ML19345G342
| ML19345G342 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/10/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19345G343 | List: |
| References | |
| NUDOCS 8103180449 | |
| Download: ML19345G342 (2) | |
See also: IR 05000327/1981001
Text
<
,
y
-
4
,p* a ra:<,,%
UNITED STATES
-
P'
3,
NUCLEAR REGULATORY COMMISSION
l!
E
REGION ll
$'
[
101 MARIETTA sT., N.W., sulTE 3100
Y,
e
ATLANTA, GEORGIA 3o3o3
(D
g
FEB 1 o 19 81
%
~
Tennessee Valley Authority
9
/
b
,
'
<</glp
j
ATTN: !!. G. Parris
-
Manager of Power
{44
-
N ,@,g'8
eg*s
/g
500A Chestnut Street Tower II
r ,,
y
Chattanooga, TN 37401
e
Gentlemen:
h
f
Subject: Report NosM7/81-31 and@328/81-[0D
This refers to the routine safety inspection conducted by T. D. Gibbons of this
office on January 6-9,
1981, of activities authorized by NRC Operating License
No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility, and to
the discussion of our findings held with Mr. McGriff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspeccion consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
t
!
C. E. Murphy, Chie
Reactor Construction and Engineering
Support Branch
Enclosure:
(See Page 2)
810818 0%
Q
r
.
%
s
FEB 101981
Tennessee Valley Authority
-2-
Enclosure:
Inspection Report Nos. 50-327/81-01
and 50-328/81-01
cc w/ encl:
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
Review Staff
II. J. Green, Division Director