Forwards IE Insp Repts 50-277/80-32 & 50-278/80-24 on 801001-1107 & Notice of Violation
ML19345G322
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/07/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19345G317 List:
References
NUDOCS 8103180172
Download: ML19345G322 (2)


See also: IR 05000277/1980032

Text

.

_

_

t

.

,[

UNITED STATES

f[

(4,k

NUCLEAR REGULATORY COMM!sslON

  • I

\\

j

REGION 4

W

g

631 PARK AVENUE

KING OF PRUSSI A, PENNSYt.V ANI A 19406

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTN: Mr. S. :.. Daltroff

Vice President

Electric Production

'

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject: Combined Inspection 50-277/80-32 and 50-278/80-24

This refers to the routine inspection conducted by Mr. C. J. Cowgill of this

office on October 1 - November 7,1980 at Peach Bottom Atcaic Power Station

Units 2 and 3, Delta, Pennsylvania and at your corporate offices in Philadel-

phia, Pennsylvania of activities authorized by NRC License Nos. DPR-44 and DPR-

56 and to the discussions of our findings held by Mr. Cowgill with Mr. W. T.

Ullrich of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and represen,tative records, interviews with personnel, and observations by the

inspector.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncom-

pliance has been categorized into the levels as described in our correspondence

to you dated Decenter 31, 1974.

This notice is sent to you pursuant to the

,

l

provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,

Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written

statement or explanation in reply including:

(1) corrective steps which have

been taken by you and the results achieved; (2) corrective steps which will be

!

I

taken to avoid further items of noncompliance; and (3) the date when full

compliance will be achieved.

Our inspector verified the steps you had taken to correct the item of noncom-

pliance regarding control of procedures brought to your attenticn as Item A of

Appendix A in our letter dated December 31,1979. Your corrective actions, as

stated in your letter dated January 9,1980, included placing the radwaste

control room on the controlled distribution list for appropriate procedures.

From our October 21, 1980 inspection it appears that the corrective actions were

not fully effective, since our inspector identified out-of-date procedures in

use at another location.

go31so GL

.

_

--

___

,

.

-

.

Philadelphia Electric Company

2

Recurrent items of noncompliance are given additional weight in the consider-

ation and selection of appropriate enforcement action.

Therefore, in your

'

response to this letter, you should give particular attention to those actions

taken or planned to ensure that identified items of noncompliance will be

completely corrected and will not recur.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2. Title

>

10, Code of Federal Regulations, a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary

that you make a written application within 20 days to this office to withhold

.

such information from public disclosure. Any such application must be accompanied

by an affidavit executed by the owner of the information, which identifies the

document or part sought to be withheld, and which contains a statement of

reasons which addresses with specificity the items which will be considered by

the Commission as listed in subparagraph (b) (4) of Section 2.790. The infor-

mation sought to be withheld shall be incorporated as far as possible into a

separate part of the affidavit.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be pleased to

,

discuss them with you.

Sincerely,

lBrunner, Chief

-_r

1

.

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

'

2.

Combined Office of Inspection and Enforcement Inspection

Report Nunber 50-277/80-32 and 50-278/80-24

cc w/ enc 1:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr., Esquire (Without Report)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Without Report)

i

Michael J. Scibinico, II, Assistant Attorney General (Without Report)

.

-

_-

..

.

-_-

. . . .

--

.