Forwards IE Insp Repts 50-508/80-08 & 50-509/80-08 on 800804-28.No Noncompliance Noted
ML19345C431
Person / Time
Site: Satsop
Issue date: 09/26/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Ferguson R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML19345C432 List:
References
NUDOCS 8012040677
Download: ML19345C431 (2)


See also: IR 05000508/1980008

Text

.

-

-.

-.

g

,

e*^

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

n

d

,I -

'

REGION V

I

WS

g

1990 N. CALIFORNIA BOULEVARD

SulTE 202, WALNUT CREEK PI AZA

a *&

i

WALNUT CREE K, CALIFORNIA 94508

em

SEP 21 l'd0

Docket fios. 50-508, 50-509

R

h

Tj

'

k

hh

Ei.G

2'

$8

<

Washington Public Power Supply System

Mr

gs;

-

P. O. Box 468

12lpi

o

c-TJ

Richland, Washington 99352

g

I

$@

'

N

d

5

Attention: Mr. R. L. Ferguson

O

A

E

Managing Director

I

i

Gentlemen:

Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5

This refers to the inspection conducted by Mr. T. W. Bishop of this office

from August 4-28, 1980 of activities authorized by NRC Construction Permits

,

Nos. CPPR-154 and CPPR-155, and to the discussion of our findings held by

Mr. Bishop with Mr. D. E. Dobson and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed inspectior,

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

observations by the inspector.

,

One continuing item of noncompliance was identified regarding structural welding.

Your actions to correct the condition and avoid further violation will be

examined in conjunction with our review of your reply to the Notice of Violation

on this same subject discussed in flRC Report 50-508/80-06 provided to you

by NRC:RV letter of September 4, 1980. No other items of noncompliance with

NRC requirements were identified within the scope of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

'

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any infctmation that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20

days of the date of this letter, requesting that such information be withheld

from public disclosure. .The application must include a full statement of the

reasons why it is claimed that the information is proprietary. The application

should be prepared so that any proprietary information identified is contained

in an enclosure to the application, since the application without the enclosure

will also be placed in the Public Document Room.

If we do not hear from you

in this regard within ;the specified period, the report will be placed in the

Public Document Rcom.

,

9

[

us'on o a WR

.

.

-

. -

..

- -

.

..

.

.

Washington Public Power Supply System

-2-

EP ' f 1950

i

Should you have any questions concernina this inspection, we will be glad

to discuss them with you.

Sincerely,

.

.

hG.S.Sp cer, Chief

~

g

Reactor Construction and Engineering

Support Branch

Enclosure:

IE Inspection Report

Nos. 50-508/80-08

50-509/80-08

cc w/o enclosure:

M. E. Witherspoon, Division fianager

Quality Assurance, WPPSS

cc w/ enclosure:

D. E. Dobson, Division Manager

W'IP-3/5,WPPSS

.

^h

-#