ML19347E829

From kanterella
Jump to navigation Jump to search
Forwards IE Safety Insp Repts 50-324/81-02 & 50-325/81-02 on 810101-31 & Notice of Violation
ML19347E829
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 03/16/1981
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML19347E827 List:
References
NUDOCS 8105130462
Download: ML19347E829 (2)


See also: IR 05000324/1981002

Text

{{#Wiki_filter:o . . p n ne: gD UNITED STATES . (E'd Ni NUCLEAR REGULATORY COMMISSION / $ E ' REGION 11 [[ 101 MARIETTA ST.. N.W., SUITE 3100 Q ATLANTA. GEORGIA 30303 ..... MAR 1 6'1981 Carolina Power and Light Company ATTN: J. A. Jones Senior Executive Vice President and Chief Operating Officer 411'Fayetteville Street Raleigh, NC 27602 Gentlemen: SUBJECT: Report Nos. 50-324/81-02 and 50-325/81-02 This refers to the routine safety inspection conducted by D. F. Johnson of this office on January 1-31, 1981, of activities authorized by NRC Operating License Nos. DPR-71 and DPR-62 for the Brunswick facility. Our preliminary findings were discussed with C. R. Dietz at the conclusion of the inspection. Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of selective examinations of procedures and representative records, interviews with personnel, and observations by the inspector. During the inspection, it was found that certain activities under your license appear to violate NRC requirements. These items and references to pertinent requirements are listed in the Nod ce of Violation enclosed herewith as Appendix A. Elements to be included in your response are delineated in Appendix A. , In addition to the need for corrective action regarding these specific violations, we are concerned about the implementation of your management control systems that permitted their occurrence. Consequently, in your reply, you should describe in particular those actions taken or planned to improve the effectiveness of your management control systems. Two new unresolved items are identified in the enclosed inspection report. These items will be examined during subsequent inspections. In acc ance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title 10, C4 of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC Public Document Room. If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include the basis for claiming that the information is proprietary and the proprietary information should be contained in a separate part of the documert. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room. slosiso W . . -

- . _ . . . NAR1 ef . Carolina Power and Light Company -2- Should you have any questions concerning this letter, we will be glad to discuss ' them with you. - Sincerely, % .g%00- _ T ames P. O'Reilly ' rector Enclosures: 1. Appendix A, Notice o iolation 2. Inspection Report Nos. 50-3z4/81-02 and 50-325/81-02 cc w/ encl: C. R. Dietz, Plant Manager

, e

i . , , ,,e_ ,. _ - _ . -- -- ---,-4 - i-,. -.,c,,- e, , w ,-- -e- ~ , -yw, }}