Forwards IE Insp Repts 50-456/81-06 & 50-457/81-06 on 810421-22.No Noncompliance Noted
ML19347G030
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 05/08/1981
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347G031 List:
References
NUDOCS 8105280092
Download: ML19347G030 (2)


See also: IR 05000456/1981006

Text

f5 U

'

[ca aeg#'o

UNITED STATES

^

j'

NUCLEAR REGULATOFtY COMMISSION

,

g

9

0

- n

RECtDN lll

b[

799 ROMfVELT ROAD

q

GLEN ELLYN,ILLINOls 6o137

o

MAY 8

1981

_

9g

// ^/q

Docket No. 50-456

p

- .

s

Docket No. 50-457

p

{

.

-

Commonwealth Edison Company

2

MAY 211981 >, -

ATTN:

Mr. Cordell Reed

tr

u.a, % %,

y/

Vice Presidant

mum

Post Office Box 767

b

Chicago, IL 60690

(3

%

s

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. H. Neisler

of this office on April 21-22, 1981, of activities at Braidwood Station,

Units 1 and 2 authorized by NRC Construction Permits No. CPPR-132 and

No. CPPR-133 and to tne discussion of our findings with Mr. R. Cosaro and

other members of your organization at the conclusion of the inspection.

&

The enclosed copy of our inspection report identifies areas ext. mined during

the inspection. Vithin these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with }PC requirements were identified during the

course of this inspection.

In accordance with 10 GR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you or

your contractors believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by celephor:e within seven (7)

days from the date of this letter of your intention to file a request for

withholding; and (b) submit within twenty-five (25) days from the date of

this letter a written application to this office to withhold such informa-

tion. Section 2.790(b)(1) requires that any such application must be

accompanied by an affidavit executed by the owner of the information which

a

810s ssoo%

q

F

d.

.

r

Commonwealth Edison Company

-2-

.

identifies the document or part sought to be withheld, and which contains

.a full statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed

in 10 CFR 2.790(b)(4). The information sought to be withheld shall be

incorporated as far as possible into a separate part of the affidavit.

If

we do not hear from you in this regard within the specified periods noted

above, a copy of this letter and the enclosed inspectiot report will be

placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

s

Ek

R. F. Heishman, Acting Director

Division of Resident and Project

Inspection

'

Enclosure:

IE Inspection

Reports No. 50-456/81-06

and No. 50-457/81-06

cc w/ encl:

J. S. Abel, Director

of Nuclear Licensing

R. Cosaro, Project

Superintendent

V. I. Schlosser,

Project Manager

J. F. Gudac, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

!

!

Local PDR

NSIC

TIC

l

Mary Jo Murray, Office of

Assistant Attorney General

l

I

i

!

l

.

-

_

_

.