ML18046A226
| ML18046A226 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 12/08/1980 |
| From: | Kennedy D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC COMMISSION (OCM) |
| Shared Package | |
| ML18046A227 | List: |
| References | |
| NUDOCS 8012160425 | |
| Download: ML18046A226 (5) | |
Text
'* :_.
consumers Power company Palisades Nuclear Plant: Route 2, Box 154, Covert, Michigan 49043 December 8, 1980 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555 LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50~255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of November 1980.
David M Kennedy General Engineer CC JGKeppler, USNRC KWBerry, P24-207A DPHoffman, P24-115 GHRPetitjean, Palisades Resident Inspector, Palisades CVWaits, Pll-228B LTPhillips, P21-327 DEVanFarowe, Div of Radiological Health Lansing, MI SMierzwa, Mich Dept of Labor RCallen, Mich Public Service Commission BLavallee, NSAC Document Control (2) 950-22*35*10
. \\.Q
(..)
l..l.l L~
0 g.:
~*-*
~~. :
80121607"25
OPERATING DATA REPORT DOCKET NO. 50-255 DATE 12/8/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 OPERA TING ST A TUS I. Unit Name:
Palisades Notes
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
801101 -
801130 2530
- 4. Nameplate Rating (Gross MWe):
811. 7
- 5. Design Electrical Rating (Net MWe):
805
- 6. Maximum Dependable Capacity (Gross MWe): -*--=-6"--7=-5_* ___ _
- 7. Maximum Dependable Capacity (Net MWe):
_*_6=3=5~----
- 8. If Changes C?ccur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date
- 11. Hours In Reporting Period 720 8040
- 12. Number Of Hours Reactor Was Critical 0
3467.3
- 13. Reactor Reserve Shutdown Hours.
- 14. Hours Generator On-Line 0
3346. 5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 0 7, 2 71, 4 9 6
- 17. Gross Electrical Energy Generated (MWH) 0 2, 24 7, 680 I 8. Net Electrical Energy Generated (MWH) 0 2, 111, 648
- 19. Unit Sen'ice Factor 0
- 41. 6
- 20. Unit Availability Factor 0
- 41. 6
- 21. Unit Capacity Factor (Using MDC Net) 0
- 41. 4
- 22. Unit Capacity Factor (Using DER Net) 0
- 32. 6
- 23. Unit Forced Outage Rate 0
- 13. 4 *
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
- Based on Condenser Backpressure 12/12/80 Forecast Cumulative 78,.471 43,032.1 40,772.8 78,782,976 24,279,910 22,782,423 52.0 52.0 45.7 36.1 35.1 Achieved
VERAGE DAILY UNIT POWER LEVEL
- DOCKET NO.
50-255 UNIT Palisades DATE 12/8/80 COMPLETED BY PJBodtke TELEPHONE 616-764-8913 MONTH November 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 0 17 0
2*
0 18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
0 22 7
0 23 0
0 0
8 24 9
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt_
(9/77)
No:
20 (Contd)
F: Forced Dall!
801101 S: Scheduled (lJ/77)
UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH Nov *. 1980 l'"I s
720.0 B
l Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C'-Refueling D-Rcgulatory Rcstrii.:tiun Licensee Event Report #
E-Opcrator Training & License Examination F -Ac.J mi nist rat ivc
. G-Opcra ti on al Error (Explain)
II-Other (Explai11) 3 c
"'in c
<!J 0 'O
. 0. ';)
Ev 8
Method:
I-Manual 2*Manual Scram.
3-Autumatic Scram.
4-0thcr (Explain)
DOCKET NO.
5.0-255 UNIT NAME. '""'P~a=l'T'1=* s;,.;;a;;...;;d;;...;;e=s'-----
D A TE.~1~2~/_8~/8~0~~~
COMPLETED BY PJBodtke TELEPHONE 616-764-8913
- cause & Corrective Action to Prevent Recurrence Turbine inspec.tiort.
4 5
Exhibit G *Instructions for Preparation of Data Entry Sheets fur Licensee Event Report (LER) File (NUREG*
0161)
Exhibit I *Same Soun.:~
\\;*
SUMMARY
OF OPERATING EXPERIENCE FOR THE MONTH OF NOVEMBER 1980 Plant shut down entire month for turbine inspection, repair of containment isolation valves and replacement of seal on primary coolant pump.