Ack Receipt of 800918 Interim Deficiency Rept Re Mechanical Splices Not Meeting Visual Insp Requirements.Nrc Review Will Be Completed During Future Insp
ML19347C279
Person / Time
Site: Marble Hill
Issue date: 09/30/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Shields S
PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA
Shared Package
ML19347C280 List:
References
NUDOCS 8010170199
Download: ML19347C279 (1)


Text

F i

I t>*C8?%

UNIT ED ST ATES g,_

fg NUCLEAR REGULATORY COMMISSION

[

]

S REGloN lli

/

/

f 799 ROOSEVELT RO AD I'

D g

GLEN ELLYN, ILUNOIS 6007

.SEP 3 o g30 Docket No. 50-546 Docket No. 50-547 Public Service of Indiana ATIN:

Mr. S. W. Shields Senior Vice President Nuclear Division Post Of fice Box 190 New Washington, IN 47162 Gentlemen:

Thank you for your final report dated September 18, 1980, pursuant to 10 CFR 50.55(e) regarding mechanical splices (cadwelds) not meeting the visual inspection requirements. We will complete our review of this matter during a future inspection.

Your cooperation with us is appreciated.

Sincerely, WM w A

WA' -

Gaston Fiorelli, Chief Reactor Construction and Engineering Support Branch cc: Director, RCI/IE Director, AEOD Chief, OEB/MPA IE Files Mr. G. N. Brown, Project Director C. Kammerer, CA cc w/ltr dtd 9/18/80:

Central Files PDR Local PDR NSIC TIC LeBoeuf, Lamb, Leiby & MacRae Mr. Dave Martin, Office of Attorney General Mr. John R. Galloway, Staff Director, Environment, Energy and Natural Resources Subcommittee

  • 010170'f 3