Forwards IE Insp Repts 50-327/81-01 & 50-328/81-01 on 810106-09.No Noncompliance Noted
ML19345G342
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 02/10/1981
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19345G343 List:
References
NUDOCS 8103180449
Download: ML19345G342 (2)


See also: IR 05000327/1981001

Text

<

,

y

-

4

,p* a ra:<,,%

UNITED STATES

-

P'

3,

NUCLEAR REGULATORY COMMISSION

l!

E

REGION ll

$'

[

101 MARIETTA sT., N.W., sulTE 3100

Y,

e

ATLANTA, GEORGIA 3o3o3

(D

g

FEB 1 o 19 81

%

~

Tennessee Valley Authority

9

/

b

,

'

<</glp

j

ATTN: !!. G. Parris

-

Manager of Power

{44

-

N ,@,g'8

eg*s

/g

500A Chestnut Street Tower II

r ,,

y

Chattanooga, TN 37401

e

Gentlemen:

h

f

Subject: Report NosM7/81-31 and@328/81-[0D

This refers to the routine safety inspection conducted by T. D. Gibbons of this

office on January 6-9,

1981, of activities authorized by NRC Operating License

No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility, and to

the discussion of our findings held with Mr. McGriff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspeccion consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

t

!

C. E. Murphy, Chie

Reactor Construction and Engineering

Support Branch

Enclosure:

(See Page 2)

810818 0%

Q

r

.

%

s

FEB 101981

Tennessee Valley Authority

-2-

Enclosure:

Inspection Report Nos. 50-327/81-01

and 50-328/81-01

cc w/ encl:

G. G. Stack, Project Manager

J. M. Ballentine, Plant

Superintendent

J. F. Cox, Supervisor, Nuclear

Licensing Section

M. J. Burzynski, Project Engineer

H. N. Culver, Chief, Nuclear Safety

Review Staff

II. J. Green, Division Director