ML19345G638

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 810121-23
ML19345G638
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 03/03/1981
From: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML19345G637 List:
References
50-440-81-03, 50-440-81-3, 50-441-81-03, 50-441-81-3, NUDOCS 8104070678
Download: ML19345G638 (1)


Text

O 1

Appendix A NOTICE OF VIOL \\ TION

. Cleveland Electric Illuminating Company Docket No. 50-440 Docket No. 50-441 As a result of the inspection conducted on January 21-23 and 28-30, 1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980), the following violation was identified:

10 CFR 50, Appendix B, Criterion V (Procedures), states in part that,

" Activities affecting quality-shall be prescribed by documented instructions

. and shall be accomplished in accordance with these procedures CEI Corporate-QA program, Section 0200 requires that examination and test perconnel... shall qualify to and be certified to the. requirements of Regulatory Guide 1.58 and ANSI N45.2.6.

Contrary to the above, National Mobile, Great Lakes and Dick Corporation failed to_ follow the above procedure by certifying seven inspection person-nel-who lacked the required prior experierce at the time of certification.

Proficiency testing appeared to be the main. basis for certifying the seven

. individuals. Furthermore, one inspection individual still does not meet tLe experience requirements of ANSI'N45.2.6.

~

This is a Severity Level V. violation (Supplement II.E).

Pursuant to the provisions of-10 'CFR ~ 2.201, you are required to submit to this office'within twenty-five_ days of the date of this Notice a written statement or explanation in reply, including for each item of noncompliance:

.(1) corrective action taken and the results. achieved; (2) corrective action-

-to be taken to avoid further noncompliance; and (3) the date when full com-pliance will be achieved..Under the authority of Section'182 of the Atomic Energy Act of-1954, as' amended, this response shall be submitted under oath or affirmation.

glsjgr

&S % %.

-Dated C. E. Norelius, Acting Director Division of Engineering and

-Technical Inspection 810.407067s