05000334/LER-1980-085-01, /01T-0:on 801124,two Nuclear Power Range Instruments Indicated Zero Power.Caused by Actuation of High Voltage Protection circuit,de-energizing Detectors.Shift Turnover Checklist Changed to Increase Checking Frequency

From kanterella
(Redirected from ML19345D341)
Jump to navigation Jump to search
/01T-0:on 801124,two Nuclear Power Range Instruments Indicated Zero Power.Caused by Actuation of High Voltage Protection circuit,de-energizing Detectors.Shift Turnover Checklist Changed to Increase Checking Frequency
ML19345D341
Person / Time
Site: Beaver Valley
Issue date: 12/05/1980
From: Lacey W
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19345D337 List:
References
LER-80-085-01T, LER-80-85-1T, NUDOCS 8012120530
Download: ML19345D341 (2)


LER-1980-085, /01T-0:on 801124,two Nuclear Power Range Instruments Indicated Zero Power.Caused by Actuation of High Voltage Protection circuit,de-energizing Detectors.Shift Turnover Checklist Changed to Increase Checking Frequency
Event date:
Report date:
3341980085R01 - NRC Website

text

.

u. s. NuctE An REtut ATc::v Commission Rc pones ase wn, LICENSEE EVENT REPORT CoseTRot atoCie l l

l l

l 1

l@

(PLE Ass PRINT OR TYPE ALL REQUIRED INFORMATIONI lo t il I F I A 13 IV 1311 l@l 010 l-1010101010 l-1010 l@l4 11 11 11 11 l@l l@

vC Ns..C:ce 4

v a a No-..-

a uu~a tv s a 3, w s.

CON'T RTTI l,"C! LL_J@l 015 I 010 10 I 3 I 3 I ' 1@l i l t i 21 e.I ai ni@ i i 2 I n i, ! a j n I@

7 4

m3 41 CoCKET Nuustm os 69 Ev(NT QATE t.

REPO6T D AT E 80 EVENT CESCRIPTICN Ak'Q PRCO A8LE CONSECUENCES h I o ! 2j lAt about 0600 hNrs ory November 20 1980. two oint of four nuclear Icaer rance i

la121 l instruments were indicatinc =cro percent power.

It was found that the hich voltace l 1 o 4 41 l protection circuit had actuated, deenergizing the detectors. This could have led tog i,3;s;; power operation with only two operable power range detectors, violating Technical j

Considerinr, that the circuit; g l Specification 3.0.3 Limiting Conditions For Operation.

[o;7glis for high voltage protection, there had to have been a voltage spike to actuate l

l

,3,4; ;the circuit. There is no traceable information to indicate a voltage increase.

l 80 7

8 9 COMP vatv!

sysTtw

CAUSE

CAUSE CCOE CCCE sveCOCE C0uPONE NT CODE sVSCOCE suSCOCE l II Alh I Xlh Wh l T l NI Sl Tl Rl Ul@ l Pl@ l Zl@

lots!

7 s

e to is 12 83 i.

is 20 SEcu(NTIAL OCCURA(NCE p(PCRT REVislQ i EvtMTvtAn m EPORT NO.

CODE TYPE No.

@ ;LEn,mo

<g 18101 1-1 1018151 pl 10111 ITI H.

l 01 I

4 a,

a n

2.

a u

n ao 2

u

^5e'EI,"Tsf,En'"$$e.

'"s'U,k"?sI' uffu"FfEEn'an l010l0@1Ol YAIi!aY '2CIYEd oUtfNr

    • f7 To" ovas s

v l Yl@

l N j@

[N l@

l Z l 9 19 l 9 [@

1Cl@lzl@

lZ{@

lZl@

u 2

2s 2.

u

.o

.i 43 CAUSE CESCRtPTICN AND CORRECTIVE ACTICNS h lA change was made to the Shift Turnover Checklist to address checking the i o I

IiIiilinstruments every shift.

l Ii # il I l i 131 1 l

I l i 141 I 30 7

4 9 sA

% PCwtM oTHER STATUS c.s RY OtsCovtRY DESCRIPTION l1 I5l W @ l0l0l0l@l

'U A l

l A l@! neerator observation l

a

'!Tivir, Co'#rN, AuouNT CF ACTIVITY @ I LOCATION CF AELEAst @

A a n tAsro er aetcAsE N/A I

N/A I

l Ii Is I LEJ @ L:J@&s

...se~N.1.,os essCa,mc~ @

vuu..

Tv,e l'iTT1 1010101@l Z l@l N/A 1

.c oso~N a',,,,u'ies

ssCai.e.o~@

1010101@l N/A I

i 4 30 4 9 si t2 LCO3 CF QR O Au AGE TO FACluTY TV

  • t DisCReefloN 8 Izl@l N/A l

.ssu,';'"*d's"C...,,o~ @80 12120 SN

  • acus'o"

Lij.2J l N l@l N/A l

ll llllllll lll}

68 69

30. ;

F 4 3 to W.

S.

.acey PHONE:

NAME OF PREPARER

li Attachment To LER 80-85/01T I

Beaver Valley Power Station i

Duquesne Light Company' Docket No. 50-334 4

j At approximately 0600 hours0.00694 days <br />0.167 hours <br />9.920635e-4 weeks <br />2.283e-4 months <br /> on November 20, 1980, an operator observed that two out of four (2/4) power range nucicar instruments were reading zero (0) percent power. At this time, the plant was actually at 2 percent reactor

+

power. Technicians verified that there was no high voltage power supplied to the power range instruments. The lack of high voltage was due to a high voltage " crow bar" circuit that automatically deenergizes the power supply on i

a voltage spike. The reason that this was not annunciated was that the " loss of high voltage" alarm was removed as part of a Design Change Package. A change was made to the Shift Turnover Checklist to address checking the instruments every shift.