Summary of 810210 Meeting W/Util Re Impact of Mark I Containment Orders on long-term Program for Facilities. Attendance List Encl
ML19345F744
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 02/13/1981
From: Verrelli D
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
TAC-07939, TAC-07940 NUDOCS 8102190191
Download: ML19345F744 (4)


Text

\\

[pMic

,S UNITED STATES

~,

y

)

g NUCLEAR REGULATORY COMMISSION

  • A

':E WASHINGTON, D. C. 20555

  • 94 1!!!

E o,g %,f February 13, 1981 Dockets Nos. 50-321 & 366 e

to d

w f,pe80Aph{].

LICENSEE: GEORGIA POWER COMPANY (GPC) 8/h. $

FACILITY: HATCH NUCLEAR PLANT, UNITS N05.1 AND 2 Nh 0&ron

SUBJECT:

MEETING SUMftARY - MARK I CONTAINMEt:T ORDERh ^,,

  1. '/

On February 10, 1981 members of the staff met with representatives of GPC to discuss the impact " our recent ORDERS on the licensee's pro-gram to resolve the MK I Containment Long Term Program for Hatch Nuclear Plant Units Nos. 1 and 2.

Following is a summary of the meeti ng.

The licensee stated that the ORDER'S for completion of the MK I modi-fication mandated completion dates consistent with his pro-posed schedule as submitted by letter dated August 7,1980. However, the fomalization of the licensee's proposed schedule by ORDER could result in unnecessary shutdowns of the Hatch 1/2 Units. The licensee's proposed schedule was based on an assumed capacity factor of 80% for each unit; i.e., each unit would operate until 1982 at 100% Tower for 80% of the scheduled operating time (considering planned refueling /

maintenance outages).

Using this assumption the Hatch Units could meet the Order's deadline with the following grace periods:

Hatch 1 9 days Hatch 2 -13 days The licensee stated that experience would indicate that that 2 Units would average such a capacity factor (provided there are no extended forced shutdowns); further, experience would also indicate that the planned capacity factor is not identical for each Unit.

For example, one unit may achieve 86% capacity while the other might achieve 74%.

In this situation one of the Units might be required to shutdown for 2 extended outages (within a short period of time) unnecessarily; i.e., a Unit may be required to shutdown for 3 months to affect MK I modifications, resume operation for a relatively short period of time to attain appropriate fuel burnup for the next cycle, and then shutdown again for approximately 2-3 months for refueling operations. The licensee requested the staff's opinion as to whether a 60 day extension to the Orders completion dates would be favorably considered if he were to submit such a request.

The licensee also expressed concern over the text of the Orders that referred to the requirement to assess the suppression pool hydrodynamic loads in accordance w th NEDC-21888 and NED0-24583-1 and the acceptance i

criteria contained in Appendix A to NUREG-0661. This mandated position which includes references to specific versions of the ASME Codes might be in conflict with 50 CFR 50.55 for the purchase of equipment.

The Director, DL advised the licensee as follows:

k

(

~

t !

a) the staff would consider the licensee's concerns on the mandated dates for MK I modifications and advise the licensee within a couple days [0n February-12, 1981 by tolephone, the Project Ibnager advised the V. P.

Georgia Power.that the staff would review and consider any submitted request for modification to the Order. An extension of 30 days to the Order would appear reasonable if sufficient justification were provided.], b) the text of the Order is not inconsistent with the NRC's regulations for purchase i

of equipment in accordance with Code requirements.

A list of meeting attendees is enclosed.

e

's j$)q/

~

P^

s.

Dav d M. Ver elli, Project Manager Operating actors Branch #4 I

Division Licensing

Enclosure:

List of Attendees cc w/ enclosure:

See last page E

r l

l

{

l i

l

)

e e

Enclos ure Meeting Attendees - February 10, 1981 NRC GPC DEisenhut WWidner TNovak RBaker RReid 0Batum (S.Co. Sus)

CGrimes SWhite (S.Co. Sus)

BSiegel DVerrelli l

l l

l l

~. _ -. -.

l i

i MEETING

SUMMARY

DISTRIBUTION Licensee:

Mr. William Widner, Vice President - Engineering j

Georgia Power Company i

  • Copies also sent to those people on service (cc) list for subject plant (s).

i Docket File BGrimes, DEP NRC PDR SSchwartz, DEP i

L PDR SRamos, EPDB FPagano, EPLB ORB _Rdc HDenton i

ECase DEisenhut i

RPurple RTedesco TNovak Glainas RReid i

TIppolito j

SVarga DCrutchfield l

RAClark l

ORB Project Manager Licensing Assistant l

OELD AE0D - JHeltemes I

IE-3 SShowe (PWR) or CThayer (BWR), IE Meeting Surmiary File-0RB RFraley, ACRS (16) l Program Support Branch GZech JRoe NRC Participants l

CGrimes BSiegel l

i i

i

. ~. - _.. _, -. -.. _,. _....,,... _..... -.

_ -, _.. - -..,.. _ - - - -.... - -