ML19345F674
| ML19345F674 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/12/1980 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Counsil W NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML19345F672 | List: |
| References | |
| NUDOCS 8102190018 | |
| Download: ML19345F674 (2) | |
See also: IR 05000245/1980020
Text
.
.
o
%
UNITED STATES
j
NUCLEAR REGULATORY COMMISSION
e
-.
f
&
REGION I
e -$
"%
g
631 PARK AVENUE
S
g% . , py j
. .
xiNo oP Paussi A. PENNSYLV ANI A 19406
,..
Docket Nos. 50-245
DEC 10 8
50-336
-
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations
P. O. Box 270
Hartford, Connecticut 06101
-
Gentlemen:
Sub,iect: Combined Inspection 50-245/80-20; 50-336/80-22
This refers to the routine inspection conducted by Mr. J. J. Kottan of this
office on November 5-7. 1980 at Millstone Nucle..r Power Station, Units 1 and 2,
Waterford, Connecticut of activities authorized by NRC License Nos. DPR-21 and
DPR-65 and to the discussions of our findings held by Mr. Kottan with Mr. -E.
Farrell and others of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations by the
inspector.
In addition, our Mobile Laboratory was also brought to your site and used by the
inspector to make certain independent measurements.
The basic purpose of these
independent measurements is to verify your capability for analyzing radioactive
effluents, and to achieve and maintain comparable methods of analyses between
your facility and the NRC. The complete data from these measurements will be
reported in a subsequent Inspection Report.
Based on the results of this inspection, it appe:es that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncompliance
has been categorized into the levels as described in our correspondence to you
dated December 31, 1974.
This notice is sent to you pursuant to the provisions
of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of
Federal Regulations.
Section 2.201 requires you to submit to this office,
within twenty (20) days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been taken by
you and the results achieved; (2) corrective steps which will be taken to avoid
further items of noncompliance; and (3) the date when full compliance will be
achieved.
B1021300tT
.
.
-
--.
. - _ .
-
.
.
'
.
.
!
I
Northeast Nuclear Energy Company
2
DEC 10 D
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any infor-
mation that you (or your contractor) believe to be proprietary, it is necessary
that you make a written application within 20 days to this office to withhold
i
such information from public disclosure. Any such application must be accon:panied
by an affidavit executed by the owner of the information, which identifies the
document or part sought to be withheld, and which contains a statement of reasons
which addresses with specificity the items which will be considered by the
!
Commission as listed in subparagraph (b) (4) of Section 2.790. The information
l
sought to be withheld shall be incorporated as far as possible into a separate
i
part of the affidavit.
If we do not hear from you in this regard within the
j
specified period, the report will be placed in the Public Document Room.
!
Should you have any questions concerning this inspection, we will be pleased to
'
discuss them with you.
,
Sincerely,
A
_
V'
d
<
G
ge H. Smith, Chief
Fu 1 Facility and Materials Safety
ranch
l
Enclosures:
l
1.
Appendix A, Notice of Violation
l
2.
Combined Office of Inspection and Enforcement Inspection
l
Report Number 50-245/80-20 and 50-336/80-22
cc w/ encl:
E. J. Mroczka, Station Superintendent
J. F. Opeka, System Superintendent, Nuclear Operations
D. G. Diedrick, Manager of Quality Assurance
J. R. Himmelwright, Licensing Safeguards Engineer
l
!
-
\\
_ , ._.
. - -
. .