l.

[v7 DUQUESNE LIGilT COMPANY Nuclear Division to E

r N

i H E s

C s ,,,,,,,,,,,

A e a an, s ==see me nuctem omsson canarmcion omeon C

ta

_ ~

  • a== .-

. . -, . me.- ......

I %m mes ttenene seeme E*,P'*""4 w

su.s sw eme s_.

co -

oesa ce

_a -_

w cm  %

s= =

w m

s, wm Figure 6.2-1 Of fsite Organization (Partial)

  • Indicates Fire Protection Responsibility

a Sta.tten..,

Supt.

=

e- .

Q

  • o 1ll.

aluclear Chief leuclear -

2 Results brdinator

- Radle tien Control Supv. Engineer & Refueling I

1 I I Reactor Control Techalcal leuclear Station Technical _ Senter Ener.

Chemist Supv. - Iluclear Oper. Supv. Advisory Engr. Design Centrol I

belear

  • Shift Tech. -

Senter Engr.

Radiocheatst Shift Supv. Advisors Refueling

  • T u

huclear Station Malatenance _

Chemists Engineers Oper. Foremen Supervisor Radiation _ Ieuclear Nintenance Control Engr. Control Oper. Englacers leuclear Malatenance Operators Forecen l Radiation Centrol h intenance Forenen Technicians l '

l l

Radiation Technicians FACKITY caGANIIATI0ll FIGURE 6.2.2

ADMINISTRATIVE CONTROLS 6.3 FACILITY STAFF QUALIFICATIONS 6.3.1 Each member of the facility staff shall meet or exceed the minimum qualifications of ANSI N18.1-1971 for comparable positions, except for the Radiation Control Supervisor who shall meet or exceed the qualifications of Regulatory Guide 1.8 September 1975, and the Shift Technical Advisor who shall have a bachelor's degree or equivalent in a scientific or engi-neering discipline with specific training in plant design and response analysis of the plant for transients and accidents.

6.4 TRAINING 6.4.1 A retraining and replacement training program for the facility staff shall be maintained under the direction of the Training Supervisor and shall meet or exceed the requirements and recommendations of Section 5.5 of ANSI N18.1-1971 and Appendix "A" of 10 CFR Part 55.

6.4.2 A Training progra:a for the Emergency Squad shall be maintained under the direction of the Training Supervisor and shall meet or exceed the require-sr.2nts of Section 27 of the NEPA Code-1976.

  • 6.5 REVIEW AND AUDIT 6.5.1 ONSITE SAFETY COMMITTEE (OSC)

FUNCTION 6.5.1.1 The OSC shall function to advise the Plant Superintendent on all matters related to nuclear safety.

COMPOSITION __ __

6.5.1.2 The OSC shall be composed of the:

Chairman: Chief Engineer

~ ~ ~

Member: Senior Licensed Operator

~~ Member: Radiation Control Foreman _ ---

Member: Maintenance Engineer

_ _ . . _ _ Member: Senior Engineer - Station Engineering.. .-._ _ - - -

Member: Technical Supervisor __

l Member: Shift Technical Advisor Member: Chemist

~

ALTERNATES .

6.5.1.3 All alternate members shall be appointed in writing by the OSC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in OSC activities as any one time.

i

BEAVER VALLEY - UNIT 1 6-5 PROPOSED WORDING

ADMINISTRATIVE CONTROLS MEETING FREQUENCY 6.5.1.4 The OSC shall meet at least once per calendar month and as convened by the OSC Chairman or his designated alternate.

QUORUM 6.5.1.5 A quorum of the OSC shall consist of the Chairman or his designated alternate and four members including alternates.

RESPONSIBILITIES ,

6. 5.1. 6 The OSC shall be ' responsible for:
a. Review of 1) all procedures required by Specification 6.8 and changes thereto, 2) any other proposed procedures or changes thereto as determined by the Plant Superintendent to affect nuclear safety.
b. Review of all proposed tests and experiments that affect nuclear safety.
c. Review of all proposed changes to Appendix "A" Technical Specifications.
d. Review of all proposed changes or modifications to plant systems or equipment that affect nuclear safety.
e. Investigation of all violations of the Technical Specifications including the preparation and forwarding of reports covering evaluation and recommendations to prevent recurrence to the Manager of Nuclear Operations and to the Chairman of the Offsite l Review Committee,
f. Review of those REPORTABLE OCCURRENCES requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission.
g. Review of facil'.ty operations to detect potential safety hazards.
h. Performance of special reviews, investigations or analyses and reports thereon as requested by the Chairman of the Offsite Review Committee.

BEAVER VALLEY - UNIT 1 6-6 PROPOSED WORDING

ADMINISTRATIVE CONTROLS

1. Review of the Plant Security Plan and implementing procedures and shall submit recommended changes to the Chairman of the Offsite Review Committee.
j. Review of the Emergency Plan and implementing procedures and shall submit recommended changes to the Chairman of the Offsite Review Committee.

AUTHORITY 6.5.1.7 The OSC Shall:

a. Recommend to the Plant Superintendent written approval or disapproval of items considered under 6.5.1.6(a) through (d)above,
b. Render determinations in writing with regard to whether or not each item considered under 6.5.1.6(a) through (e) above constitutes an unreviewed safety question.
c. Provide written notification within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the Manager of Nuclear Operations and the Offsite Review Committee of disagreement between the OSC and the Plant Superintendent; however, the Plant Superintendent shall have responsibility for resolution of such disagreements pursuant to 6.1.1 above.

RECORDS 6.5.1.8 The OSC shall maintain written minutes of each meeting and copies shall be provided to the Manager of Nuclear Operations and Chairman of the Offsite Review Committee. l 6.5.2 0FFSITE REVIEW COMMITTEE (0RC)

PJNCTION 6.5.2.1 The ORC shall function to provide independent review and audit of designated activities in the areas of:

a. nuclear power plant operations
b. nuclear engineering l

l BEAVER VALLEY - UNIT 1 6-7 PROPOSED WORDING

ADMINISTRATIVE CONTROLS

c. chemistry and radiochemistry
d. metallurgy
e. instrumentation and control
f. radiological safety
g. mechanical and electrical engineering
h. quality assurance practices COMPOSITION 6.5.2.2 The ORC shall be composed of the:

Chairman: Manager, Nuclear Safety and Licensing Vice Chairman: Manager of Nuclear Engineering, Nuclear Division Member: Nuclear Engineer, Mechanical Engineering Department Member: Manager of Nuclear Operations l Member: Instrument Engineer, Power Stations Department Member: Super'.isor, Central Chemical Laboratory Power Stations Department Member: Mechanical Engineer, Mechanical Engineering Department Member: Quality Assurance Manager, Quality Assurance Department Member: Coordinator, Safety Review Committee, Nuclear Division Member: Health Physicist, Nuclear Division Member: Beaver Valley Power Station Project Manager ALTERNATES 6.5.2.3 All alternate members shall be appointed in writing by the ORC Chairman to serve on a temporary basis; however, no more than two alternates shall participate as voting members in ORC activities at any one time.

CONSULTANTS 6.5.2.4 Consultants shall be utilized as determined by the ORC Chairman to provide expert advice to the CRC.

BEAVER VALLEY - UNIT 1 6-8 PROPOSED WORDING

I AUDITS I

6.5.2.8 Audits of facility activities shall be performed under the ,

cognizance of the ORC. These audits shall encompass:

a. The conformance of facility operation to provisions contained within the Technical Specifications and applicable license conditions at least once per 12 months.
b. The performance, training and qualifications of the entire facility staff at least once per 12 months.
c. The results of actions taken to correct deficiencies occurring in facility equipment, structures, systems or method of operation that affect nuclear safety at least once per six months.
d. The performance of activities required by the Quality Assurance Program to meet the criteria of Appendix "B," 10 CFR 50, at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.
e. The Facility Emergency Plan and implementing procedures at least once per 24 months.
f. The Facility Security Plan and implementing procedures at least once per 24 months.
g. Any other area of facility operation considered appropriate by the ORC or the Vice President, Nuclear.
h. The Facility Fire Protection Program and implementing procedures at least once per 24 months.
i. An independent fire protection and loss prevention program inspection and audit shall be performed at least once per 12 months utilizing either qualified offsite licensee personnel or an outside fire protection firm.

J. An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outsider fire consultant at least once per 36 months, AUTHORITY 6.5.2.9 The ORC shall report to the Manager of Nuclear Safety and Licensing and advise the Vice President, Nuclear Division on those areas of responsi-bility specified in Sections 6.5.2.7 and 6.5.2.8.

RECORDS 6.5.2.10 Records of ORC activities shall be prepared, approved and distributed as indicated on the following pages:

BEAVER VALLEY - UNIT 1 6-10 PROPOSED WORDING

l l

ADMINISTRATIVE CONTROLS

a. Minutes of each ORC meeting shall be prepared, approved and famarded to the Vice President, Nuclear Division within 14 days following each l meeting.
b. Reports of reviews encompassed by Section 6.5.2.7 above, shall be prepared, approved and fomarded to the Vice President, Nuclear Division within 14 days following completion of the review.
c. Audit reports encompassed by Section 6.5.2.8 above, shall be fomarded to the Vice President, Nuclear Division and to the l management positions responsible for the areas audited within 30 days after completion of the audit.

~

6.6 REPORTABLE OCCURRENCE ACTION 6.6.1 The following actions shall be taken for REPORTABLE OCCURRENCES:

a. The Commission shall be notified and/or a report submitted pursuant to the requirements of Specification 6.9.
b. Each REPORTABLE OCCURRENCE requiring 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> notification to the Commission shall be reviewed by the OSC and submitted to the ORC and the Manager of Nuclear Operations.

l 6.7 SAFETY LIMIT VIOLATION 6.7.1 The following actions shall be taken in the event a Safety Limit is violated:

a. The facility shall be placed in at least H0T STANDBY within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />,
b. The Safety Limit violation shall be reported to the Commission, the Manager of Nuclear Operations and to the ORC within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. j
c. A Safety Limit Violation Report shall be prepared. The report shall be reviewed by the OSC. This report shall describe (1) applicable circumstances preceding the violation, (2) effects of the violation upon facility components, systems or structures, and (3) corrective action taken to prevent recurrence.
d. The Safety Limit Violation Report shall be submitted to the Commission, the ORC and the Manager of Nuclear Operations within 10 days of the violation.

BEAVER VALLEY - UNIT 1 6-11 PROPOSED WORDING

5.0 ADMINISTRATIVE CONTROLS Objective To define the organization, assign responsibilities, describe the environmental surveillance procedures, provide for a review and audit function and prescribe the reporting requirements in order to insure continuing protection of the environment and implement the Environmental Technical Specifications.

, 5.1 ORGANIZATION Figure 5.1-1 is a partial organization chart of the Nuclear Division l which includes groups and individuals responsible for environmental protection, environmental monitoring and the implementation of the Environmental Technical Specifications following the issuance of an operating license for Beaver Valley Unit No.1.

5.2 RESPONSIBILITY All activities within the Nuclear Division are the responsibility of the Vice President, Nuclear. He delegates the responsiblity for the radiological and ecological environmental monitoring programs to the Manager, Nuclear Safety and Licensing. He is advised by the l Off-Site Review Committee in matters relating to the environmental impact of station operation which involve proposed changes to the Environmental Technical Specifications, proposed changes to written procedures, proposed changes or modifications to station systems or equipment, evaluations of investigations, and when appropriate, recommendations to prevent recurrence of such violations.

I The Station Superintendent is the individual charged with the respon-sibility for assuring that all releases to the environment shall be limited in accordance with the Limiting Conditions for Operations as described in the Environmental Technical Specifications. Controlled

] releases are made utilizing written procedures under the direction of 1

the Shift Supervisor at the request of the Reactor Control Chemist who specifies the release rate, the station operating conditions, and the monitoring requirements which must be maintained during the release to ,

comply with the technical specifications. These activities are reviewed '

by the Results Coordinatcr and the Station Operating Supervisor and e

audited periodically under the direction of the Manager of Nuclear Safety and Licensing.  !

The Station Superintendent is also responsible for the issuance of the 24-hour reporting requirement to the Director of Regional Regulatory Operations Office, when required.

1 l

5-1

~

Vice $ resident '

Nuclear Division i

I I Hanager Manager Nuclear Operations Nuclear Safety and Licensing l

ORC Station coordination Superintendent llealth Physicist i

Station IReview Staff Y

b' Environmental Coordinator I

On-Site a Environmental Program Off-Site (Effluents) Environmental Programs Figure 5.1-1 Duquesne Light Company Nuclear Division Partial Organization Chart Relative to Environmental Matters

5.3 REVIEW AND AUDIT The Health Physicist is responsible to the Off-Site Review Committee l for reviewing the results of the Environmental Surveillance Program to determine that the sampling program is being implemented as described to verify that the environment is adequately protected under the exist-ing station operating procedures. He is also responsible for requesting that analyses be repeated or that new samples be obtained from particular locations in the case of anomalous results.

The Health Physicist is responsible to the Off-Site Review Committee l for scheduling audits utilizing various company personnel to verify that station operations including releases to the environment are conducted in such a manner that continuing protection to the environment is provided. The Health Physicist shall also have the responsibility l for reviewing off-site environmental program sampling, analyses and calibration procedures as summarized in Table 3.1-3 and 3.2-1 and described in Sections 3.0 and 5.5.1 of these specifications. The Beaver Valley Power Station Superintendent is responsible for approving I on-site procedures relative to the environent as described in Tables 2.4-2 and 2.4-4 and described in Section 2.0 and Section 5.5.1 of these specifications.

The Off-Site Review Committee functions as they relate to the Environ-mental Technical Specifications are as follows:

a. Review the reports of the Health Physicist on the results of the environmental monitoring program prior to their {

submittal to the NRC in each Annual Environmental Operating Report. See Section 5.6.1.

b. Review and make recommendations on proposed changes to the Environmental Technical Specifications and the evaluated impact of the changes.
c. Review proposed changes or modifications to plant systems or equipment and the evaluated impact which would require a change in the procedures described in (d) below.
d. Review reported instances of violations of Environmental Technical Specifications and abnormal environmental occur-rences. Where investigation indicates, evaluate and for-mulate recommendations to prevent recurrences.
e. Schedule audits of station operation with regard to the I control of releases to the environment.
f. Review and compare the Safety Technical Specifications and the Environmental Technical Specifications to avoid conflicts and maintain consistency.

5-3

5.4 ACTION TO BE TAKEN IF A LIMITING CONDITION FOR OPERATION IS EXCEEDED i

5.4.1 Remedial Action Immediate remedial actions as permitted by these technical specifications will be implemented until such time as the limiting condition for operation is met.

5.4.2 Investigation The Manager, Nuclear Safety and Licensing shall direct that an l investigation be conducted to determine the cause of the occurrence and recommend both temporarf and permanent corrective action to prevent a recurrence. The results of this investigation shall be reviewed and approved by the Off-Site Review Committee and the Manager, Nuclear Operations. l 5.4.3 Report The occurrence shall be reported to the NRC as specified in Section 5.6.2.

5.5 PROCEDURES 5.5.1 Written Procedures Detailed written procedures, including check lists and special instructions when required, will be prepared and implemented for all activities involving releases to the environment, described in Sections 2.0 and 3.0, the sampling and monitoring of these releases and the conduct of the Environmental Surveillance Program.

These procedures will include sampling, instrument calibration, analysis, and actions to be taken when limits arc approached or exceeded. Testing and calibration frequencies of effluent alarms and monitoring instruments will be included. These frequencies will be determined from experience with similar instruments in similar environments and from manufacturers' recommendations.

5.5.2 Standard Operating Procedures Plant standard operating procedures will include, when required, sufficient precaution, limitations, and setpoints to ensure that all plant systems and components are operated in ccmpliance with the limiting conditions for operations established in Section 2.0 of these technical specifications.

5.5.3 Reviews All procedures described above, and all changes thereto, will be reviewed prior to implementation and periodically thereafter as described in Section 5.3. Temporary changes to procedures which do not change the intent of the original procedure may be made without the need for review by NRC. Changes to procedures for programs in Section 3 will be reviewed by the NRC. Such changes will be documented.