ML19345G337

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-267/80-25 on 801201-31 & Notice of Violation
ML19345G337
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 01/29/1981
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Millen C
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML19345G338 List:
References
NUDOCS 8103180433
Download: ML19345G337 (2)


See also: IR 05000267/1980025

Text

r

l0

,p*

%,

UNITED STATES

f})

J'

NUCLEAR REGULATORY COMMISSION

3 j .y

l

REGloN IV

$,

94

611 RYAN PLAZA DRIVE. SulTE 1000

ARLINGTON, TEXAS 76011

,,,,,

January 29, 1981

co

o>

In Reply Refer To:

I

[M

Docket No. 50-267/80-25

2 2 1991 % ;-

4 ;' u.t

Public Service Company of Colorado

-

DId7Pon

3

,

'*tn:

Mr. C. K. Mi11en

,3

.

-

Senior Vice President

4 h<g7gQ

P. O. Box 840

Denver, Colorado 80201

Gentlemen:

This refers to the inspection conducted under the Resident Inspection Program

by Messrs. M. W. Dickerson, T. F. Westerman, and G. L. Plumlee III of this

office during the period December 1-31, 1980, of activities authorized by NRC

Operation License No. DPR-34 and to discussions of the findings with members of

your staff at the conclusion of the inspection.

Areas examined during the inspection and the findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During this inspection it

was found that ce"ain of your activities were not conducted in full compliance

with NRC requirements.

No response is necessary for the violation contained in the enclosed Notice of

Violation since corrective action was completed during the inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

i

~

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office within 20 days

!

of tha date of this letter, requesting that such information be withheld from

public disclosure.

This application must include a full statement of the

r'easons on the basis of which it is claimed that the information should be

withheld from public disclosure.

The application should be prepared so that

any proprietary information identified is contained in an enclosure to the

.

application, since the application without the enclosure will also be placed

f

in the Public Document R0cm.

If we do not hear from you in this regard within

!

the specified ' period, the report will be placed in the Public Document Room.

l

L

i

810818 DQ

Q

._

_

_ -_.

.-

_

_.

.

.

.

Public Service Company rf Colorado

2

January 29, 1981

Should you .;cve any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

~~

kb WnW

i

G. L. Madsen, Chief

Reactor Operations and

Nuclear Support Branch

- Enclosures:

1.

' Notice of Violation

2.

IE Inspection Report No. 50-267/80-25

cc w/ enclosures:

D. W. Warembourg, Nuclear Production Manager

Fort St. Vrain Nuclear Station

P. O. Box 368

Platteville, Colorado 80601

L. Brey, Quality Assurance

,

e

d

/

7'

4

,,

--ve