Advises That 810319 Exemption Request Re Seismic Requirement for Reactor Coolant Pump Oil Collection Sys Per Ability of Lube Sys to Withstand SSE Warrants Further Review.Schedule Requirements Suspended Pending Final NRC Action
ML19345H510
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 05/12/1981
From: Harold Denton
Office of Nuclear Reactor Regulation
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
References
LSO5-81-05-023, LSO5-81-5-23, NUDOCS 8105210081
Download: ML19345H510 (2)


Text

=

p.

b DISTRIBUTION:

r onMm 7 OELD May 12, 1981

'fiRC POR OI&E (3)

Docket No. 50-213 LPDR ACRS(10)

L505-81-05-023 TERA Gray File NSIC Xtra Cy (6)

ORB #5 RF

.DEisenhut Mr. W. G. Counsil, Senior Vice President HDenton Connecticut Yankee Atomic Power Company ECase Post Office Box 270 DCrutchfield Hartford, Connecticut 06107 HSmith WPaulson

Dear Mr. Counsil:

RCaruso By letter dated Macch 19, 1981, you requested an exemption to 10 CFR 50, Appendix R, Item III.0 for the Haddam Neck Plant. This exemption would remove the seismic requirements for an oil collection system for the Reactor Coolant Pumps (RCP) based on the ability of the installed RCP i

lube oil system to withstand a safe shutdown earthquake. Therefore.

you assert that a seismically qualified oil collection system would not enhance fire protection safety at the Haddam Neck Plant.

We have found that your request provides a sound technical basis warranting further staff review. The schedule requirements for this item are, there-fore, suspended in accordance with 10 CFR 50.48(c)(6) until final Comission action on this request.

l Your request for exemption from the provisions of 10 CFR 50.48(c)(5) regard-1 ing the submittal of your plans and schedules for complying with 10 CFR 50, Appendix R. Items III.G and III.L is under review and will be the subject I

of separate correspondence.

Sincerely, ortehuisigned by H. R. seetse Harold R. Denton, Director c

A ffice of Nuclear Reactor Regulation C

m B

cc: See next page R[Tf)f[y,

d o

3 wwls mew 2

$"we-3

'L d

\\E

,\\}

OELD CMEP.

8105 2100iff #p gy

\\

l a

h 4/ 7 /81

/ /81 1

s s M RCa h,:dn,, l.,0Rf h l,,kam ach,C/g5 lA

DL lD q
NRR c"O.0R,8p:DL 033/

,H,$mi,th,

,,DC M, M ield

, G,,,.,, n a s,

enh.ut,,

M, gn i

4/30/8{

4,dk,81,,,

,,hl,/81

,yk, '

4/),$81 4

/ 81

/81 s c.c.u us... so s cu n.e OFFICIAL RECORD COPY

' e '"- "

~

y.

[

UNITED STATES 8

'y e ( [.

NUCLEAR REGULATORY COMMISSION

~

WASHINGTON, D. C. 20655

$* M' aE N

/

May 12, 1981 Docket No. 50-213 LS05-81-05-023 Mr. W. G. Counsil, Senior Vice President Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06107

Dear Mr. Counsil:

By letter dated March 19, 1981, you requested an exemption to 10 CFR 50, Appendix R, Item III.0 for the Haddam Neck Plant. This exemption would remove the seismic requirements for an oil collection system for the Reactor Coolant Pumps (RCP) based on the ability of the installed RCP lube oil system to withstand a safe shutdown earthquake. Therefore, you assert that a seismically qualified oil collection system would not enhance fire protection safety at the Haddam Neck Plant.

We have found that your request provides a sound technical basis warranting further staff review. The schedule requirements for this item are, there-fore, suspended in accordance with 10 CFR 50.48(c)(6) until final Comission action on this request.

Your request for exemption from the provisions of 10 CFR 50.48(c)(5) regard-ing the submittal of your plans and schedules for complying with 10 CFR 50, Appendix R, Items III.G and III.L is under review and will be the subject of separate correspondence.

Sincerely, kyd/

Harold R. Denton, Director Office of Nuclear Reactor Regulation cc: See next page i

6 4

e

' May 12, 1981 Mr. W. G. Counsil cc Day, Berry & Howard U. S. Environmental Protectium Counselors at Law Agency One Constitution Plaza Region 1 Office Hartford, Connecticut 06103 ATTN: EIS C0ORDINATOR JFK Federal Building Superintendent Boston, Massachusetts 02203 Haddam Heck Plant RFD #1 Resident Inspector Post Office Box 127E Haddam Neck Nuclear Power Statkr East Hampton, Connecticut 06424 c/o V. S. NRC East Haddam Post Office Mr. James R. Himmelwright East Haddam, Connecticut 06425 Northeast Utilities Service Conpany P. O. Box 270 Hartford, Connecticut 06101 Russell Library 119 Broad Street Middletown, Connecticut 06457 Board of Selectmen Town Hall Haddam, Connecticut 06103 Connecticut Energy Agency ATTN: Assistant Director Research and Policy Development Department of Planning and Energy Policy 20 Grand Street Hartford, Connecticut 06106 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)