Text
.
-
0 %q'o
f((
UNITED STATES
'
8"
~ ,'n
NUCLEAR REGULATORY COMMISSION
,
.
3
- ,E
REGION 111
$2
-
p
799 ROOSEVELT ROAD
4
g
[g
GLEN ELLYN. lLLINolS 60137
p
V
MAR 3
?9 81
.S.
__
._
Q.
Docket No. 50-44'O
$'
$
hg1
~
Docket No. 50-441
,y
/
The Cleveland Electric Illuminating
/ g g ..
Company-
ATTN: Dalwyn R. Davidson
Vice President - System
Engineering and Construction
Post Office Lox 5000
Cleveland, OH 44101
Gentlemen:
This refers to the routine inspection conducted by Mr. J. Schapker on
January 21-23, 1981, and the inspection conducted by Messrs. R. B. Landsman
and J. Schapker of this office on January 28-30, 1981, of activities at the
Perry Nuclear Plant Project, Units 1 and 2, authorized by NRC Construction
Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings
with Mr. M. R. Edelman and others.of your staff at the conclusion of the
inspection, and to a subsequent telephone discussion between Mr. Landsman
and Mr. Edelman on February 26, 1981.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a' selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities ~ appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix A,
and a written response is required. The significance of the noncompliance
item is in its repetitiveness rather than in the actual finding.
In
responding to this item, please describe the actions taken or planned to
assure that all inspection personnel (current and future) at the Perry site
are properly certified in accordance with NRC requirements.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part'2,
Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,
and your resp'onse to this letter will be placed in the NRC's Public Document
Room, except as follows.
If the enclosures contain information that you or
.your contractors believe to be proprietary, you must apply in writing to
this office, within twenty-five days of the date of this letter, to withhu d
such information from public disclosure. The application must include a fuil
statement of the reasons for which the.information is considered proprietary,
and should be prepared so that proprietary information identified in the
application is contained in an enclosure to the application.
81.0_4070676:
-
E -
-- -
- - - - - --
-
-
- -
-
.
- -
e
.
The Cleveland Electric
-2-
p;p
- 3
,, ,
Illuminating Company
'30!
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
- '{~Q d w>
-
-
C. E. Norelius, Acting Dirtctor
-
Division of Engineering and
Techaical Inspection
Enclosures:
1.
Appendix A, Notice
of Violation
2.
IE Inspection Reports
No. 50-440/81-03 and
No. 50-441/81-03
cc w/encls:
Central Files
Reproduction Unit NRC 20b
FDR
Local PDR
Harold W. Kohn, Power
Siting Commission
Daniel D. Wilt, Attorney
Helen V. Evans, State of Ohio
_