ML19347F712
| ML19347F712 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 04/13/1981 |
| From: | Norelius C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19347F713 | List: |
| References | |
| NUDOCS 8105260097 | |
| Download: ML19347F712 (2) | |
See also: IR 05000454/1981003
Text
_ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
'
- -
[e an.oq
fG
1,,
UNITE 7 STATES
8'
NUCLEAR REZULATORY COMMISSION
o
k
E
REGION 111
$
8
799 ROOSEVELT ROAD
glr.4 ELLYN, ILLINOIS 60137
APR 1 3 1981
eyMhhg
Docket No. 50-454
Q
p
Docket No. 50-455
g
f
.,
-
I') O
Commonwealth Edison Company
G y# g% f,f g %
ATTN:
Mr. Cordell Reed
C
/Sg7A /r
k'N
Vice President
%
A2
Post Office Box 767
Gentlemen:.
bg (TQ \\')
thicago, IL 60690
,<[
'
Cu I
N
'
'Ihis refers to the routine inspection conducted by Mr. C. M. Erb of this
office on March 19, 25 and 26, 1981, of activities at Byron Station, Units
1 and 2, authorized
i NRC Conatruction Permits No. CPPR-130 and No.
CPPR-131 and to tt
acussion of our findings with Mr. G. Sorensen at the
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, t?
inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with F ^ q uirements, as specified in enclosed Appendix A.
A written respo'
3mitted under oath or affirmation is required.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
' and your response to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhold
such information from public disclosure. The application must include a full
statement of the reasons for which the information is considered proprietary,
ani should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
.
8105260097
q. ..
.
i
.
Commonwealth Edison. Company
'2 -
-
APR 1 3 1981-
-
We will gladly discuss any.questi;ns.you have concerning this inspection.-
. Sincerely,
,
S.S.
M
C. E. Norelius, Acting Director
Division of Engineering and
Technical Inspection
Enclosures:
1.
Appendix A, Notice
,
of Violation
2.
IE Inspection Reports
No. 50-454/81-03 and
No. 50-455/81-03
'
cc w/ enc 1:
J. S. Abel, Director
of Nuclear Licensing
Gunner Sorensen, Site
Project Superintendent
V. I. Schlosser,
Project Manager
R. E. Querio, Station
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
-
L
Mary Jo Murray, Office of
Assistant Attorney General
Myron M. Cherry
'
,
9
O
ya
.+.,.s-
, - - , -
e--
y
e.
a-e-+.&
--. -
+ ,- ,-.
--+=>w-e
.<va-
>w',-y
%
y
.e-
,
yr
, - - - - w
--e,e-~mg----