ML19347D501

From kanterella
Jump to navigation Jump to search
Advises That Encl Page 15.2-22b in FSAR Amend 24 Was Mistakenly Renamed & New Page 15.2-22b Was Added.Renamed Page Will Be Added to FSAR in Next Amend to Bridge Info Currently on Pages 15.2-22b & 15.2-23
ML19347D501
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 03/20/1981
From: Nichols T
SOUTH CAROLINA ELECTRIC & GAS CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8103260275
Download: ML19347D501 (2)


Text

{{#Wiki_filter:' F e SOUTH CAROLINA ELECTRIC & GAS COMPANY Post orrier son re4 CotuMe:A. south CAROLINA 29218 T.C.NICHOL5.JR. we p.... c c.ccor~c March 20, 1981 me ouer......... o.c in#,. g 4 (. s, .e c.% a # If, %g / Mr. Harold R. Denton, Director 4 Office of Nuclear Reactor Geulation bi .s U. S. Nuclear Regulatory Commission Q / Washington, D. C. 20555 4Q \\

Subject:

Virgil C. Summer Nuclear Station Docket No. 50/395 Boron Dilution Event - FSAR

Dear Mr. Denton:

In FSAR Amendment 24. the attached page 15.2-22b was mistakenly renamed and a new page 15.2-22b was added. The page which was renamed will be added back into the FSAR in the next amendment to bridge the information currently found on pages 15.2-22b and 15.2-23. If you have any questions, please let us know. Very truly yours, T. C. Nichols, Jr. RC:TCN:pj Attachment I CC: V. C. Summer w/o att. l G. H. Fischer w/o att. T. C. Nichols, Jr. w/o att. C. A. Price D. A. Nauman W. A; Williams, Jr. i R. B. Clary A. R. Koon A. A. Smith. H. N. Cyrus J. B. Knotts, Jr. J. L. Skolds B. A. Bursey O. S. Bradham ISEG NPCF/Whitaker File PRS 8108260,275 j

Dilution flow is assumed to be a naximirm of 150 gpm, which is the ~ capability of one primary water ir.akeup pump to deliver unborated p,(' ) water to the PCS, A mininum RCS water volume of 5000 ft3 is used. This is a conser-vative estimate of the active RCS volume with one reactor coolant 23 s ) pump operating. 4. Dilution During Startup T .,/ Prior to startup, the RCS is filled with borated water at a bcron concentration of 1555 ppa. This is a conservative estimate with the reactor at a 1.77% Ak/k shutdown margin at 5570F, Core monitoring is by external BF3 detectors. Mixing of the reac-tor coolant is acce.nplished by operation of the reictor coolant pumps. High source range flux level ara all reactor trip alarms are effective. ,(, In the analysis, a conservatively high dilution flow capacity for the centrifugal charging pumps is considered (approximately 300 spm). A minimum volume of 7360 ft3 in the reactor coolant system 23 is used. This corresponds to the active volume of the RCS excluding the pressurizer.

5.. Dilution During Full Power Operation 23 the dilution rate is k'i th the unit at power _ and the RCS at pressure,

( limited by the capacity of the charging valve (analysis is performed assuming two charging pumps are in operation although only 23 (? *. s_. -{f 15.2-22b AMENDM?.NT 23 J ant'ARY, 1981}}