Forwards IE Insp Repts 50-317/80-25 & 50-318/80-21 on 801215-19.No Noncompliance Noted
ML19350B112
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 01/21/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19350B113 List:
References
NUDOCS 8103190673
Download: ML19350B112 (2)


See also: IR 05000317/1980025

Text

s

s

-7 6

  1. %g

d

UNITED STATES

j

&

.4

NUCLEAR REGULATORY COMMISslON

REGION I

as

g

631 DARK AVENUE

E

KING OF PRUS$1 A, PENNSYLV ANI A 19406

%,

$

....+

21 JAN 1c81

8I /4

p

Docket Nos. 50-317

j 6h/

~

'

Baltimore Gas and Electric Company

{ ** %R 16193;,

l

/

ATTN: Mr. A. E. Lundvall, Jr.

Vice President, Supply

D" <0

,

P. O. Box 1475

T

O^

Baltimore, Maryland 21203

s

Gentlemen:

Subject:

Combined Inspection 50-317/80-25 and 50-318/80-21

This refers to the routine inspection conducted by Dr. L. Bettenhausen of this

office on December 15-19, 1980 at Calvert Cliffs Nuclear Station, Lusby, Maryland

of activities authorized by NRC License Nos. DPR-53 and DPR-69 and to the dis-

cussions of our findings held by Dr. Bettenhausen with Mr. W. S. Gibson of your

staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations by the

inspector.

Our inspector also verified the stear you have taken to correct the item of

noncompliance brought to your atter.non in the enclosure to our letter dated

December 4, 1979. We have no further questions regarding your action at this

time.

l

!

Within the scope of this inspection, no items of noncompliance were observed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor) believe .to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by- the Comission as listed in subparagraph (b) (4) of Section 2.790.

The information sought to be withheld shall be incorporated as far as possible

into'a separate part'of the affidavit.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

. .

,

.

. _ .

.

,

,.

.

.

.

Baltimore Gas and Electric Company

2

No reply to this letter is required; however, if you have any questions con-

cerning this int-~ction, we will be pleased to discuss them with you.

.

Sincerely,

E on J. Brunner, Chief

Reactor Operations and Nuclear

-

Support Branch

Enclosure:

Combined Office of Inspection and Enforcement Inspection

Report Nmnber 50-317/80-25; 50-318/80-21

cc w/ encl:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services

>