

,

.....

23 m

Docket No. 50-21;

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection 50-213/80-24

This refers to the routine inspection conducted by Dr. L. Bettenhausen of this

office on November 19-21, 1980 at the Haddam Neck Plant of activities authorized

by NRC License No. DPR-61 and to the discussions of our findings held by Dr.

Bettenhausen with Mr. Graves of your staff at the conclusion of the inspection,

and to a subsequent telephone discussion between Dr. Bettenhausen and Mr. Test

on November 26, 1980.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in the enclosure to our letter dated

September 18, 1979.

We have no further questions regarding your action at this

time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

has been categorized into the levels described in the Federal Register Notice

(45 FR 66754) dated October 7, 1980.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infomation

that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such

information from public disclosure. Any such application must be accompanied by

an affidavit executed by the owner of the infomation, which identifies the

8108200 Q

1

.

.

Connecticut Yankee Atomic

Power Cecpany

2

3g

document or part sought to be withheld, and which contains a statement of reascns

which addresses with specificity the items which will be considered by the

Comission as listed in subparagraph (b) (4) of Section 2.790. The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear feco you in this regard within the

specified period, the report will be placed in the Public Docu ent Rocra.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincereiy,

4

___

m_

EW nr. Brunner, Chief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-213/80-24

cc w/ encl:

R. Graves, Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

J. R. Hicrelwright, Licensing Safeguards Engineer