Forwards IE Insp Repts 50-454/80-16 & 50-455/80-15 on 800806-08.No Noncompliance Noted
ML19347B135
Person / Time
Site: Byron  Constellation icon.png
Issue date: 08/28/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML19347B137 List:
References
NUDOCS 8010010642
Download: ML19347B135 (2)


See also: IR 05000454/1980016

Text

(.

.,

[

'o

UNITED STATES

l

'

$'

NUCLEAR REGULATORY COMMISSION

'

., #,

o

5,

  • -*

..E

REGION 111

f

6

c,

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINolS 60137

  • ...+

kUG 2 e an

Dart . No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. E. W. K. Lee of this office

on August 6-8, 1980, of activities at Byron Station, Units 1 and 2 authorized

by NRC Construction Permits No. CPPR-130 and No. CPPR-131 and to the dis-

cussion of our findings with Messrs. J. T. McIntire and G. Sorensen at the

conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room, except as follows.

If this report contains information that you

or your contractors believe to be proprietary, you must apply in writing

to this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application must

include a full statement of the reasons for which the information is con-

sidered proprietary, and should be prepared so that proprietary informa-

tion identified in the application is contained in an enclosure to the

application.

,

80% of a

2

,

.

.

__

.

Commonwealth Edison Company

-2-

$US a 8 8801

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

t

, h'ceX SYA

i

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-454/80-16

and No. 50-455/80-15

cc w/ enc 1:

l

Mr. J. S. Abel, Director

i

of Nuclear Licensing

Gunner Sorensen, Site

Project Superintendent

Central Files

Reproduction Unit NRC 20b

,

PDR

Local PDR

NSIC

,

TIC

Hr. Dean Hansell, Office of

Assistant Attorney General

Myron M. Cherry, Chicago

j

1

-

.

-

-

_ _ . _ .

--

.

. - . .

.. ,