Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML19347B949
Person / Time
Site: Perkins, Cherokee  
Issue date: 09/30/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Dail L
DUKE POWER CO.
References
NUDOCS 8010160275
Download: ML19347B949 (1)


Text

p reg -

UNITED STATES y

8 g',

NUCLEAR REGULATORY COMMISSION

/M8 n

REGION 11 Q

'[

101 MARIETTA sT., N.W., SUITE 3100 b

ATLANTA, GEORGIA 30303 o

SEP 3 01980 In Reply Refer To:

RI -

0-491 50-492 0-49 l

g

- 88 j 50-489 /

50-490 Duke Power Company ATTN:

L. C. Dail, Vice President Design Engineering i

P. O. Box 33189 Charlotte, NC 28242 Gentlemen:

The enclosed IE Supplement No. 2 to Bulletin No.79-01B is forwarded to you for information. No written response is required. If you desire additional l

i information regarding this matter, please contact this office.

Sincerely, Y

m i

James P. O'Reilly l

Director i

Enclosures:

l 1.

IE Supplement No. 2 to Bulletin l

No.79-01B 2.

List of Recently Issued IE Bulletins cc w/ enc 1:

J. T. Moore, Project Manager l

i l

1 l

l

~,..

n_

SSINS:

6820 Accession No.: 8008220241 i

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT i

WASHINGTON, D.C.

20555 l

September 30, 1980 IE Supplement No. 2 to Bulletin 79-01B: ENVIRONMENTAL QUALIFICATION OF CLASS 1E EQUIPMENT 1

Enclosed are the generic questions and answers which resulted from NRC/ Licensee i

ceetings in NRC Regional Offices during the week of July 14, 1980 regarding I

envirotmental qualification of Class IE equipment in use at power reactor facilities.

These answers address specific questions asked during the meetings.

Due to the generic nature of some of these questions, the staff is issuing them as a bulletin supplement. The regional meetings highlighted the fact that in some cases, the scope and depth of the 79-01B review was not clear to licensees. Therefore, these answers may affect your 79-01B submittal. These submittals are required by a separate order to be completed by November 1, 1980.

Some answers given in Supplement No. I to IEB-79-01B are superseded by these enswers. For example, in Bulletin Supplement No. 1, issued on February 29, 1980, the answer to question No. 5 specified that TMI lessons learned equipment was not included in the review. However, due to the extension of the response date from April 14, 1980 to November 1, 1980, this equipment is now being addressed since its installation is either complete or required before the issuance of the February 1,1981 SER.

(See Question No. 21 of this Supplement.)

No specific response is requested by this Supplement; however, all answers contained in the enclosure to this Supplemeat should be carefully reviewed and considered for applicability in your response to IEB 79-01B.

IE Bulletin No.79-01B was issued under a blanket GAO clearance (B180225 (R0072); clearance expired July 31, 1980) specifically for identified generic problems. Supplement No. 2 to Be'tletin 79-01B is for information, hence no GAO clearance is required.

Enclosures:

1.

Generic Questions and Answers to IEB-79-01B and Memorandum and Order (CLI-80-21) dated May 23, 1980 DUPLICATE DOCUMENT Entire document previously entered into system under: