Text
AJ9tb
manou
' .
'o,
UNITED STATES
E
NUCLEAR REGULATORY COMMISSION
,
o
{
E
REGION V
o,
[
1990 N. CALIFonNIA BOULEVARD
e
SUITE 202, WALNUT CREEK PLAZA
%*,,,e
WALNUT CREEK, CALIFORNIA 94698
December 19, 1980
6
fIf
'.y _
0(.%{jby
<
g
F G 0 2 D g f . ;}-
- .
Docket flos. 50-460 and 50-513
7
E
/~
4=egggr ,h'j
%
&
Washington Public Power Supply System
4/
50
"
P. O. Box 968
Richland, Washington 99352
Attention:
D. W. Mazur
WNP 1/4 Program Director
Gentlemen:
Subject: fiRC Inspection of Washington fiuclear Projects 1 and 4
This refers to the inspections conducted by Messrs. R. C. Haynes,.
D. F. Kirscn and P. P. ilarbut of this office during the period between
Noveinber 17 to December 5,1980 of activities authorized by.i4RC
Construction Permit Nos. CPPR-134 and CPPR-174, and to the discussion
of our findings held with you and other members of your staff on
November 20 and December 5, 1980.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, in-
terviews with personnel, and cbservations by the inspector.
Based on the results of this inspection, it appears that ceitain of
your activities were not conducted in full compliance with NRC
requirements, as set forth in the Notice of Violation, enclosed herewith
as Appendix A.
These items of noncompliance have beer .ategorized into
a level as described in the Federal Register on October 7,1980
(45 RF 66754) as the Interim Enforcement Policy.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection repcrt will be placed in the NRC's Public-
Document Room.
If this report contains any information that you believe
to Se proprietary, it is necessary that you submit a written application
to (.his office, within 20_ days'of the dat? of this letter, requesting
that such information be withheld from public disclosure. The application
81021900 5 4-
,
.. :
. .
. . . . - . .
. - . . . - , -
y
Was-hington Public Pnwer Supply System
-2-
DEC 19 $50
must ir lude a full statement of the reasons why it is claimed that the
information is proprietary. The application should be prepared so that
any proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will also
be placed in the Public Docunent Room.
If we do not hear from you in
this regard within the specified period, the report will be placed in
the Public Document Poom.
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely,
4
,p.*'
,.
G. S. Spencer, Chief
Reactor Construction and
Engineering Support Branen
Enclosures:
A.
Appencix A - Notice of Violation
B.
IE Inspection Report
i:os. 50-060/30-15
53-513/80-15
cc w/ enclosures:
M. E. Witherspoon, Division Manager'
Quali ty Assurance, '..'PPSS
.