Forwards IE Insp Repts 50-518/80-24 & 50-520/80-24 on 801112-13 & Notice of Violation,App a
ML19350A452
Person / Time
Site: Hartsville  Tennessee Valley Authority icon.png
Issue date: 01/14/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19350A440 List:
References
NUDOCS 8103160215
Download: ML19350A452 (2)


See also: IR 05000518/1980024

Text

.- ._

.-

.-.

--.

.

O

p rety

o

UNITED STATES

~ , ,

,7

NUCLEAR REGULATORY COMMISSION

.

,

g

-

r

REGION 11

\\

101 MARIETTA sT., N.W., SulTE 3100

s...../

^'wms'-

.

__

.

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

Subject: Report Nos. 50-518/80-24 and 50-520/80-24

This refers to the special inspection conducted by J. R. Harris of this office on

November 12-13, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-150 and CPPR-152 for the Hartsville Nuclear Plant facility. Our preliminary

findings were discussed with R. T. Hathcote at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as Appendix A.

In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC Public Document Room. If this report contains

any information that you believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold such infor-

mation from public disclosure. Any such application must include the basis for

claiming that the information is proprietary and the proprietary information

should be contained in a separate part of the document. If we do not hear from

you in this regard within the specified period, the report will be placed in the

Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

chem with you.

Sincerely,

-

-

.

C. E.' Murphy, Chi

Reactor Construction and Engineering

Support Branch

.

Enclosures:

(See Page 2)

8103160

.

-

._

.

- . . ~ .

T ::_ ..

.: -

-" -'-

"

.- .--. - ..

-

.

.'

JAN 141981

Tennessee Valley Authority

-2-

i

J

Enclosures:

1.

Appendix A, Notice of~ Violation

2.

Inspection Report Nos. 50-518/80-24

'

and 50-520/80-24

$

cc w/ encl:

R. T. Hathcote, Project Manager

J. F. Cox, Supervisor, Nuclear -

Licensing Section

- J. E. Wills, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

.

H. J. Green, Division Director

-

1

4

e

%

4

4

i

s

- . .

3

- ,-

,

- .

,r,

f.

y

e

-- --

e

v

-. .

. . - , - - -

- - - ,