Forwards IE Insp Repts 50-440/81-03 & 50-441/81-03 on 810121-23 & Notice of Violation
ML19345G636
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/03/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19345G637 List:
References
NUDOCS 8104070676
Download: ML19345G636 (2)


See also: IR 05000440/1981003

Text

.

-

0 %q'o

f((

UNITED STATES

'

8"

~ ,'n

NUCLEAR REGULATORY COMMISSION

,

.

3

- ,E

REGION 111

$2

-

p

799 ROOSEVELT ROAD

4

g

[g

GLEN ELLYN. lLLINolS 60137

p

V

MAR 3

?9 81

.S.

__

._

Q.

Docket No. 50-44'O

$'

$

hg1

~

Docket No. 50-441

,y

/

The Cleveland Electric Illuminating

/ g g ..

Company-

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Lox 5000

Cleveland, OH 44101

Gentlemen:

This refers to the routine inspection conducted by Mr. J. Schapker on

January 21-23, 1981, and the inspection conducted by Messrs. R. B. Landsman

and J. Schapker of this office on January 28-30, 1981, of activities at the

Perry Nuclear Plant Project, Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-148 and No. CPPR-149 and to the discussion of our findings

with Mr. M. R. Edelman and others.of your staff at the conclusion of the

inspection, and to a subsequent telephone discussion between Mr. Landsman

and Mr. Edelman on February 26, 1981.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a' selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities ~ appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A,

and a written response is required. The significance of the noncompliance

item is in its repetitiveness rather than in the actual finding.

In

responding to this item, please describe the actions taken or planned to

assure that all inspection personnel (current and future) at the Perry site

are properly certified in accordance with NRC requirements.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part'2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

and your resp'onse to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

.your contractors believe to be proprietary, you must apply in writing to

this office, within twenty-five days of the date of this letter, to withhu d

such information from public disclosure. The application must include a fuil

statement of the reasons for which the.information is considered proprietary,

and should be prepared so that proprietary information identified in the

application is contained in an enclosure to the application.

81.0_4070676:

-

E -

-- -

- - - - - --

-

-

- -

-

.

- -

e

.

The Cleveland Electric

-2-

p;p

  • 3

,, ,

Illuminating Company

'30!

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

  • '{~Q d w>

-

-

C. E. Norelius, Acting Dirtctor

-

Division of Engineering and

Techaical Inspection

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Reports

No. 50-440/81-03 and

No. 50-441/81-03

cc w/encls:

Central Files

Reproduction Unit NRC 20b

FDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Daniel D. Wilt, Attorney

Helen V. Evans, State of Ohio

_