l GUIDELINES 1
4 FOR 4
UTILITY MANAGEMENT STRUCTURE i
i' i
AND TECHNICAL RESOURCES i.
(
G i
f
'k
+
7 l
I c1 i
l t
E
PURPOSE THE PURPOSE OF THE STAFF EFFORT IS TO PROMULGATE GUIDELINES FOR THE STRUCTURE OF UTILITY ORGANIZATIONS AND FOR TECHNICAL SUPPORT RESO WHICH SHOULD ASSUP.E THAT PLANTS CAN BE OPERATED SAFELY WITH PROPER THE GUIDELINES CONSIDER RECOMMENDATIONS FROM:
MANAGEMENT ATTENTION.
1.
PRESIDENT'S COMMISSION ON TMI 2.
e:RC COMMISSIONERS
- 3. ~ LESSONS LEARNED TASK FORCE 4.
NRC SPECIAL INQUIRY GROUP 5.
ACRS 6.
AIF i
76 ANS STANDARDS COMMITTEE 8.
TMI ACTION PLAN (NUREG-0660) 5)
i f
i
~
STUDIES IN ADD 1110N TO THE STAFF EFFORT, S5VERAL CONTRACTOR STUDIES HAVE BEEN CONDUCTED.
ONE CONTRACTOR EFFORT IS NOW UNDERWAY.
COMPLE7ED:
I BASIC ENERGY TECHNOLOGY ASSOCIATES, " POWER PLANT STAFFING,"
TEKNEKRON RESEARCH, INC., " UTILITY MANAGEMENT AND TECHNICAL RESOURCES," NUREG/CR-1656.
BIO TECHNOLOGY, INC., # REVIEW OF STAFFING REQUIREMENTS FOR NEAR-TERM OPERATING LICENSE FACILITIES," NUREG/CR-1764.
UNDERWAY:
BATTELLE (PACIFIC NORTHWEST LABORATORIER), IDENTIFICATION OF ELEMENTS OF MANAGEMENT WHICH SHOULD BE CONSIDERED IN MAKING AN OVERALL DETERMINATION OF MANAGEMENT ADEQUACY.
C,I b
4 NRR STAFF EFFORT DEVELOP GUIDELINES FOR AN ACCEPTABLE STRUCTURE OF THE UTIL AND PLANT ORGANIZATIONS AND FOR THE TECHNICAL RESOURCES NE THE PLANT AND CORPORATE LEVELS TO ASSURE ADE00 ATE SUPPORT OF OPERATION.
DRAFT GUIDELINES 'HAVE BEEF: USED BY JOINT IE-NRR TEAMS TO EVALUA SEQUOYAH, NORTH ANNA, SALEM, MCGUIRE, FARLEY, DIABLO CANYON, ZION, INDIAN POINT 2 AND 3, AND TMI-1.
THE GUIDELINES HAVE NOW BEEN ISSUED IN DRAFT FORM AS NU euaLIC COMMENTS HAVE BEEN REQUESTED.
SCHEDULE COMMENTS NOW NOT DUE UNTIL DECEMBER 19, 1980 INTEND TO REVISE NUREG-0731 AS NECESSARY TO INCORPORATE APPLICABLE T OF AND COMMENTS ON NUREG/CR-1280 AND NUREG-0731.
IF CHANGES ARE MAJOR, WE OTHERWISE, WE ARE TO PREPARE MAY OPT FOR AN ADDITIONAL ROUND OF COMMENTS.
A PAPER FOR THE COMMISSIONERS TO OBTAIN THEIR APPROVAL ON THE DOCUME IS TO BE FINALLY ISSUED FOR APPLICATION TO OPERATING PLANTS.
THE SCHEDULE AS ESTABLISHED IN NUREG-0660 WAS TO HAVE THE COMMISSION PA READY BY THE END OF 1980, ISSUE THE FINAL DOCUMENT IN MARCH OF 1981, AND HAVE IE BEGIN INSPECTING FOR IMPLEMENTATION IN SEPTEMBER 1981.
IT NOW APPEARS THAT THIS SCHEDULE WILL SLIP - PROBABLY TO AT LEAST TH OF JANUARY FOR COMMISSION PAPER.
IMPLEMENTATION BY SEPTEMBER IS DOUBTFUL.
O I
Un
-