Forwards IE Insp Rept 50-302/81-02 on 810203-0324.No Noncompliance Noted
ML19347F978
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/20/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Hancock J
FLORIDA POWER CORP.
Shared Package
ML19347F979 List:
References
NUDOCS 8105260750
Download: ML19347F978 (2)


See also: IR 05000302/1981002

Text

'

.

/ b

'

mr

UNITED STATES

  1. ^

8

NUCLEAR REGULATORY COMMISSION

n

$

E

REGION 11

0,

101 MARIETTA ST., N.W., SUITE 3100

,3

ATLANTA, GEORGIA 30303

'

APR 2 01981

.a

,

' . .

4

/b

Florida Power Corporation

N

O

ATTN: J. A. Hancock, Assistant

D

' \\..

2 % A

Vice' President

(J N

'

J L

i

LJ D

.

Nuclear Operations

2'

I'lM 2 21981 * 8

P. O. Box 14042, Mail Stop C-4

-

NJAW "a~s.

St. Petersburg, FL 33733

s

Gentlemen:

Subject: Report No

This refers to the routine safety inspection conducted by T. Stetka of this

office on February 3 - March 24,1981, of activities authorized by NRC License

No. OPR-72 for the Crystal River 3 facility and to the discussion of our findings

held with D. Poole, T. Lutkehause and other members of your staff at the-

conclusion of the inspection.

a

Areas examined during the inspection and our findings are discussed in' the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

Three new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

l

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

,

to this office to withhold such information from public-disclosure. Any such

'

!

aoplication must include a full statement of the reasons on the basis of which it

!

is claimed that the information is proprietary, and should be prepared so that

proprietary information identified in the application is contained in a separate

part of the document.

If we do not hear from you within the specified period,

the report will be placed in the Public Document Room.

i

l

l

l

- .

-

s

.

' G

810s 200 750

.

..

.

-.

.

.

Florida Power Corporation

2

Apg 2 01981 ~

a

.

,

^

.Should you have any questions concerning this letter, we will be glad to discuss

them with you.

. .-

'

'

Sincerely,

.

$. C

.

R. C.

ewis, Acting Director

i

Division of Resident and

Reactor Project Inspection

Enclosure:

Inspection Report No. 50-302/81-02

'

cc w/ encl:

D. C. Poole, Nuclear Plant Manager-

5.4

..

!

!

I

m

p W

i

I

.

O

w

1

e

.

  • . g

!

l'

\\

I

,

_

4

--r-.-y---,-.--,--,,--.,--.+..e

,-.,.,,w.~,..,--

-. - - , - - ,, , . -

..,-.,-,w--,

y,%-

- - - . - - -.

-.--,-,

.m.,

. . ~. .--. --

.

, , ,,

--.,m

.-

--n..

-- --- .

,