g UNITED STATES
$ M. O h ATOMIC ENERGY COMMISSION WASHINGTON 25. D.C.
%%MJ
%n n '
" $ 1 ; '.E.
Docket No. 50-29 Change No. 18 Yankee Atomic Electric Conpany
[
hh1 Stuart Street
[.
Boston 16, Massachusetts
~~ ' ~ J
~
0!
Attention: Mr. Roger J. Coe E'
Vice President
=
Gentlemen:
?
b!
This refers to your recuest dated February 1, 1962 for AEC l-authorization to make Proposed Change No.18 in your facility pursuant to paragraph 3.A of License Nc. DPR-3, as amended.
We have reviewed your proposal that eight of the Normal Plant Operating Instructions contained in Section 50h of the license application be revised and consolidated so as to form three, more comprehensive instructions. The proposed change involves a change in the Technical Specifications attached as Appendix A to the License. Provided that the revisions listed below are made, operation of the reactor in accordance with the procedures pro-l posed in Proposed Change No. 18 does not present significant hazards considerations not cescribed or implicit in the license application as amended to June 23, 1961. Further, we find that there is reasonable assurance that the health and safety of the public will not be endangered by operation of the facility as proposed and as revised. A copy of our related hazards analysis is enclosed.
In view of the foregoing, Yankee Atomic Electric Company is hereby authorized under License No. DPR-3 to operate in accordance with the Proposed Operating Instructions described in Yankees letter dated February 1, 1962 entitled Proposed Change No.18 provided that the instructions are revised as set forth below:
Operating Instruction 50hAI
'2The pressurizer temperature III Precautiens 5.c.
and pressure must be controlled so that proper overpressure is maintained on the main coolant pumps."
soneooo77 rw e
..-p e,
' f3.Y16GQ Operating Instruction 50hAI The first sentence should be III Precautiens lh changed to read: "Daring normal approach to criticality a flux r:ultiplication rate of 1 decade /minuteorlessis acceptable."
Operating Instm etion SohAI "During normal approach to III Precautions 15 criticality, centrol rod with-drawal should be interrupted for approximately 1 minute whenever the count rate is doubled."
Operating Instm etion 50hC2 "The pressurizer temperature and III Precautions 1 pressure r:ast be controlled so that proper overpressure is maintained on the main coef agt pumps and so that pressurf commensurate with the chan ;e in e
reactor vessel NDT is not exceeded."
i Operating Instmetion 50hC2 "Since reactivity is being III Precautions h inserted as the reactor is cooled down, special attentica should be directed to the a
neutron instmmentation during this period."
Operating Instmetion 50hA2 "The pressurizer spray line shall III Precautions 9 not be isolated when the reactor power level is greater than 5 Mw Distribution thermal."
C. E. 3eck H. Steele S m.cerely yours, R. L:renstein R. Huard I. C. Case R. Cunningham E. Shar,ar Docket Rocm W-
~
~
P. Travelstead Formal t/ R h**
P. A. Merris-2 Suppl.
Director E. E. Eall L3-M readings Division of Licensing and Regulation
~
D. C. Clark CTEdwards E' CI*Cfdelosure:
j Hazards Analysic
=..
i
[DgR OGC DIAR,-
DLE1 DLER D f&
/4A
.g g P O.
Direfetor
' CII6rds/dk
- DASEE RgEryan
,=/ b/G h(
Y' '
[ll Tf6 Y S/A
-