f December 4, 1980
^9 P,3 p
5
=
d 3
Docket Nos. 50-266 o
and 50-301 Mr. Sol Burstein Executive Vice President Wisconsin Electric Power Company 231 West Michigan Street Milwaukee, Wisconsin 53201
Dear Mr. Buratein:
In conducting our review of your Technical Specification change request relating to removal of the rod bow penalty at Point Beach Nucle r Plant, Units 1 and 2, we have determined that we will need the additional infor-mation identified in the enclosure to continue the review.
In order for us to maintain our review schedule, your response is requested as soon as possible. Three signed originals and forty copies are required.
Please contact us if you have any questions concerning this request.
Sincerely, w
Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing
Enclosure:
Request for Additional Information cc w/ enclosure:
See next page 4
i 8012810 0fl f
Mr. Sol Burstein Wisconsin Electric Power Company cc:
Mr. Bruce Churchill, Esquire Mr. William Guldemond Shaw, Pittman, Potts and Trowbridge USNRC Resident Inspectors Office 6612 Nuclear Road 1800 M Street, N.W.
.D.
C.
20036 Two Rivers, Wisconsin 54241 oseph Mann Library 1516 Sixteenth Street Two Rivers, Wisconsin 54241 Mr. Glenn A. Reed, Manager Nuclear Operations Wisconsin Electric Power Company Point Beach Nuclear Plant 6610 Nuclear Road Two Rivers, Wisconsin 54241 Mr. Gordon Blaha Town Chairman Town of Two Creeks Route 3 Two Rivers, Wisconsin 54241 Ms. Kathleen M. Falk General Counsel Wisconsin's Environmental Decade 302 E. Washington Avenue Madison, Wisconsin 53703 Director, Criteria and Standards Division Office of Radiation Progra=s (ANE-460)
U.S. Environ = ental Protection Agency Washington, D.C.
20460 U. S. Environmental Protection Agency Federal Activities Branch Region Y Office ATTN: EIS COORDINATOR 230 S. Dearborn Street Chicago, Illinois 60604 Chairman Public Service Commissien of Wisconsin Hill Farms State Office Butiding Madison, Wisconsin 53702 O
I l
i ENCLOSURE Point Beach, Units 1 and 2, Technical Specification Changes 490.0 Reactor Fuels Section, Core Performance Branch 490.1 Describe what margins were used to offset the reduction in DNBR due to fuel rod bowir.g.
Has NRC approved these margins for Point Beach applications?
Ii not, please provide the necessary justification.
l 490.2 Are the margins used to offset rod bowing DNBR penalties employed solely for this purpose? If not, please provide justification for using these margins more than once.
490.3 The reduction in DNBR due to rod bowing for the loss-of-flow transient and N-1 loop operation is greater than the reduction in DNBR for other conditions.
Is additional available margin used, or is the calculated limiting DNBR sufficiently large to offset this incremental penalty.
490.4 Amend the basis of the technical specifications to identify each generic or plant-specific margin that has been used to offset the reduction in DNBR due to rod bowing.
Also reference either the source or approval of each generic margin.