Notice of Violation from Insp on 801119-21
ML19350B464
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/21/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML19350B459 List:
References
50-213-80-24, NUDOCS 8103200581
Download: ML19350B464 (1)


Text

.._

~_ _ _--

APPENDIX A NOTICE OF VIOLATION Connecticut Yankee Atomic Power Company Haddam Neck Plant License No. DPR-61 Docket No. 50-213 As a result of the inspection conducted on November 19-21, 1980 and in accord-ance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980) the following violation was identified:

Title 10, Code of Federal Regulations, Part 50, Appendix B, states, in part:

"XI.

Test Control...

Test results shall be documented and evaluated to assure that test requirements have been satisfied."

Contrary to the above, the following three examples of inadequate evalua-tion of test results were found:

1.

Incorrect, algebraic end point correction to the reactivity worth of rod B-31 with Control Bank B inserted.

2.

No review or approval signatures for procedure SUR 5.3-6, Control Rod Group Reactivity Worth-Combined with Boron Worth and Ejected Rod Worth, performed July 25-26, 1980.

3.

Numerous errors in data analysis of moderator temperature coefficient.

This is a Severity Level V Violation. (Supplement I)

Pursuant to the provisions of 10 CFR 2.201, Yankee Atomic Power Company is t.ereby required to submit to this office within twenty-five days of the date of this notice, a written statement or explanation in reply, includin (1) the corrective steps which have been taken and the results achieved; (g:2) corrective steps which will be taken to avoid further violations and; (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as-amended, this response shall be submitted under oath or affirmation.

[ >'!>/! T D

^

Dated

(

Eld 9n J. Brunner, Chief-Reactor Opertions and Nuclear Support Branch 8108200 $