ML19345F263

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1981
ML19345F263
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 02/03/1981
From: Watford M
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML14188A416 List:
References
NUDOCS 8102170071
Download: ML19345F263 (3)


Text

Enclosure to Serial: RSEP/81-225 OPERATING DATA REPORT DOCKET NO: DPR-23 DATE: 610203 N" "" ; tsY: M. L. Watford TELEP110NE: (803) 383-452; OPERATING STATUS Notes: There are presently 113 Spent fuel assemblies

1. Unit Name: H. B. Robinson Two * '* " " "E*" *
2. Reporting Period: 810101,0000/810131,2400 2 *
3. Licensed Thermal Power (MWt): 2300
4. Nameplate Racing (Gross MUe): 739
5. Design Electrical Rating (Net MWe): 700
6. Maximum Dependable Capacity (Gross MWe): 700
7. Maximum Dependable Capacity (Net MWe): 665
8. If Changes Occur in Capacity Ratings (Item Number 3 through 7) Since Last Report, Give Reasons: No change
9. Pouer Lcral to Which Restricted, If Any (Net P..'c); None __
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative 744 744 86,910
11. Hours in Reporting Period 669.07 66,434.35 669.07
12. Number of Hours Reactor Was Critical 74.93 74.93 1,052.81
13. Reactor Reserve Shutdown Hours 661.40 661.40 6u,820.22
14. Hours Generator On-Line 0.00 0.00 23.20
15. Unit Reserve Shutdown Hours 1,458,329 1,458 329 132,670,703 _
16. Gross Thermal Energy Generated (MWH) 479,925 42,818,692 479,925
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (M6*H) 456.022 456.022 40.572.474 88.90 88.90 74.58
19. Unit Service Factor 88.90 88.90 74.61
20. Unit Availability Face.or . 70.20 92.17 92.17
21. Unit Capacity Factor (Using MDC Net) 87.56 66.69
22. Unit Capacity Factor 'Using DER Net) 87.56 11.10 11.10 13.84
23. Unit Forced Dutage Rate
24. Shutdowns Scheduled Over Next 6 } baths (Type, Date, and Duration of Each):

Steam Generator Inspection April - May,1981, 3 weeks Februarv 4, 1981

25. If Shut Down At End of Report Period, Estimated Date of Startup:

Forecast Achieved

26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICAL *TY ---

INITIAL ELECTI:1 CITY ---

CO}DIERCIAL OPERATION (9/77) sg .

( ._ ., ._. =-

Enclorure to Serial: RSEP/81-225 .

Page 2 of 3 ,

DOCKET NO. DPR-23 ,

UNITS!!UTDOWNS AND POWEtt :lEDUCTIONS l>N:T N A*.* E 11 . B. Robinson Two D,\TE 810203 COM."LETEI) l Y M. L Watford

!!EPOICT MONTil January TEl.LPilONE (8011 1Rhos?4 Hw, L Cause & Correceive EE  ;; ) .E Licensee N.t. Date g 5? 4 isU livent u '! h'3 E Action su e fE e 3gg e gr itepius a WO -

E

o Prevent llecurrence

' 5 f

01-01 810110 F ----

A 4 1111 VALVEX "A" Feedwater Reg. Valve (FWRV) oscillating, replaced faulty capacitors in summator (Load Reduction) 01-02 810123 S ----

B 4 -

lill PIPEXX "A" Main Feedwater Pp recirc.

- line elbow leaking, elbow replaced I

(Load Reduction) 01-03 810124 F 17.42 B 3 lill llTEXCil "6B" FW litr. tube leaks, leaks weld repaired 01-04 810129 F 65.18 A 3 XX PUMPXX E.ll. Oil Pump (s) Failure - One was replaced due to seal problems and the other had a crack repaired on ,g the discharge unloader piping g g 6 3 h?'e)

I . 2 3 4 fl F: Forced Reauin: Method: Exhibit G Instructions for Prep.ir.ition of Data y

S: Sshedu!cd A Equipment Failure (Explain) 1 M w n:I 1:4taintenance of Test 2 Mannil Scra:n.

3 .\uionatic Scram.

Entry Sheets for laecn.ee Event Itep nl (1.1 lt i I de iNUREG.

gg C 1;ct ueling D.Iternlatory Restriction 1-Othee (Explain) Ol6i)

L-Opeutin Tr:.ining & License Examination F Asinunisto:ive G.uperational I nur (Explain) 5 Exinbii I Same Source 9

(9/77) Il Othes (E sp?ain)

r.nclosura to seriaA: te r.r/ o t-443 ]

11 age 3 of 3 . AVERAGE DAlt.Y UNIT l'0WER LEVEL ,

DOCKET NO. DPR-23 WIT H. B. Robinson Two DATE 810203 CO\!PLE1 E D itY M. L. Watford TELEPilONE (803) 383-4524 3!0NTl! January, 1981 DAY AhERACE DAILY POWER LEVEL DAY AVER AGE D \tLY POhER LEVEL (31We-Net) g 31We-Net) 1 722 37 724 722 jg 708 2

22 m 3 l9 a

4 608 20 723 720 722 5 21 723  ;)

722 6

7-24 661

, 7 g 723 24 321 723 42 9 35

~

10 589 714 26 11 721 27 689 722 722 12 28 00 13 29 723 -

-19 14 30 723 _19

! 15 3g 16 724 -

INSTRUCTIONS On this format.hst the average Jaily unit power leselin 31We Net for each day ir, the reporting inonth. Compute to the nearest whole nwpwatt.

(9/771 1

1 i

=.m- #

, , e i -_. .. _ . . , _

,