ML19345E672

From kanterella
Jump to navigation Jump to search
Application for Proposed Tech Spec Changes Re Anticipatory Reactor Trip Sys.Revisions Involve Changes to Items 36 & 42 of Table 4.1-1,adding Monthly Check & Calibr Once Every 18 Months for Reactor Trips
Date released: 12/25/2019 Download: ML19345E672


Revised Tech Spec Table 4.1-1,re Anticipatory Reactor Trip Sys,Adding Monthly Check & Calibr Once Every 18 Months for Reactor Trip Upon Loss of Main Feedwater Circuitry & Upon Turbine Trip Circuitry
ML19345E673
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/29/1981
From:
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19345E673 (2)
Application for Proposed Tech Spec Changes Re Anticipatory Reactor Trip Sys.Revisions Involve Changes to Items 36 & 42 of Table 4.1-1,adding Monthly Check & Calibr Once Every 18 Months for Reactor Trips
ML19345E671
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/29/1981
From: Cavanaugh W
ARKANSAS POWER & LIGHT CO.
To: REID R W
Office of Nuclear Reactor Regulation
References
Download: ML19345E671 (2)