ML19347B624
| ML19347B624 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 10/01/1980 |
| From: | Bodtke P CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | |
| Shared Package | |
| ML18045A781 | List: |
| References | |
| NUDOCS 8010150459 | |
| Download: ML19347B624 (4) | |
Text
.
OPER ATING D AT 4 REPORT DOCKET NO 50-255 DATE 10/1/80 COstPLETED BY PJBodtke TELEPHONE 616-764-8913 OPERATING ST ATLS N"'*5
- 1. Unit Name:
Palisades 800901 - 800930
- 2. Reporting Period:
- 3. Licened Thermal Power (NDit):
2530 811.7
- 4. Nameplate Rating (Grow \\1Wel:
805
- 5. Design E'ectrical Rating (Net \\1We):
- 675
- 6. N!. sim"m Dependable Capacity # Gross 51We):
- 635 51asimum Dependable Capacity (Net 31We):
~
- 5. If Changes Occur in Capacity Ratings titems Number 3 Through 7 Since Last Report. Gise Reasons.
55%, S3%
4 Pr wer Lesel To which Restricted. I' Any (Net.1het:
\\
Immediate Action Letters frora NRC.
Basis:
- 10. Renons For Restrictions. If Any:
decay heat removal and water hammer concerns.
This \\1onth Yr. to-Date Cumulatise 720 6575 77,006
- 11. Hours in Reporting Period 11 Number Of Hours Reactor was Critica; 699.4 2761.1
.__42,325.9
- 13. Reactor Resene Shutdown Hours
- 14. Hours Generator On-Line 681.0 2646.8 40,073.I
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (>f wH) 1,328,640 5,608,488 77,119,968 17 Gross Electrical Energy Generated (5thH) 406.420 1,723,410 23,755,640
- 15. Net E'ectrical Energy Generated lN!hH) 378,479 1,616.593 22.287.368 14 Unit Senice Factor 94.6 40.3 52.0
- 20. Unit Asailability Factor 94.6 40.3 52.0
- 21. Unit Capacity Factor (Using \\1DC Net) 82.8 38.7 45.6
- 22. Unit Capacity Factor iUsing DER Net) 65.3 30.5 36.0
- 23. Unit Forced Outage Rate 5.4 12.7 35.I 24 Shutdowns Scheduled Oser Nest 6 \\1onths sT pe. Date.and Duration of Each):
3 Fire Protection Mods, November 1, 2 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITI A L CRITICALITY INITI A L ELECTRICITY CO\\141ERCI AL OPER ATION
- 3ased on Condenser Backpressure (4 /7 7 )
8010150'LT7
AVERAGE DAILY UNIT POWER LEVEL J
DOCKET NO.
50-255 UNIT Palisades 10/1/80 DATE COMPLETED BY PJBodtke j
TELEPHONE 616-764-8913 2
1 1
310 NTH September 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL j
(MWe-Net)
(31We Net)
I 9
17 596 2
174 596 13 l
3 19 588 340 i
.g 493 582 20 5
21 577 588
)
6 588 579 22 593
(
7 23 595 583 l
s 24 599 9
579 25 591 596 605 to 1
i 13 589 27 599
)
590 81 12
,3 13 576 539 29 579 588 y
30 15 591 3,
586 3,
i INSTRL'CTIONS j
On this format. list the average daily unit power !eveiin A1We-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l 7-(9/77) t+.
I e
i j
- -. - ~ ~ - - ~ - ~.
--- - ~----
9
,_7.y___
y,_,
9
...7
.. - _. _... _ _.., _ = - - -.. _. _. _ _ _. _. _ _ _ _
___._.-_......_.m._..
_._._.______.....m.
,)
/
- ()
DOCKET NO.
50-255 UNITSillTIDOWNS AND POWER REDUCTIONS l'a l isades UNIT NAME DATE 10/1/80 COMPLETED fly PIBodtke RI:POR T MONTil Sept 1980 TELEPilONE 616-764-8913 1
=
c
.! ?
}
$ $"d I.icensee c -t g".
Cause & Corrective o
No.
Date g
3g g
jg&
Event
=2 n.g Aciion to H
$E 5gc iteport er 8iG
!O Prevent Recurrence.
U i
O 17 800901 F
22.2 A
1 Condensate pump trip.
(contd) 18 800928 F
16.8 A
1 Short on power supply to turbine circuitry.
I i
i f
i I
2 3
4 F: Forced Reason:
Method:
Exhibit G Instructions S: Schedn'ed A Equipment Failure (Lxplain) 1*-Ma nual for Preparation of Data Entry Sheets for Licen.ee II. Maintenance of Test 2 Manual Scram.
C Refueling 3 Autunntic Scram.
Event Report (LER) File (NUREG.
D Regulatory Restriction 4 Oiher(Explain) 0161)
E. Operator Training & License Examination F. Administrative 5
G-Operational Er ror (Explain)
Exhibit 1. Same Source i
.(9/77)
Il-Other (Fxplain )
i l
'SUSSIARY OF OPERATING EXPERIENCE FOR THE MONTH OF SEPTEMBER 1980 Normal operation majority of month. Reactor manually tripped September 28 when a short occurred on pc,wer supplies to turbine control circuitry.
Reactor critical same day.
.