ML19345G333
| ML19345G333 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 02/09/1981 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML19345G334 | List: |
| References | |
| NUDOCS 8103180417 | |
| Download: ML19345G333 (2) | |
See also: IR 05000327/1980048
Text
/ l0
i ,. am'o
,
UNITED STATES
l
,
['
,
'g
NUCLEAR REGULATORY COMMISSION
- e
REGION ll
g
g[
101 MARIETTA sT., N.W sulTE 3100
e,
,
ATLANTA, GEORGIA 303o3
'"e
FEB - 91981
,4
,
Tennessee Valley Authority
.
[/
I f
.,
ATTN:
H. G. Parris
g
U
-
Manager of Power
O,
-
sens
l
-
Y * g .1!$g7;!
500A Chestnut Street Tower II
C;
{
'
Chattanooga, TN 37401
Gentlemen:
[
A'
Subject: Report NosdN/80-4SandMD
This refers to the special safety inspecti n conducted by T. D. Gibbons of this
office on December 16-19, 1980, of activities authorized by NRC Operating License
No. DPR-77 and Construction Permit No. CPPR-73 for the Sequoyah facility, and to
the discussion of our findings held with W. D. Cottle at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
In accordance with Section 2.790 of tbe NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Docu:aent Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that pu make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you n this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
_ .
C.' E. Murp
ie
,
Reactor Construc ton and Engineering
Support Branch-
Enclosure:
(See Page 2)
u 0s18 09G
@
. _ - . .
. - .
. _ - _ __. - .
_ - - . _- . -_. . - _ _ _ . . . _ _ . . _
_ _ _ . _ . - _ .
. -.
. .-_ -
r
i
.
ph?
~
1
(
l
Tennessee Valley Authority
-2-
FEB - 91981
Enclosure:
l
Inspection Report Nos. 50-327/80-48
and 50-328/80-26
i
!
cc w/ encl:
~
'
G. G. Stack, Project Manager
J. M. Ballentine, Plant
Superintendent
J. F. Cox, Supervisor, Nuclear
-Licensing Section
M. J. Burzynski, Project Engineer
H. N. Culver, Chief, Nuclear Safety
,
l
Review: Staff
l
H. J.-Green, Division Director
-
,
,
6
-.
&
k
L
e
9
-'
6
6
-w
c
,t
--
e.-r--
=e--
.
-,,p.
e
=
,
e-
4
--,r-