Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. _ _ . _ . _ _ - _ . _. _ ._ . . __
!O i
i VIRGINIA ELECTRIC AND POWER COMPANY t
NORTH ANNA POWER STATION
$ MONTHLY OPERATING REPORT 1
j MONTH SentemberYEAR Jggo 1
i
.i 1
i 1
i i
J i
l 1
i APPROVED: l l
I l
i i'
lbt YTATION MANAGER 1Mf' v
4 4
801028o 6
1 4
i OPERATING DATA REPORT DOCKET NO.
- 0 DATE IU/d/DU COMPl.ETED BY W._A. Woodsmall, II I TELEPilONE 703/894-5151 i OPERATING STATUS North Anna 1 Notes
- 1. Unit Name:
- 2. Reporting Period: Sontorhor 1490
- 3. Licensed Thermal Power (MWt): 2775
]
l 4. Nameplate Rating (Gross MWe): 947 l 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 880
- 7. Maximum Dependable Capacity (Net MWe): 850 1
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since I.ast Report, Give Reasons:
N/A 3 9. Power Level To Which Restricted,1f Any (Net MWe): N/A
- 10. Reasons For Restrictions,If Any: N/A l
i This Month Yr..to.Date Cumulative
. I1. Ilours In Reporting Period 720 6.575 20.352
- 12. Number Of Hours Reactor Was Critical 713.9 5,693.7 15.858.9
- 13. Reactor Reserve Shutdown Hours 6.1 61.2 210.0
' 71 3.4 5,494.1 15,547.3
- 14. Hours Generator On.Line
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 1,887,261 14.045.342 40.325.255
- 17. Gross Electrical Energy Generated (MWH) 605,270 , _ ,
4.411.668 12.758.017
- 18. Net Electrical Energy Generated (MWH) 570.28d 4.147 69R 12 nn1 laa
- 19. Unit Service Factor 99.2 86.6 77.9
- 20. Unit Availability Factor 99.2 86.6 77.9
- 21. Unit Capacity Factor iUsing MDC Net) 93.2 74.2 69_4 l
- 22. Unit Capacity Factor (Using DER Net) 87.3 69.5 65.0
- 23. Unit Forced Outage Rate 4 9.I 6.5 l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Each):
Refuelina - December 31. 1980: six weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: M/4
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION N/77 i
DOCKET NO.80-338 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME . North Anna 1 DATE 1m_7.nn COMPLETED BY A ~. G . Neu fe r REPORT MONTil 90pte'"ber 1980 TELEPilONE (703) 894-5151
":.= c
--, jg 3 $ Y3 Licensee ,E-t, f, cause & Corrective No. Date i Eg @ js5 Event 3,7 gu? Action to H fg @ g g, Report er mo g Prevent Recurrence 6
80-21 800908 F 2.4 A* 3 80-80/03L-0 EB Genera Reactor Trip from Turbine Trip caused by "C" S/G Lo Lo Level when the output ,
breaker from inverter opened causing a loss of power to Vital Bus IV. Checke l fuses, grounds and reclosed output breaker from inverter.
80-22 800908 F 0.0 H* 3 N/A N/A N/A Hi Hi Level "C" S/G over filled during unit startup.
80-23 800930 F 0.1 A* 3 N/A N/A N/A Reactor Trip from Turbine Trip when 6th point heater level went above the high level trip point due to a tube failure.
Plugged affected tubes.
I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructisms S: Scheduled A Equipment Failure (Explain) I-Manual for Preparation of,ata B-Maintenance of Test 2-M.rnual Scram. Entr> Sheets foi Nensee C-Refueling 3 Aufomatic Scram. Event Report (L ') File tNURI:G-D-Regulatory Restriction 4-Other (Explain) 0161)
E Operator Training & License Exeninar;on F Administrative 5 G-Operational Error (Explain) Exhibit I Same Source 19/77) Il-Other (Explain)
4 Note 8-23 will be continued into month of October.
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO.80-338 REPORT MONTH Sept. UNIT NAME N. ANNA 1 YEAR 1980 DATE 10-7-80 COMPLETED BY 894-5151 ext. 221 1
l l
l 80-21 (A) When Vital Bus IV lost power, due to the inverter breaker l opening, the control for "A" S/G failed open. This diverted feed flow from "B" and "C" S/G's. "C" S/G Level went to the Lo Lo Level Reactor Trip Set Point before the "A" S/G Hi Level turbine trip could be actuated.
80-22 (H) S/G Level Control was in manual during the startup.
80-23 (A) A suspected tube failure in the 6B feedwater heater had occurred requiring removal of the heater from service.
When cooling water was valved out, the wat.cr volume in the shell side expanded, causing a high level automatic furbine Trip.
l l
l i
l l
i l
l
4 OPERATING DATA REPORT DOCKET NO. 50-339 i DATE 10/7/R0
! COMPLETED BY W. A. Woodsmall, IIH TELEPHONE 703/894/5151 OPERA flNG STATUS North Anna 2 N*t**
- 1. Unit Name:
- 2. Reporting Period: Sentorher 19R0 1
- 3. Licensed Thermal Power (MWt): 2775
- 4. Nameplate Rating (Gross MWe): 947
- 5. Design Electric'al Rating (Net MWe): 907 I 6. Maximum Dependable Capacity (Gross MWe): 928
- 7. Maximum Dependable Capacity (Net MWe): ROR
- 8. If Changes Occurin Capacity Ratings (Items Number 3 Through 7)Since Last Report. Gise Reasons:
s N/A
- 9. Power Level To which Restricted,if Any (Net MWe): M /o f M/A
- 10. Reasons For Restrictions,if Any:
i This Month Yr..to.Da te Cumulatise i1. Hours In Reporting Period 720 2.928 2.928
- 12. Number Of Hours Reactor Was Critical 476.8 1.213.2 1,213.2
- 13. Reactor Reserve Shutdown Hours 0 0 0
- 14. Hours Generator On.Line 461.5 516.5 516.5
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 615.501 659.318 659.318
- 17. Gross Electrical Energy Generated (MWH) 193,846 _,
202.020 202.020
- 18. Net Electrical Energy Generated (MWH) 177.547 184_109 1R4;109 i 19. Unit Service Factor N/A N/A N/A l 20. Unit Availability Factor N/A N/A N/A
- 21. Unit Capacity Factor (Using MDC Net) N/A N/A N/A
- 22. Unit Capacity Factor (Using DER Net) N/A N/A N/A
- 23. Unit Forced Outage Rate N/A N/A N/A j 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachi:
TMI and Fire Protection Modifications: November 1. 1980: 21 davs Maintonanrn- Anril 3. 14R1r 11 etaye
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed INITIAL CRITICA LITY 6/12/80 INITIA L ELECTRICITY R/25/R0 COMMERCIAL OPER ATION 11 /2?/80 to/Th
4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA 2 DAir 10/2/80 COMPLETED By W. A. Woodsmall, III TELEPHONE 703/894-5151 MONTH Seotember DAY AVERAGE D I Y POW R LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) 1 0 37 380
~
2 0 33 414 0 403 3
4 0 20 _
420 5 0 21 358 6 0 33 491 D 665 .
7 23 8 0 24 662 9 0 25 667 10 127 26 453 174 31 11 27 12 1A7 2s 113 181 ,
356 13 14 254 526 30 15 306 3, 16 230 INSTRUCTIONS On this format. list the average daily unit power levelin MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
UNIT Sif0TDOWNS AND POWER REDUCTIONS DOCKETNO. 50-339 UNIT NAME N. Anna 2 DATE 10-8-80 COMPLETED fly A. G. Neufer REPORT MONTil Son t ornh a" 1980 TELFPIIONE 894-5151 ext. 221
":e c
- jg 3 $ $] l.icensee ,En, $'%
Cause & Corrective No. Dale i 5g y
4 .s s 5 Event p g'S u
Atti"" I" H gg g Report it vi U g Present Recurrence 6
concluded 80-04 80-091n F 225.0 S E E A U G U ! T R E P 0 R T 80-05 800916 F 3.5 A* 3 NA NA NA Reactor trip / turbine trip due to low vacuum. Vacuum was lost while removi ig cover tc condensate pump suction strainer for cleaning because a valve to the strainer was not fully closed.
Valve and condensate suction strainer were cleaned.
80-06 800926 F 4.0 A* 3 NA NA NA Feedwater pumps tripped tripping the reactor. Cleaned Pump Suction Straine rs, 80-07 809927 S 20.6 3 B NA NA NA 50% test reactor trip per 2-5U-26 I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Schedufed A Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2 Manual Scram. Entry Sheets for 1.icensee C-Refueling 3- Automatic Scram. Event Repos (1.ER) File (NURI'G.
D-Regulatory Restriction 4-Other (Explain) 01611 E-Operator Tiaining A 1.icense Examination F Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source 19/77) Il-Other (Explain)
Page i
- f _ l -
UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50339 REPORT MONTH _ September UNIT NAME N. Anna 2 YEAR 1980 DATE 10-80
, COMPLETED BY A. G. Neufer (703) 894-5151 ext. 221 80-05 A While in the process of cleaning a condensate pump suction strainer one of the strainer valves'was not fully shut oue to debris under the valve seat. This caused a low vacuum condition tripping the turbine resulting in a reactor trip.
80-06 A While in new plant start-up condition, much rust and particulate is washing from secondary piping and accumulating in startup condensate pump suction strainers.
Unit 2 continues with startup power testing with commercial operations l scheduled for late November.
- +
1 s
4 1
1 l
i
.., -