Ack Receipt of 800814 Interim Deficiency Rept Re Linear Indications in Gib Gusset Welds in Reactor Vessel Structural Support.Outstanding Info Includes Determinations of Extent of Deficiencies in Welds & Determination of Causes
ML19347B500
Person / Time
Site: Beaver Valley
Issue date: 09/18/1980
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML19347B501 List:
References
NUDOCS 8010150182
Download: ML19347B500 (2)


Text

--_

  • e-

.a

~

" "'8 0

  • t UNITED STATES l

y-NUCLEAR REGULATORY COMMisslON g

'j REGION I 8

f 631 8 ARM AVENUE of KING OP PRUSSI A. PENNSYt.V ANI A 19406 2913 W Occket No. 50-412 Duquesne Light Company ATTN: Mr. E. J. Woolever Vice President-435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:

Subject:

Linear Indications in Gib Gusset Welds in Reactor Vessel Structural Support (Neutron Shield Tank)(Your let*ar of August 14,1980)

Thank you for your letter, referenced above, which famarded an interim report pursuant to 10 CFR 50.55(e) regarding the subject matter.

This matter was reviewed by our inspector August 11-15, 1980.

In addition, during inspection 50-412/80-06, our inspector reviewed your inspection and repair activities in connection with the significant deficiency reported December 7,1979 for the skirt to base plate weld of the neutron shield tank.

Our inspection report 50-412/80-06 foentified our concerns regarding that defic-1ency and your corrective actions. These concerns included a question about the effectiveness of the fabricator's quality control program and the S&W procurement surveillance program. Our recent review of this matter and the number and extent of the linear indications identified in conjunction with the deficiency reported earlier increases our previously expressed concern about the OC and procurement surveillance programs.

Additionally, it brings into question the quality of welding performance; including workmanship, welding procedures and possibly joint design.

In view of the above, we request that you inform us of yout actions in regard to the following:

determination of the extent of the deficiencies in all gib gusset welds; examination of all other welds on this structure not previously inspec*ad onsite; determination of the causes of all deficiencies identified; and, corrective actions and preventive actions to prevent recurrence of similar deficiencies.

i 8010150 l,F A

Duquesne Light Company 2

Please submit to this office, within thirty days of your receipt of this letter, a written statement of ycur plan for investigation and resolution of the matter.

Your cooperation with us is appreciated.

Sincerely, Adas.L Robert T. Carlson, Chief Reactor Construction and Engineering Support Branch cc: