Text
_
__
.,
.
%,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
o
r.
j
REGION I
%
c
631 PARK AVENUE
0
% ~ ,0
KING OF PRUS$1A, PENNSYLVANIA 19406
,
0
Docket No. 50-271
Vemont Yankee Nuclear Power Corporation
ATTN: Mr. Robert L. Smith
Licensing Engineer
25 Research Drive
Westborough, Massachusetts 01581
Gentlemen:
Subject:
Inspection 50-271/80-15
This refers to the routine insper. tion conducted by Mr. W. Raymond of this
office on September 15-October 17, 1980, at Vemont Yankee Nuclear Power Station,
Vernon, Vennont, of activities authorized by NRC Licensee No. DPR-28 and to the
discussions of our findings held by Mr. Raymond with Mr. W. Murphy and other
members of your staff at the conclusion of the inspection.
Areas excmined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Based on the results of this inspection, it appears that one of your activities
were not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10 Code of
Federal Regulations. Section 2.201 requires you to submit to this office, within
twenty (20) days of your receipt of this notice, a written statement or explana-
tion in reply including:
(1) corrective steps which have been taken by you and
the results achieved; (2) corrective steps which will be taken to avoid further
items of noncompliance; and (3) the date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any informa-
tion that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
,
8103100S63
.
.,
_ _ _ _ _ _
_ _ .
i
.
Vermont Yankee Nuclear
,
'
Power Corporation
2
such infonnation from public disclosure. Any such application must be accompanied
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
Commission as listed in subparagraph (b) (4) of Section 2.790. The hfonnation
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
_
v
El o
. Brunner, Chief
Rea tor Operations and Nuclear
Support Branch
Enclosures:
1.
Appendix A. Notice of Violation
2.
Office of Inspection and Enforcement
Inspection Report No. 50-271/80-15
cc w/encls:
Mr. Warren P. Murphy, Plant Superintendent
Mr. W. F. Conway, Vice President and Manager of Operations
Mr. J. E. Griffin, President
Mr. L. H. Heider, Vice President
.