Text
Y
D
M
4,
UNITED STATES
NUCLEAR REGULATORY COMMISSION
7, g
i
'
%.
_
j
REGION IV
jf
611 RYAN PLAZA DRIVE. SUITE 1000
"'
,% , ,. , . ,s'
ARLINGTON. TEXAS 76011
^
In Reply Refer To:
'
RIV
Docket No. 50-445/Rpt. 81-01
q l J.
50-446/Rpt. 81-01
g
L
yg.
4
.
Texas Utilities Generating Company
5
IMR 2519815 h
ATTN: Mr. R. J. Gary, Executive Vice
9 Woue mmum,, g;
President and General Manager
2001 Bryan Tower
(
)g
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. R. G. Taylor, during January 1981, of activities authorized by NRC
Construction Permits No. CPPR-126 and 127 for the Comanche Peak facility,
Units No. I and 2, and to the discussion of our findings wi+.h Mr. R. G.
Tolson of your staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, intersiews
with personnel, and observations by the inspector.
Within the scope of the inspection, no violations were identified.
We have also examined actions you have taken with regard to previously identi-
tied inspection findings.
The status of these items is identified in para-
graph 2 of the enclosed report.
l
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
!
inspection report will be placed in the NRC's Public Document Room.
If the
l
l
report contains any infonnation that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
!
of the .date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it is claimed that the information is proprietary.
The application should
OQ
l
8108260
k
s
.
Texas Ur.ilities Generating Company
2
February 13, 1981
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not near from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
.g
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
,/l'W/ i
L'-
W.C.Seid\\e, Chief
Reactor Construction and
Engineering Support Branch
Enclosure:
IE Inspection Report No. 50-445/Rpt. 81-01
50-446/Rpt. 81-01
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201