ML19345F726

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/80-47 & 50-366/80-47 on 801115-25.No Noncompliance Noted
ML19345F726
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 12/24/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19345F727 List:
References
NUDOCS 8102190126
Download: ML19345F726 (2)


See also: IR 05000321/1980047

Text

_ , --.

p eac ,

/

/L

^

o

.O [

g

o

UNITED STATES

NUCLEAR REGULATORY COMMISSION

g

,y

g

c' '

.c

REGION li

o, ' .

/ ,[

101 MARIETTA ST.. N.W., SUITE 3100

'%# 4 p

ATLANTA, GEORGI A 30303

  • ....

'l

DEC 2

1980

In Reply Refer To:

RII:RFR

s

6321/80-47

SQ-366/80-4

o

CD

p

%

Georgia Power Company

[f[

s

ATTN:

J. H. Miller, Jr.

/

g

9-

f(

Executive Vice President

2 "pU

f

O

-

-

270 Peachtree Street

7 A die

'%i,$s$Q%ouy

Atlanta, GA 30303

Sq

'***

A

Gentlemen:

4

6,

This refers to the inspection conducted by R. F. Roge

h

t

office on

November 15-25, 1980, of activities authorized by NRC Operating License No.

DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion of

our findings held with Mr. Manry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted,of

selective examinations of procedures and representative records, interviews with-

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of' Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

,

it is claimed that the information is proprietary, and should be prepared so

,

i

that proprietary information identified'in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

'

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

I

fbe

i

R. C.

wis, Acting Chief

Reactor Operations and Nuclear

Support Branch

~

Enclosure:

(See Page 2)

sion 9o lh

Q

,

'

DEC 211980

'

Georgia Power Company

-2-

Enclosure:

Inspection Report Nos. 50-321/80-47

and 50-366/80-47

cc w/ encl:

M. Manry, Plant Manager

C. E. Belflcwer, Site QA Supervisor

W. A. Widner, Vice President and

General Manager-Nuclear Generation