Text
_
O OFER ATING DATA REPORT DOCKET NO. 50-255 DATE 12/8/8Q,__
COMPLETED BY PJBodtke T ELEPHONE 616-764-8913 OPE RATING STATUS N
5 Palisades
- 1. Urut Name:
801101 - 801130
- 2. Reporting Period:
2530
- 3. Licenwd Thermal Pow er (Mht):
811 7
- 4. Nameplate Rating (Gross MWe):
805
- 5. Design Electrical Rating (Net MWe):
- 675
- 6. Masimum Dependable Capacity (Gross MWe):
- 635
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. 0 %e Reasons:
- 9. Power Lesel To which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.lf Any:
This Month Yr.t o.Dat e Cumulatis,e 720 8040 78,471 11, Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical 0
3467.3 43,032.1
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 0
3346.5 40,772.8
!3. Uni: Resene Shutdown Hours 0
7,271,496 78,782,976
- 16. Gross Thermal Energy Generated (MWH) 0 2,247,680 24,279,910
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH) 0 2,111,648 22,782,423
- 19. Unit Senice Factor 0
41.6 52.0 0
41.6 52.0
- 20. Unit Asailability Factor 0
41.4 45.7
- 21. Unit Capacit) Factor (Using MDC Net) 0 32.6 36.1
- 22. Unit Capacity Factor (Using DER Net) 0 13.4 35.1
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 Months (Type.Date and Duration of Eacht:
I
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
12/12/80
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achiesed INITIA L CRITICA LITY INITI AL ELECTRICITY COMMERCI AL OPER ATION
- Based on Condenser Backpressure (W77) l 8012160 M
~'
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
5,_1-255 Palisades WIT DATE 12/8/80 COMPLETED BY PJBodeke 616-764-8913 TELEPHONE November 1980 MONTH DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 I
O 37 0
2 0
gg 0
0 3
39 0
0 4
20 0
5 0
21 0
6 22 0
t 7
0 n
0 8
24 0
0 9
25 0
10 26 11 0
0 27 0
o 12 u
13 0
29 0
0 0
14 30 0
IS 3,
0 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
,<,._m y
[
[
t 50-255 UNIT SilUIDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAME Palisades DATE 12/8/80 COMPLETED 8Y PJBodtke REPORT MONTil Nov. 1980 616-764-8913 TELEPHONE v.
=
c
,5 ?
3
$ Yid Licenser En, l"3 Cause & Corrective gg g
jg5 Event g?
gV No.
Date n.
Action tu S
$5 5
j ;ji y Report a mV Prevent Recurrence g
5 20 801101 S
720.0 B
1 Turbine inspection.
(Contd) i f
9 6
9 Be)
O
- 2 s 6 c0 I
3 4
FM F: Forced Reason:
Method:
Exhibit G Instructions g
S: Scheduled A Equipment Failure (Explain)
I Manua; for Preparation of Data B Maintenance of Test 2 Manual Scram.
Entry Sheets for Licensee b
C. Refueling 3-Artomatic Scram.
Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F Administrative 5
G-Operational Error (Explain)
Exhibit 1 - Same Source F1/77)
Il Other (Explain)
SLWfARY OF OPERATING EXPERIENCE FOR THE MONTH OF NOVEMBER 1980 Plant shut down entire month for turbine inspection, repair of containment isolation valves and replacement of seal on primary coolant pump.
._,