ML19347F506

From kanterella
Jump to navigation Jump to search
Forwards LER 81-025/03L-0
Date released: 12/27/2019 Download: ML19347F506


LER 81-025/03L-0:on 810417,EFP-2 Control Switch Discovered in Off Position.Caused by Procedural Deficiencies.Procedures Modified to Require Assurance That EFP-2 Is Selected to Auto
ML19347F507
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/12/1981
From: Hernandez V
FLORIDA POWER CORP.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347F507 (2)
Forwards LER 81-025/03L-0
ML19347F505
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 05/12/1981
From: Baynard P
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19347F505 (1)