ML19345D698

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1980
ML19345D698
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 12/02/1980
From: Jonathan Brown, Culver M
FLORIDA POWER CORP.
To:
Shared Package
ML19345D694 List:
References
NUDOCS 8012160489
Download: ML19345D698 (7)


Text

.

O OPERATING DATA REPORT DOCKET NO.

50-302 DATE 12/2/80 COMPLETED BY J.

A.

Brown TELEPHONE 904-in-6486 OPERATING STATUS Crystal River Unit 3 Notes g, gg, g,.

11/1/80 thru 11/30/80

2. Reporung Period:

2452

3. Licensed Thermal Power (MWt):

890

4. Nameplate Rating (Gross MheI:

825

5. Design Electrical Rating (Net MWe):

821

6. Maximum Dependable Capacity (Gross MWet
  1. 02
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power LevelTo which Restricted.If Any(Net MWep:

None N/A

10. Reasons For Restrictions. If Any:

{

This Month Yr..to-Date Cumulative 720 8040 32616

11. Hours In Reporting Period 720 4005.29 19155.59
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 0

12.32 1129.22

14. Hours Generator On-Line 720 3940.55 18640.75
15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1,678,649 8,734,293 41,089,034
17. Gross Electrical Energy Generated (MWH)

-- 576,568.6

_,2,972,467.8 13,944,236

18. Net Electrical Energy Generated (MWH)
uau, 2822000 13213640 I
19. Unit Service Factor 100%

49.%

5 7. 2 *;

l

20. Unit Availability Factor 100%

49.%

57.2%

21. Unit Capacity Factor (Using MDC Nett 97.43%

44.564 51.81%

22. Unit Capacity Factor (Using DER Net) c ' w' 42.54%

49.11%

0.%

7.6%

31.1%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eache None
25. If Shur Down At End Of Report Penod. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation s:

Forecast Achieved 1/10/77 INITIAL CRITICALITY 1/30/77 INITIAL ELECTRICITY 3#lJ/77 COMMERCIA L OPER ATION

((

s.

toi-3 8012100 N

096 b

i 50-302 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. _

UNI r NAME flCPP-3 DATE 12/9/80 REPORT MONTil November (p.1 of 4)

COMPLETED BY

_M. W. Culver TELEPif0NE 904-795-6486 "i

=_

ei 3 =a 5

Y3USC SL EUf fCCIb4C y"-

9 8.

/

~ $

5

'"2 h b 5e u

2 :;

2 g a:

Event a7 c.$

Action to d5 j5 Report 2r

<N G U

Present Recurrence Q

80-26 801105 S

17.75 A

N/A N/A HC flTEXCH Reduced power to clean "D" waterbox and look for leak.

80-27 801107 F

16.02 A

N/A N/A HC f!TEXCH Reduced power for increase in "D" t,.terbox leakage. Icaks were found and plugged.

i Y

%=d (c o )

2EMEN tene) i

'1 4

F: Forced Reason:

Method:

Exhibit G !nstructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data "2-,'

P B Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic ScrJm.

Event Repot t (I.E Rl l ite (NUREG-p D Regulatory Restriction 4-Ot!x t (lisplain )

016I) 1: Operator Training & License Examination b

F Administrative 5

G-Operational Error (Explain)

Estubit 1 - Same Source 19/77)

!! Other (1.xplain )

f%

?

50-302 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

UNI T NAME FIfRP-3

~

DATE - 12/9/80 REPORT MONTil November (p. 2 of 4)

COMPI.ETED BY

.M. W. Culver _

TELEPHONE (904) 795-6486 1

4 E

E 3?

3

[

cause & Corrective

$']

Licensee

,E g f,$

No.

Date 3

3g g

,g g y Event a7 a

Action to f5 5

jgg Report #

97 0 V

H Present Recurrence b

80-28 801109 F

2.32 H

N/A N/A HC ITIEXCH Reduced power to check for source of noise in "D" waterbox. Sacrificial metal on the inlet side needed tightening.

80-29 801110 S

10.85 B

N/A N/A HC HTEXCII Reduced power to clean "A" waterbox.

80-30 801110 S

9.78 B

N/A N/A HC llTEXQi Reduced power to clean "B" waterbox.

80-31 801111 S

8.67 B

N/A N/A HC.

HTEXQI Reduced power to clean "C" waterbox.

80-32 801112 S

9.03 A

N/A N/A HC ITTEXCI Reduced power to find a saltwater leak in "D" waterbox.

80-33 801115 S

17.83 B

N/A N/A HB

ZZZZZ7, Varying power between 95 and 100%

FP during testing to determine where unit efficiency can be inproved and nore fNe gained.

Lc=3 b=e) 25e)

O 2

3 4

F: Forced Reason:

Method:

Exlubit G - Instructions M

S: Stheduled A Equipment Failure (Explain)

I-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.

Entr> Sheets for Licensee C-Refueling 3-Automatic Scram.

Event ReporI(LI:R) File (NURI:G-D Regulatory Restriction 4 Other (Explain) 0161) pg E-Operator Training & License Examination F. Administ rative 5

h G-Operational Error (Explain)

Exhibit 1 - Same Source y

i 08/77)

I! Oiher (Explain) 4

  1. Eh
  1. 14

/***

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNIT,N AM E FICRP-3 DATE 12/'9/80 f

REPORT MONTil November (p. 3 of 4)

COMPLETED BY M W rulvor TELEPflONE (904)-795-6486 1

.5 g 3

Licensee

,E r, Cause & Correceive No.

Date c.

9E 3

S

[s 3,5 $

3~

Event 3?

b 'S o-'

Action to Report it (E C Present Recurrence q

u C

80-34 801124 F

12.15 A

N/A N/A IIC IrrEXG Reduced power to locate a saltwater leak in "D" waterbox. Leaking trbes were located and plugged.

8'0-35 801125 F

4 A

N/A N/A Hl!

CKTBRK Reduced power due to a failure in the main controller for the magnetic coupling on a condensate punp. Coup-ling was switched to the auxiliary controller and the pump restored to M

service.

O L_9 Bel 0

9 M

% cd W

I 2

3 4

F: Forced Reason:

Methe 4:

Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain)

I Manol for Preparation of Data b

B. Maintenance of Test 2-Manua: Scram.

Entr> Sheets for Licensee C-Refueling 3 Automatic Scram.

Event Repori ILER) File (NURI Cr D. Regulatory Restriction 4 Other (INplam) 0161)

E-Operator Training & License Examination F-Administrative 5

G Operational Error (Explain)

Exhibit I Same Source (9/77)

I!-Ot her ( E xplain)

~

4 pr%

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-302 UNI I.N AM E FDCRP-3 DATE 12/9/90 REPORT MONTil November (p. 4 of 4)

TELF I NE 90 )

5 86 E

c

.3 ?

3

$ E "4 Licensee

,Eg f.

Cause & Corrective Date a

E 4

.g E s I:~ent ug

n. ?

Action to S

[s 5

Rer. ort *r

<E 0 h0 Present Recurrence

~ d :{

u O

80-36 801126 F

17.17 A

N/A N/A IIB ITIEXCII Power was slightly reduced when "A" and "D" moisture separator / reheaters were isolated due to suspected tube leaks.

80-37 801126 S

2.03 11 N/A N/A IIII CKTBRK Reduced power to place the coupling for the consendate punp back on the g

main controller.

6 9

80-38 801128 S

0.82 F

N/A N/A ZZ ZZZZZZ IIeld at slightly reduced power by dispatcher.

M e

9 h?'e) b cd WW b

I 2

3 4

F: Forced Reason:

Method:

Exhibit G-Instructions S; Scheduled A-Equipment Failure (Explain) l-Manual for Preparatmn of Data B-Maintenance of Test 2 Manual Scram.

Entry Sheets for Licensee C-Refueling 3 Automatic Scram.

livent Report (LI:R) ble (NUREG-D Regulatory Restriction 4 Olher I Explain) 0161)

E-Operator Training & License Examination F Admmistrative 5

G-Operational Error (Explain)

Exlubit I-Same Source 19/77)

I! Other (E xplain) l

AVERAGE DAILY UNIT POWER LEVEL 50-302 DOCKET NO.

FLCRP-3 UNIT 12/2/60 DATE J. A. Brown COMPLE1ID BY TELEPHONE 904-795-6486 November MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net iMwe-Net) 790 839 j

789 778 2

3 798 786 3

792 796 4

'O 767 y75 5

6 652 791 7

718 790

3 751 707 8

24

/

774 701 9

25 682 752 10 26 706 779 II 779 32

3 792 768 13

,9 843 801 14 3g 772 35 31 I00 16 INSTRUCTIONS On this format.!:st the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute tu the nearest whole megawatt.

en??,

s

MONTHLY OPERATIONAL

SUMMARY

STATEMENT I

DOCKET NO.

sn_1n?

UNIT pirnp_1 DATE 12/10/80 COMPLETED BY M u.cmNER TELEPHONE (9041795-6486 MONTH November 1980

SUMMARY

STATEMENT:

Crystal River Unit 3 operated near full power all month with the exception of the 13 power reductions listed above.

.