Forwards IE Insp Rept 50-369/81-02 on 810112-16.No Noncompliance Noted
ML19350A840
Person / Time
Site: McGuire 
Issue date: 02/10/1981
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19350A839 List:
References
NUDOCS 8103160965
Download: ML19350A840 (2)


See also: IR 05000369/1981002

Text

.

!

(-

'o ner

UNITED STATES

'

d

o

8

NUCLEAR REGULATORY COMMISSION

~

'

n

3

E

REGION 11

t Q

"g

o[

ATLANTA, GEoRGl.A 3o303

101 MARIETT A ST., N.W., SUITE 3100

"

%.

FEB 101981

i

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC 28242

Gentlemen:

I

Subject: Report No. 50-369/81-02

i

This refers to the routine safety inspection conducted by G. L. Troup of this

office on January 12-16, 1981, of activities authorized by NRC Construction

Permit No. CPPR-83 for the McGuita facility, and to the discussion of our findings

held with T. J. Keane at the conclusion of the inspection.

,

1

Areas examined during the inspection and our findings are discussed in the

'

enclosed inspection report.

Within these areas, the inspection consisted of

selective exaainations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

InaccordancewithSection2.790oftheNRC's"RulesofPractice,"Part2,kitle

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make. a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared sa that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report wil; be placed in the Public Document Room.

!

Should you have any questions concerning this letter, we will be. glad to discuss

them with you.

Sincerely,

-f-

V-

~

hilip S

hr,

ief

.

Fuel Facili y and Materials

Safety Branch

Enclosure:

See Page 2

8103160965

.

y

,

.

FEB 101981

Duke Power Company

-2-

Enclosure:

Inspection Report No. 50-369/81-02

cc w/ encl:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager

.