ML19345G979
| ML19345G979 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 03/05/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19345G973 | List: |
| References | |
| NUDOCS 8104220949 | |
| Download: ML19345G979 (2) | |
See also: IR 05000269/1981003
Text
g7yi,7~ - =.". . .i . . n
'
C0 ilia!NS 2.7b3Idi1Ed
..#
-
-
paatog"o
UNITED STATES
!
'
NUCLEAR REGULATORY COMMISSION
, , , ,
g
t
.c
REGION 11
101 MARIETTA ST., N.W.. SUITE 3100
F,,
g
b
ATLANTA, G EoRGIA 30303
%
o
M M 0 51981
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Product on
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos. 50-269/81-3, 50-270/81-3 and 50-287/81-3
This refers to the routine safeguards inspection conducted by D. E. Moore of this
office on February 8-12, 1981, of activities authorized by NRC Operating License
Nos. DPR-38, DPR-47 and DPR-55 at the Oconee facility and to the discussions of
our findings held with J. E. Smith at the conclusion of the inspection.
Areas examined during this inspection included your physical security program as
implemented under the provisions cf Title 10, Code of Federal Regulations, Part
73, " Physical Protection of Plants and Materials", and the specific requirements
of your approved Security Plan. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, performance tests, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as Appen-
dix A.
Elements to be included in your response are delineated in Appendix A.
Details of activities involving safeguards and security measures are exempt from
disclosure in accordance with 10 CFR 2.790(d). Therefore, your response should
be incorporated in a separate paper and referenced in your reply.
In accordance with Scction 2.790(d) of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, activities involving safeguards and
security measures are exempt from public disclosure; therefore, the enclosures
to this letter with the exception of the report cover page, which is an inspec-
tion summary, will not be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
'
.
,.
-
R
ewis, A ting hief
Divili n of Resident and
Reactor Project Inspection
Fnclosures:
g0by
See Page.2
,
,
CCilTA55 2.7m0MTS
MAm:nm!::sim!!: arm
M AR 0 51881
-
-
g.
,
-
CONTAINS 2. ::!!!?CR2AT10.1
Duke Power Company
2
Enclosures:
1.
Appendix A, Notice of Violation
(Exempt from Disclosure)
2.
Inspection Report Nos. 50-269/81-3,
50-270/81-3 and 50-287/81-3
(Exempt from Disclosure)
3.
Inspection Summary
(Not Exempt)
cc w/ encl:
J. E. Smith, Station Manager
.
. , .
. . .
. . _ -.
,
._
.
,_
,
.
..
-
,
.
.
, w u. i
.2:9.
- + .w y . r.x ;.
- .g. ..;L . 7c . .,. . ;
.,,,. ,a.. ,
,,2 .
.
. .... . . , ,;, w. :s.,. .. ,
.x;.
w .:. _
-
.
.
.
.
,.
.
.
i,*.4iU.id. I.'./.
I. .] ii IIM
CS::TAEiS:.73:.J 2."dT::':3
.
m