Text
__
_ __
_
.
_ _
_
,
_ _
.
.
4
UNITED STATES
i
~4
NUCLEAR REGULATORY COMMISSION
REGION I
I
e
g
$31 PARK AVENUE
af
KING OF PRUSSI A. PENNSYLV ANI A 19406
Docket No. 50-29
DEC 3 1 INO
Yankee Atomic Electric Conpany
ATTN: Mr. James A. Xay
Senior Engineer - Licensing
25 Research Drive
Westborough, Massachusetts 01581
Gentlemen:
,
Subject:
Inspection 50-29/80-19
This refers to the routine inspection conducted by Peter S. Koltay of this
l
office on November 18 - 21, 1980 at the Yankee Atomic Power Plant, Rowe,
Massachusetts of activities authorized by NRC License No. DPR-3 and to the
discussions of our findings held by Mr. Koltay with Mr. H. Autio and other
.
j
members of your staff at the conclusion of the inspection.
!
Areas examined during this inspection are described in the.0ffice of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
Within the scope of this inspection, no items of noncompliance were observed.
However, one activity appears to be a deviation from the provisions of an
applicable code. This item of deviation is discussed in the enclosed inspection
l
report. You are requested to reply within 20 days of receipt of this letter.
In your reply, please include your coments concerning this item, a description
of any steps that have been or will be taken to prevent recurrence, and the
date all corrective actions or preventive measures were or will be completed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
l
tion report will be placed in the NRC's Public Document Room.
If this report
'
contains any information that you (or your contractor) believe to be proprietary,
it is necessary that you make a written application within 20 days to this
office to withhold such information from public disclosure.
Any such applica-
tion must be accompanied by an affidavit executed by the owner of the information,
which identifies the document or part sought to be withheld, and which contains
a statement of reasons which addresses with specificity the items which will be
considered by the Comission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
l
Document Room.
810.42M
.
.
t'r-
gyev==
e-
eevs-pw-----www--y-wswrwy,e,ie==w1-w-=='av--evewe== gip-
y-
ee - e - w
-cm=w-e-w--a
==ea-o,-s-+-w=-mw-'ew-
m--w e sure w r- r 9 +em--+=mw
-e-e-w-r*+t e v -*w*seve= ens-w'-a-*-e-mi-ve-ww
m-=-e-w w'
,
-
. _ _
.
.
-
_
.
.
-
.
Yankee Atomic Electric Company
2
Should you have any questions concerning this inspection, we will be. pleased to
discuss them with you.
Sincerely,
hYa
--
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
!
Enclosure:
Office of Inspection and Enforcement Inspection
Report Nunber 50-29/80-19
cc w/ enc 1:
H. Autio, Plant Superintendent
J. E. Tribble, President
,
.