T N - i NERMONTX AN KEE NUCLEAR POWER CORPORATION
.i:
' SEVENTY SEVEN GROVE STREET B.3.2.1
.KUT1.AND. VERMONT ' 0G701 WVY 80-165 REPLY TO.
December 2, 1980 ENGINEERING OFFICE TU RNPIK E R C f.D United States Nuclear Regulatory Commission WESTBOROJ M ASS AC hut E TT S C 13 81 Washingt on, D.C. - 20555 reterwone m m e Attention: Office of Nuclear _ Reactor Regulation f -
g bferengs:
(a) License No. DPR-28 (Docket No. 50-271)-
52 (b) Letter, USNRC to-All-Operating Reactor Licensees g
. L3N E
dated, May 7, 1980 E9 C
. pS!3 (c) Letter, USNRC to VYNPC, dated October 31, 1980; NUREG-0737 g;y
, T :
S(
(d) Letter (WVY 80-49), VYNPCoto USNRC, dated March 17,~1980; DZ d Proposed Change #7?
cs g
(e) Letter:(WVY 80-158), VYNPC to USNRC, dated y
November 12, 1980; Proposed Change #8C 7'
cs N
P E
I
Subject:
Response to Item IIK.317; Report on Outages of Emergency Core f
Cooling Systems
Dear Sir:
References.(b) and (c) required all licensees to submit a report detailing outage dates anc lengths of outages for all ECC systems for M e last 5 years _ of operation. Vermont Yankee has compiled the-requested information and it is provided as an attachment to this letter. Referer.ce (c) adds an additional requirement not previously required in Reference (b); opecifically.
that'"the licensee shall propgse changes to improve the availability of ECC' equipment, if needed."
Vermont-Yankea has no new changes to propose at this time. Several proposed changes have recently been submitted to the NRC which could i
potentially result in an improvement in system availability. The addition of analog level and pressure instrumentation as described in~ Reference (d) and alternative testing requirements as proposed in Refere'nce (e) are two' examples.
In many cases, improvements in system availability and reliability are obtained through the implementation of hardware and software changes, as allowed by 10CFR50 59 These changes are summarized in the annual report submitted to the NRC.
We trust this information adequately addresses the requirements of NUREG O',, ~ ltem IIK.3 17, however, should you have any questions do not hesitate to call.
Very truly yours, 4
VERMONT YANKEE NUCLEAR POWER CORPORATION 8hAxM i
R. L. Smith Licensing Engineer Attachment
--8012050#A 5
ECCS EQUIPMENT OUTAGE LIST (Action Plan Item 11.K.3.17) page 1 of 6 Syrtem and Date Component Time Out Cause Corrective Action llPCI 7/25/75 Cland Seal Condenser 3 hrs. 6 mins.
Casket Failure Due To Replaced Gasket Over "essurization 9/10/75 Turbine 4 hrs. 29 mins.
ThroLLle Valve Lift Replaced Lift Rods Rods lient by Probable Bumping by Contractor 4/21/76 LS 23-74 (CST Level)
Unknown Set Point Drift Recalibrated Switch 5/12/76 Gland Seal Condenser 5 brs.
Gasket Failure Due To Replaced Car,ket Overpressurizatton 5/19/76 LS23-91A (Torus Level) 40 mins.
Corrosion Product Flushed And Cleaned Float Buildup Chambers L2 23-74 (CST Level)
I hr. 40 mins.
Corrosion Product Flushed And Cleaned Float Buildup Chambers 6/4/76 LS23-91A (Torus Level) 40 mins.
Corrosion Product Flushed And Cleaned Float Buildup Chambers 6/17/76 Gland Seal Condenser 25 mins.
Gasket Fa11ure Due To Replaced Gasket, Condition Overpressurization Subsequently Corrected By Design Change (EDCR 75-19) 7/10/76 TS 23-101A (Steam Line Unknown Set Point Drift Recalibrated Switch liigh Temp. )
TS 23-102A (Steam Line liigh Temp. )
10/12/76 Pump P44-1A 40 mins.
Seal Water Line Leak Repaired by Welding Caused by Vibration 10/19/76 LS 23-74 (CST Level) 2 hrs. 50 mins. Total Corrosion Product Build-Replaced Switches (CST) Cleaned LS 23-75 (CST Level) up and Flushed Float Chambers LS23-91A (Torus i.evel)
(Torus)
ECCS EQUIPMENT OUTACE s ST (Action Plan Item II.K.3.17) page 2 of.6 System and Date Component Time Out Cause Corrective Action HPCI (cont.)
2/9/77 Turbine 4 hrs. 25 mins.
Corrosion Product Build-Cleaned As Necessary.
up in The Trip Throttle Valve 4/20/77 LS23-91A (Torus Level) Unknown Corrosion Product Build-Cleaning'.And Flushing 0f.
Float Chambers Done as Sched-up uled Maintenance 9/14/77 TS 23-101A.(Steam Line Unknown.
Set Point Drift Recalibrated Switches liigh Temp.) thru TS 3-104A 10/19/77 PS 23-68A-D (Stese Unknown Set Point Drift.
Recalibrated' Switches Supply Low Pressure) 11/8/77 Complete System 4 hrs. 35 mins.
Install Design Change N/A 2/16/78 DPIS 23-77 (Steam Line Unknown
-Set Point Drift Recalibrated Switch liigh A P) 4/25/78 Pump P44-1A 3 hrs. 11 mins.
Pump Seal Recircula-Repaired by Welding tion Line Leakage Caused by Vibration
'12/10/78 LT 16-19-38 A & B 3 hrs. 1 mins.
Loss of Reference Leg.
Refilled Reference Leg (Torus Level)
.2/14/79 LT 16-19-38 A & B 4 hrs.
Corrosion Product Build-Replaced Transmitters (Torus Level) up 8/16/79 LT 16-19-38 A & B 30 mins.
Loss of Reference Leg
' Refilled Reference Leg 9/20/79 1.T 16-19-38 A & B 5 hrs. 48 mins.
Loss of Reference Leg Repaired Valve and Refilled' (Torus i.evel)
Due to Bumping By Reference Leg Contractor 4
)
4-
=
ECCS EQUIPMENT GUTAGE LIST (Act. ion Plan Item II.K.3.17) page 3 of 6 System and 1) ate Compor.nt Time Out Cause Corrective Action lIFcI TcTiR1.)
11/10/79 1.T 16-19-38 A & B 30 mins.
Loss of Reference Leg Repaired Valve and Refilled (To rt.9 Level)
Due to Valve Leakage Reference Leg 1/3/80 Turbine 18 mins.
Turbine Trip Doe to Could Not Duplicate Spurious liigh Steam Flow Signal 1/28/80 Turbire 3 brs. 23 mins.
Turbine Trip Due to Cycled Valve, Could Not Dupli-Spurious Governor cate Problem Control Valve Trip 3/26/80 Flow Controller 2 hrs. 50 tains.
Component Failure Replaced Controller ADS 7/6/76 Relief Valves #'s 12, N/A Failed Air Operator Replaced Diaphrams 14 6 37 Diaphrams Caused By And Removed Insulation Illgh Temp.
Diaphrams Now Changed Each Refueling Outage Core Spray 2/4/75 PS14-44A (AUS Permiss-I hc. 15 mins.
Set Point Drift Replaced Switch ive) 7/7/75 V 14-11B 30 mins.
Failed Motor Operator Replaced Parts As Necessary 11/1/77 DPIS 14-43 A 6 B 44 mins.
Faulty Instrument Valve Replaced Manifold (Sparger A P)
Manifold LPIC 1/8/75 PS 2-3-52D Unknown Improper Calibration Recalibrated Switch (Reactor Pressure Permissive) 3/5/75 PS 2-3-52n 11 hrs. 38 mins Instrument Isolation Opened valves (Reactor Valves Closed Pressure Permissive)
ECCS EQUIPMENT OUTAGE LIST (Action Pitn item II.K.3.17) page 4 of 6-System and Date Component
. Time Out Cause Corrective Action LPCI-(cont.)
12/12/75 V 10-25A 23 hru. 46 mins.
Would Not Open Due To Modified Administrative-Excessive Differential Controls Pressure 2/17/76 V 10-25 A & B 1 hr.
Would Not Open Due To Implement Procedure-Failure To F.silow Procedures 4/15/76 V 10-25A Unknown Valve Bonnet Relief Reset Relief Valve Set Point Valve Set Point Drift 5/10/76 V lb-27 A & B 2 hrs. 30 mins.
Tight Packing Adjusted Packing 8/13/76 "B"
UPS 6 hrs. 15 mins.
Electronic Noise Removed Switch Tripped Unused Static Switch 9/20/76 "A"
UPS 1 br.
Failed Gate Firing Replaced Module Module 9/20/76 V 10-25 A 30 mins.
Could Not Open-Cause Cycled Valve, Could Not Unknown Duplicate Problem 9/30/76 "A"
UPS 44 mins.
Failed Filter Capacitor Replaced Component 10/13/76 "B"
UPS 1 hr. 27 mins.
Failed Power Supply Replaced Components 10/19/76 "B"
UPS 30 mins.
Unknown Could Not Duplicate Problem-
.11/18/76 "B
UPS 24 mins.
Fault, Voltage Regula-Replaced Components tor.& Logic 11/29/76 "A & B" UPS 36 hrs. 53 mins.
Failed Components Replaced Parts As Necessary 11/30/76 PS 2-3-52D Unknown Set Paint Drift Recalibrated Switch (Reactor Pressure Permissive)
ECCS EQUIPMENT OUTAGE LIST (Action Plan Item II.K.3.17) page 5 of 6 System and Date Component Time Out Cause Corrective Action-LPCl (cont.)
1/18/77 PS10-105 B, D, F, & 11 7 Days Closed Instrument opened Valves-(ADS Interlock)
Isolation Valves 1/18/77 "D"
RilR' Pump 1 br. 15 mins.
Loose Connection Tightened Connection-on Pump Breaker 3/18/77 "B"
UPS 2 hrs. 50 mins.
Failed Power Supply Replaced Components 5/30/78 "B"
UPS 5 hrs. 30 mins.
. Blown Fuse Heplaced Fuse 6/19/78 "B"
UPS 2 hrs. 28 mins.
Breaker Trip.
Reset Breaker Could Not Duplicate. Problem 6/29/78 "B"
UPS 13 hrs. 6 mins.
Logic Failure Replaced Components 3/17/79 "B"
UPS Unknown Spurious Power Supply Could Not Duplicate Problem Failure Helay 10 A-K46 Unknown Disconnected Wire Reconnected Wire 7/10/79 (V 10-27 Logic) A 1/2/80
'PS 2-3-52 C Unknown Set Point Drift Recalibrated Switch (Reactor Pressure Permissive) 4/1/80 V 2-53 B 6 hrs. 10 mins.
Loose Motor Operator Repaired As Necessary Internals 4/2/80 "A"
UPS 30 mins.
Facilitate Investiga-Adjusted Frequency Circuitry-tion of Frequency Drift 7/18/80 "B"
UPS 5 hrs.
Failed Logic Replaced Components 1
Other ECCS 7/24/75 LS 2-3-72 C Unknown Error in Calculating Corrected Procedure (Reactor Water Level)
Trip & Alarm Points
~
4 ECCS EQUIPMENT OUTAGE IJc" (Action Plan Item II.K.3.1.)
page 6 of 6 System and Date Component Time Out Cause Corrective Acti-
!m Other (cont.)
2/25/76 LS 2-3-72 A Unknown Set Point Drift Recalibrated 5/6/76 "B" Emergency Diesel 25 mins.
Probably Temporary Could Not Duplicate Problem Generator Clogging of The Crank Case Air Ejector Supply Orifice 6/23/77 "B" Emergency Diesel 2 hrs. 30 mins.
Loose Ilose Clamp on Replaced With Moru Reliably Generator Crank Case Air Ejector Dm'6ned Clamp 6/,5/77 "A" Emergency Diesel 3 hrs. 30 mins.
Binding Air Start Repaired As Necessary Generator Valves 9/17/77 1.S 2-3-72 A Unknown Loose Switch Internals Repaired As Necessary (Reactor Water Level) 12/19/77 "B" Emergency Diesel I hr. 34 mfa?.
Loose llose Clamp Caused Adjusted llanger And Tightened Generator by Spring llanger Being Clamp Out of Adjustment i
1/24/78 "A" Emergency Diesel 8 hrs. 53 r.ij n s.
Spullous Improper Opera-Recallorated Temperature Generator tion of The Cylinder Switches But Could Not Water Jacket Temp.
Duplicate Valve Problem Control Valve 1/25/78 LS 2-3-72 A Unknown Loose Switch Internals Repaired As Necessary (Reactor Water Level)