ML19350A852

From kanterella
Jump to navigation Jump to search

Acceptance of Requested Licensing Action Revisions to Reactor Coolant Pump Flywheel Inspection Program
ML19350A852
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 12/16/2019
From: Marshall M
Plant Licensing Branch 1
To: Bryan Hanson, Enrique Villar
Exelon Generation Co
Marshall M, NRR/DORL/LPLI, 415-2871
References
EPID L-2019-LLA-0261
Download: ML19350A852 (2)


Text

From: Marshall, Michael To: Villar, Enrique:(GenCo-Nuc) (Enrique.Villar@exeloncorp.com)

Cc: James Danna (James.Danna@nrc.gov)

Subject:

Calvert Cliffs Nuclear Power Plant, Units 1 And 2 - Acceptance of Requested Licensing Action Re: Revisions to Reactor Coolant Pump Flywheel Inspection Program (EPID L-2019-LLA-0261)

Date: Monday, December 16, 2019 11:27:00 AM Hello Rick, By letter dated November 21, 2019 (Agencywide Documents Access and Management System Accession No. ML19325C128), Exelon Generation Company, LLC (Exelon) submitted license amendment requests for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Calvert Cliffs). The proposed amendments would revise the Reactor Coolant Pump Flywheel Inspection Program. Specifically, the proposed amendments would extend the reactor coolant pump motor flywheel examinations, to an interval not to exceed 20 years.

The U.S. Nuclear Regulatory Commission (NRC) staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment and exemption in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this license amendment request will take approximately 270 hours11.25 days <br />1.607 weeks <br />0.37 months <br /> to complete. The NRC staff expects to complete our review by the end of December 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with new estimates, will be communicated to Exelon during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact me.

Michael L. Marshall, Jr.

Senior Project Manager Plant Licensing Branch I Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 301-415-2871

Docket No. 50-317 and 50-318