Forwards IE Insp Repts 50-454/81-04 & 50-455/81-04 on 810424 & 0501.No Noncompliance Noted
ML19348A024
Person / Time
Site: Byron  Constellation icon.png
Issue date: 05/13/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19348A025 List:
References
NUDOCS 8105280284
Download: ML19348A024 (2)


See also: IR 05000454/1981004

Text

1

TlC

'o

UNITED STATES

8

NUOLEAR REGULATORY COMMISSION

~

e

g

l

3

.r

REGION lli

/[

Q,

799 ROOSEVELT ROAD

)

GLEN ELLYN. ILLINOIS 80137

MAY I 3 1981

tn

d

9

f[*f

N

q

Docket No. 50-454

I

Docket No. 50-455

-

2

MAY 2 71984 :S

Commonwealth Edison Company

('A' u.s, %.w,

,

9

ATTN:

Mr. Cordell Reed

g/

ca

..

Vice President

N

%

Post Office Box 767

Chicago, IL 60690

%

-::

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. C. M. Erb

and K. D. Ward of this office on April 24 and May 1,1981, of activities

at Byron Station, Units 1 and 2, authorized by NRC Construction Permits

No. CPPR-130 and No. CPPR-131 and to the discussion of our findings with

Mr. M. Stanish and Mr. W. Witt at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

l

your contractors believe to be eyempt from disclosure under 10 CFR 9.5(a)(4),

l

it is necessary that you (a) notify this office by telephone within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such infor-

mation.

Section 2.790(b)(1) requires that any such application .nust be

accompanied by an affidavit executed by the owner of the information which

identifies the document or part sought to be withheld, and which contains

a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

l

8305280%$

'

%

-

-

.

Commonwealth Edison Company

-2-

MAI I 3 I90I

'

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of th'e affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspection report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

,

Sincerely,

p

C. E. Norelius, Acting Director

Division of Engineering and

Technical Inspection

Enclosure: IE Inspection

Reports No. 50-454/81-04

and No. 50-455/81-04

cc w/ enc 1:

J. S. Abel, Director

of Nuclear Licensing

Gunner Sorensen, Site

Project Superintendent

V. I. Schlosser,

Project Manager

R. E. Querio, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mary Jo Murray, Office of

Assistant Attorney General

Myron M. Cherry

l

l

-

._

_

_

.

_ _ _ _ _

_

_ __