MONTHYEARML19325C1282019-11-21021 November 2019 License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program Project stage: Request ML19350A8522019-12-16016 December 2019 Acceptance of Requested Licensing Action Revisions to Reactor Coolant Pump Flywheel Inspection Program Project stage: Acceptance Review ML20107F7652020-04-16016 April 2020 Response to Request for Additional Information to License Amendment Request - Revision to Technical Specification 5.5.7, Reactor Coolant Pump Flywheel Inspection Program Project stage: Response to RAI ML20182A1942020-08-13013 August 2020 Issuance of Amendment Nos. 336 and 314 Concerning Reactor Coolant Pump Flywheel Inspection Program Project stage: Approval ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages Project stage: Other 2020-04-16
[Table View] |
|
---|
Category:E-Mail
MONTHYEARML24012A0492024-01-11011 January 2024 Request for Additional Information Regarding Final Response to Generic Letter 2004-02 ML23311A1682023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections (L-2023-LLR-0053 and L-2023-LLR-005 ML23311A1692023-11-0707 November 2023 NRR E-mail Capture - Constellation - Fleet Request - Acceptance of Proposed Alternative for Examinations of Exam Categories B-B, B-D, and C-A SG Pressure Retaining Welds and Full Penetration Welded Nozzles (L-2023-LLR-0055 and L-2023-LLR-00 ML23304A0152023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Calvert Cliffs 1 & 2 - Exemption from Security Rule (L-2023-LLE-0033) ML23181A0732023-06-30030 June 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs TSTF-59A ML23160A0222023-06-0606 June 2023 NRR E-mail Capture - Calvert Cliffs - Long Term Coupon Surveillance Program RAI ML23156A0102023-06-0404 June 2023 NRR E-mail Capture - Calvert Cliffs - RAI License Amendment Request for Emergency Desiel Generator ML23080A1002023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Repair Replacement of Saltwater System Buried Piping ML23080A0672023-03-21021 March 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Unit 1 - LAR to Modify the Long-Term Coupon Surveillance Program ML23026A1332023-01-26026 January 2023 NRR E-mail Capture - Acceptance Review for Calvert Cliffs Deletion of License Condition for Decommissioning Trust LAR ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML22342B1462022-11-21021 November 2022 NRR E-mail Capture - Acceptance Review for TSTF 295A ML22325A0052022-11-18018 November 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-273-A, Revision 2 ML22255A0132022-09-0909 September 2022 NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, Calvert Cliffs, Ginna - License Amendment Request to Adopt TSTF-577 ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22271A0772022-05-0606 May 2022 NRR E-mail Capture - Final RAIs 9.1.2021 Constellation Relief Request ML22129A0132022-05-0606 May 2022 NRR E-mail Capture - Draft RAIs for Requests for Alternatives I4R-17, I4R-23, ISI-05-018, I6R-10 ML22091A2392022-04-0101 April 2022 NRR E-mail Capture - Calvert Cliffs - Formal RAI for Proposed Alternative for Examinations of Certain Pressurizer Welds ML22091A0852022-04-0101 April 2022 NRR E-mail Capture - Braidwood and Byron - Final RAI Regarding Proposed Alternative for Various Pressurizer Welds (EPID L-2021-LLR-0035 and 0036) ML22091A2402022-03-23023 March 2022 NRR E-mail Capture - (External_Sender) Salem Generating STATION-INCIDENTAL Take of Atlantic Sturgeon Collected on 03/22/2022 ML22075A1912022-03-16016 March 2022 NRR E-mail Capture - Acceptance for Review of Proposed Alternative Repair Method for Buried Class 3 Saltwater System Piping ML22088A1562022-03-0202 March 2022 NRR E-mail Capture - Byron, Braidwood, Calvert Cliffs, and Ginna - Non-acceptance of Application to Revise Technical Specifications 5.6.5.b, the Core Operating Limits Report (COLR) ML22059B0602022-02-28028 February 2022 Change to Review Schedule Regarding Proposed Alternative for Various Pressurizer Welds ML22060A0172022-02-23023 February 2022 NRR E-mail Capture - Calvert Cliffs Nuclear Power Plant, Units 1 and 2 - Withdraw of Draft RAI Regarding Proposed Alternative for Various Pressurizer Welds ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML21281A1402022-01-14014 January 2022 Acceptance for Review of Proposed Alternative ISI-05-018 for Examinations of Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A5712021-10-22022 October 2021 NRR E-mail Capture - Acceptance for Review of Proposed Alternative ISI-05-019 for Pressure Testing of Certain Portions of ASME Section XI Class 2 Auxiliary Feedwater Piping ML21287A0322021-10-13013 October 2021 Request for Additional Information Re Proposed Alternative for Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds ML21286A5902021-10-0505 October 2021 Acceptance for Review of Proposed Alternative ISI-05-017 for Examinations of Examination Category C-B Steam Generator ML21287A0932021-10-0505 October 2021 Request for Additional Information: Calvert Cliffs 1 & 2 LAR to Revise Spent Fuel Pool Cooling - Shutdown Cooling Systems Licensing Basis (EPID L-2021-LLA-0112) (Email) ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21214A0202021-08-0909 August 2021 License Amendment Request to Change Spent Fuel Pool Cooling Design Basis ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 ML21201A0482021-07-19019 July 2021 Acceptance of Requested Licensing Action to Change Spent Fuel Pool Cooling Design Basis ML21180A1562021-06-28028 June 2021 Request for Additional Information Regarding License Amendment Request Concerning Containment Sump ML21152A1232021-06-0101 June 2021 Acceptance for Review of Proposed Alternative ISI-05-016 Involving Examination of Pressurizer Circumferential and Longitudinal Shell-to-Head Welds and Nozzle-to-Vessel Welds (EPID L-2021-LLR-0037) (Email) ML21154A0132021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0112021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21154A0142021-05-28028 May 2021 NRR E-mail Capture - Extension of Comment Period for the Exelon Generation Company, LLC License Transfer Application ML21144A2132021-05-24024 May 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21117A0442021-04-26026 April 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21084A2532021-03-24024 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Transfer Application ML21062A0652021-03-0101 March 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative to Documentation Requirements for Pressure Retaining Bolting ML21049A2572021-02-18018 February 2021 Request for Additional Information Byron/Dresden Proposed Changes to Site Emergency Plans to Support Post-Shutdown and Permanently Defueled Conditions (EPID-2020-LLA-0240 & EPID-2020-LLA-0237) ML21033A8552021-02-0202 February 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request to Expand the Use ASME Codes Cases N-878 and N-880 ML21029A3302021-01-29029 January 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Fleet Alternative Request to Use ASME Code Case N-885 ML21022A0092021-01-21021 January 2021 Request-Calvert Cliffs-Exelon Generation Co., LLC ML20352A3802020-12-17017 December 2020 Acceptance of Requested Licensing Action to Add Containment Sump Technical Specifications ML20350B5582020-12-14014 December 2020 NRR E-mail Capture - Exelon Generation Company, LLC -Alternative Request for Documentation of Replacement of Pressure Retaining Bolting 2024-01-11
[Table view] |
Text
From: Marshall, Michael To: Villar, Enrique:(GenCo-Nuc) (Enrique.Villar@exeloncorp.com)
Cc: James Danna (James.Danna@nrc.gov)
Subject:
Calvert Cliffs Nuclear Power Plant, Units 1 And 2 - Acceptance of Requested Licensing Action Re: Revisions to Reactor Coolant Pump Flywheel Inspection Program (EPID L-2019-LLA-0261)
Date: Monday, December 16, 2019 11:27:00 AM Hello Rick, By letter dated November 21, 2019 (Agencywide Documents Access and Management System Accession No. ML19325C128), Exelon Generation Company, LLC (Exelon) submitted license amendment requests for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs). The proposed amendments would revise the Reactor Coolant Pump Flywheel Inspection Program. Specifically, the proposed amendments would extend the reactor coolant pump motor flywheel examinations, to an interval not to exceed 20 years.
The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment and exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.
Based on the information provided in your submittal, the NRC staff has estimated that this license amendment request will take approximately 270 hours11.25 days <br />1.607 weeks <br />0.37 months <br /> to complete. The NRC staff expects to complete our review by the end of December 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with new estimates, will be communicated to Exelon during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.
If you have any questions, please contact me.
Michael L. Marshall, Jr.
Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-2871
Docket No. 50-317 and 50-318