YANKEE ATOMIC ELECTRIC COMPANY
/.
N.
9.C.9.I r
3 Ya_ Q _m&,
s.
1671 Wortater Rcrad, Frommgham, Massachusetts 01701 yyy 31_34 uxes m-kjy a
February 27, 1981 60' 1i,3 l\\ !P
'k United States Nuclear Regulatory Commission k
b
,,"n a 0 9193I *~ l' Wash ington, D. C.
20555
]
p on k1 Attention:
Divisicn of Licensing og u.b S [ von R
Mr. Darrell G. Eisenhut, Director
,A P
'q,l
[8 Office of hcC. ear Reactor Regulation st\\\\J Hererence:
(a)
License No. DPR-3 (Doc,<et No. 50-29)
(b) KMC Lettu to USNRC for SEP Owners Group, dated December 5, 1950 (c)
USNRC Letter to SEP Licensees, dated January 14, 1961 (d)
YAEC Letter to USNRC, cated February 4, 1931, FYR B1-19 Sub ject :
Further Clarification of the Systematic Evaluation Program (SE?)
Dear Sir:
References (c) and (d) specify certain commitments discussed previously in meetings with tne SEP Owner's Group and representatives of the NRC SEP staff.
In a meeting held on February 19. 1981 further clarification of the Commission's intentions regarding the Systematic Evaluation Program were presented.
Inis letter is submitted to reconfirm cur intention to complete l
the Systematic Evaluation Program in an expeditious manner and consistent with l
tne clarification discussed in the February 19th meeting.
Specifically:
(1)
Yankee has reviewed its previous commitments against tnose suggestea cy NRC staff at the February 19. 1931 meetiag and concluded that it can support 15 items icentified in Table 1.
These topics all have complete SER's on another plant but are in.he very preliminar stages on Yankee (status 0, 1, 2 or 3).
l (2)
Yankee will support NRC's lead topic concept on two issues as modified at tne February 19, 1931 meeting:
II 4.E Dam Integrity IX-5 Ventilation Systems (3)
Iankee intends to re lew draft SER's issued by the sta ff on a timely basis (30 cuys whc possible).
1 Yankee would li._ co have more topics cceplete cy June but two refuelings i
scheduled in May preclude our ability te support additional topics at this time.
We trust that you fina tnis information satisfactory. However, if you have an'i questions, please contact us.
l Very truly yours, V";KEE ATOMIC ELECTRIC COMPANY J.
A. Kay l
8103100336 Senior Engineer - Licensing
v.^.NKEE ATOMIC ELECTRIC COMPANY j
TABLE 1 Topic Schedule II-1.B.
Population Distribution April 30, 1951 II-1.C.
Potential Hazards or Changes in Potential April 30, 1961 Har:ards Due to Transportation, Institutional Industrial, and Military Facilities II-2.C.
Atmospheric Transport and Diffusion June 30, ;931 Characteristics for Accident Analysis III-4.D Site Proximity Missiles (Including Aircraft)
June 30, 1931 VI-7.A.3 ECCS Actuation System June 30, 1981 VI-10.A.
Testing of Reactor Trip System and Engineered June 30, 1981 Safety Features Including Response Time Testing
.XV-P Spectrum of Steam System Piping Failures Inside June 30, 1981 and Outside of Containment (PWR)
XV-3 Loss of External Load, Turbine Trip, Loss of Jur.
30, 1981 Condenser Vacuum, Closure of Main Steam Isola-tion Valve (BWR), and Steam Pressure Regulatory Failare (Closed)
XV-5 Loss of Feedwater June 30, 1961 XV-7 Reactor Coolant Pump Rotor Seizure and June 30, 1981 Reactor Coolant Pump Shaft Break XV-9 Startup of an Inactive Loop or Recirc.lation June 30, 1931 Loop at an Incorrect Temperature XV-10 Cnemical and Volume Control System Malfunction June 30, 1931 that Results in 2 Decrease in the Boron Concen-tration in the Reactor Coolant' (PWR)
XV-12 Spectrue of Rod Ejection Accidents (PWR)
June 30, 19S1 XV-14 Inadvertent Operation of ECCS and Chemical June 30, 1931 and Volur.e Control System Malfunction that Increases Reactor Coolant Inventory XV-15 Inadvertent Opening of a' PWR Pressurizer Safety-June 30, 17S1 Re. lief Valve
~
.