ML19345D698
| ML19345D698 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 12/02/1980 |
| From: | Jonathan Brown, Culver M FLORIDA POWER CORP. |
| To: | |
| Shared Package | |
| ML19345D694 | List: |
| References | |
| NUDOCS 8012160489 | |
| Download: ML19345D698 (7) | |
Text
.
O OPERATING DATA REPORT DOCKET NO.
50-302 DATE 12/2/80 COMPLETED BY J.
A.
Brown TELEPHONE 904-in-6486 OPERATING STATUS Crystal River Unit 3 Notes g, gg, g,.
11/1/80 thru 11/30/80
- 2. Reporung Period:
2452
- 3. Licensed Thermal Power (MWt):
890
- 4. Nameplate Rating (Gross MheI:
825
- 5. Design Electrical Rating (Net MWe):
821
- 6. Maximum Dependable Capacity (Gross MWet
- 02
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power LevelTo which Restricted.If Any(Net MWep:
None N/A
- 10. Reasons For Restrictions. If Any:
{
This Month Yr..to-Date Cumulative 720 8040 32616
- 11. Hours In Reporting Period 720 4005.29 19155.59
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours 0
12.32 1129.22
- 14. Hours Generator On-Line 720 3940.55 18640.75
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (MWH) 1,678,649 8,734,293 41,089,034
- 17. Gross Electrical Energy Generated (MWH)
-- 576,568.6
_,2,972,467.8 13,944,236
- 18. Net Electrical Energy Generated (MWH)
- uau, 2822000 13213640 I
- 19. Unit Service Factor 100%
49.%
5 7. 2 *;
l
- 20. Unit Availability Factor 100%
49.%
57.2%
- 21. Unit Capacity Factor (Using MDC Nett 97.43%
44.564 51.81%
- 22. Unit Capacity Factor (Using DER Net) c ' w' 42.54%
49.11%
0.%
7.6%
31.1%
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Eache None
- 25. If Shur Down At End Of Report Penod. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation s:
Forecast Achieved 1/10/77 INITIAL CRITICALITY 1/30/77 INITIAL ELECTRICITY 3#lJ/77 COMMERCIA L OPER ATION
((
s.
toi-3 8012100 N
096 b
i 50-302 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO. _
UNI r NAME flCPP-3 DATE 12/9/80 REPORT MONTil November (p.1 of 4)
COMPLETED BY
_M. W. Culver TELEPif0NE 904-795-6486 "i
=_
ei 3 =a 5
Y3USC SL EUf fCCIb4C y"-
9 8.
/
~ $
5
'"2 h b 5e u
2 :;
2 g a:
Event a7 c.$
Action to d5 j5 Report 2r
<N G U
Present Recurrence Q
80-26 801105 S
17.75 A
N/A N/A HC flTEXCH Reduced power to clean "D" waterbox and look for leak.
80-27 801107 F
16.02 A
N/A N/A HC f!TEXCH Reduced power for increase in "D" t,.terbox leakage. Icaks were found and plugged.
i Y
%=d (c o )
2EMEN tene) i
'1 4
F: Forced Reason:
Method:
Exhibit G !nstructions S: Scheduled A. Equipment Failure (Explain) 1-Manual for Preparation of Data "2-,'
P B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic ScrJm.
Event Repot t (I.E Rl l ite (NUREG-p D Regulatory Restriction 4-Ot!x t (lisplain )
016I) 1: Operator Training & License Examination b
F Administrative 5
G-Operational Error (Explain)
Estubit 1 - Same Source 19/77)
!! Other (1.xplain )
f%
?
50-302 UNITSHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNI T NAME FIfRP-3
~
DATE - 12/9/80 REPORT MONTil November (p. 2 of 4)
COMPI.ETED BY
.M. W. Culver _
TELEPHONE (904) 795-6486 1
4 E
E 3?
3
[
cause & Corrective
$']
Licensee
,E g f,$
No.
Date 3
3g g
,g g y Event a7 a
Action to f5 5
jgg Report #
97 0 V
H Present Recurrence b
80-28 801109 F
2.32 H
N/A N/A HC ITIEXCH Reduced power to check for source of noise in "D" waterbox. Sacrificial metal on the inlet side needed tightening.
80-29 801110 S
10.85 B
N/A N/A HC HTEXCII Reduced power to clean "A" waterbox.
80-30 801110 S
9.78 B
N/A N/A HC llTEXQi Reduced power to clean "B" waterbox.
80-31 801111 S
8.67 B
N/A N/A HC.
HTEXQI Reduced power to clean "C" waterbox.
80-32 801112 S
9.03 A
N/A N/A HC ITTEXCI Reduced power to find a saltwater leak in "D" waterbox.
80-33 801115 S
17.83 B
N/A N/A HB
- ZZZZZ7, Varying power between 95 and 100%
FP during testing to determine where unit efficiency can be inproved and nore fNe gained.
Lc=3 b=e) 25e)
O 2
3 4
F: Forced Reason:
Method:
Exlubit G - Instructions M
S: Stheduled A Equipment Failure (Explain)
I-Manual for Preparation of Data B. Maintenance of Test 2 Manual Scram.
Entr> Sheets for Licensee C-Refueling 3-Automatic Scram.
Event ReporI(LI:R) File (NURI:G-D Regulatory Restriction 4 Other (Explain) 0161) pg E-Operator Training & License Examination F. Administ rative 5
h G-Operational Error (Explain)
Exhibit 1 - Same Source y
i 08/77)
I! Oiher (Explain) 4
- Eh
- 14
/***
UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 UNIT,N AM E FICRP-3 DATE 12/'9/80 f
REPORT MONTil November (p. 3 of 4)
COMPLETED BY M W rulvor TELEPflONE (904)-795-6486 1
.5 g 3
Licensee
,E r, Cause & Correceive No.
Date c.
9E 3
S
[s 3,5 $
3~
Event 3?
b 'S o-'
Action to Report it (E C Present Recurrence q
u C
80-34 801124 F
12.15 A
N/A N/A IIC IrrEXG Reduced power to locate a saltwater leak in "D" waterbox. Leaking trbes were located and plugged.
8'0-35 801125 F
4 A
N/A N/A Hl!
CKTBRK Reduced power due to a failure in the main controller for the magnetic coupling on a condensate punp. Coup-ling was switched to the auxiliary controller and the pump restored to M
service.
O L_9 Bel 0
9 M
% cd W
I 2
3 4
F: Forced Reason:
Methe 4:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain)
I Manol for Preparation of Data b
B. Maintenance of Test 2-Manua: Scram.
Entr> Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Repori ILER) File (NURI Cr D. Regulatory Restriction 4 Other (INplam) 0161)
E-Operator Training & License Examination F-Administrative 5
G Operational Error (Explain)
Exhibit I Same Source (9/77)
I!-Ot her ( E xplain)
~
4 pr%
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-302 UNI I.N AM E FDCRP-3 DATE 12/9/90 REPORT MONTil November (p. 4 of 4)
TELF I NE 90 )
5 86 E
c
.3 ?
3
$ E "4 Licensee
,Eg f.
Cause & Corrective Date a
- E 4
.g E s I:~ent ug
- n. ?
Action to S
[s 5
Rer. ort *r
<E 0 h0 Present Recurrence
~ d :{
u O
80-36 801126 F
17.17 A
N/A N/A IIB ITIEXCII Power was slightly reduced when "A" and "D" moisture separator / reheaters were isolated due to suspected tube leaks.
80-37 801126 S
2.03 11 N/A N/A IIII CKTBRK Reduced power to place the coupling for the consendate punp back on the g
main controller.
6 9
80-38 801128 S
0.82 F
N/A N/A ZZ ZZZZZZ IIeld at slightly reduced power by dispatcher.
M e
9 h?'e) b cd WW b
I 2
3 4
F: Forced Reason:
Method:
Exhibit G-Instructions S; Scheduled A-Equipment Failure (Explain) l-Manual for Preparatmn of Data B-Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
livent Report (LI:R) ble (NUREG-D Regulatory Restriction 4 Olher I Explain) 0161)
E-Operator Training & License Examination F Admmistrative 5
G-Operational Error (Explain)
Exlubit I-Same Source 19/77)
I! Other (E xplain) l
AVERAGE DAILY UNIT POWER LEVEL 50-302 DOCKET NO.
FLCRP-3 UNIT 12/2/60 DATE J. A. Brown COMPLE1ID BY TELEPHONE 904-795-6486 November MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL iMWe-Net iMwe-Net) 790 839 j
789 778 2
3 798 786 3
792 796 4
'O 767 y75 5
6 652 791 7
718 790
- 3 751 707 8
24
/
774 701 9
25 682 752 10 26 706 779 II 779 32
- 3 792 768 13
,9 843 801 14 3g 772 35 31 I00 16 INSTRUCTIONS On this format.!:st the average daily unit power levelin MWe Net for each day in the reporting inonth. Compute tu the nearest whole megawatt.
en??,
s
MONTHLY OPERATIONAL
SUMMARY
STATEMENT I
DOCKET NO.
sn_1n?
UNIT pirnp_1 DATE 12/10/80 COMPLETED BY M u.cmNER TELEPHONE (9041795-6486 MONTH November 1980
SUMMARY
STATEMENT:
Crystal River Unit 3 operated near full power all month with the exception of the 13 power reductions listed above.
.