f5 U
'
[ca aeg#'o
UNITED STATES
^
j'
NUCLEAR REGULATOFtY COMMISSION
,
g
9
0
- n
RECtDN lll
b[
799 ROMfVELT ROAD
q
GLEN ELLYN,ILLINOls 6o137
o
MAY 8
1981
_
9g
// ^/q
Docket No. 50-456
p
- .
s
Docket No. 50-457
p
{
.
-
Commonwealth Edison Company
2
MAY 211981 >, -
ATTN:
Mr. Cordell Reed
tr
u.a, % %,
y/
Vice Presidant
mum
Post Office Box 767
b
Chicago, IL 60690
(3
%
s
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. H. Neisler
of this office on April 21-22, 1981, of activities at Braidwood Station,
Units 1 and 2 authorized by NRC Construction Permits No. CPPR-132 and
No. CPPR-133 and to tne discussion of our findings with Mr. R. Cosaro and
other members of your organization at the conclusion of the inspection.
&
The enclosed copy of our inspection report identifies areas ext. mined during
the inspection. Vithin these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with }PC requirements were identified during the
course of this inspection.
In accordance with 10 GR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by celephor:e within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) days from the date of
this letter a written application to this office to withhold such informa-
tion. Section 2.790(b)(1) requires that any such application must be
accompanied by an affidavit executed by the owner of the information which
a
810s ssoo%
q
F
d.
.
r
Commonwealth Edison Company
-2-
.
identifies the document or part sought to be withheld, and which contains
.a full statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspectiot report will be
placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
s
Ek
R. F. Heishman, Acting Director
Division of Resident and Project
Inspection
'
Enclosure:
IE Inspection
Reports No. 50-456/81-06
and No. 50-457/81-06
cc w/ encl:
J. S. Abel, Director
of Nuclear Licensing
R. Cosaro, Project
Superintendent
V. I. Schlosser,
Project Manager
J. F. Gudac, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
!
!
Local PDR
l
Mary Jo Murray, Office of
Assistant Attorney General
l
I
i
!
l
.
-
_
_
.