ML19345C431
| ML19345C431 | |
| Person / Time | |
|---|---|
| Site: | Satsop |
| Issue date: | 09/26/1980 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Ferguson R WASHINGTON PUBLIC POWER SUPPLY SYSTEM |
| Shared Package | |
| ML19345C432 | List: |
| References | |
| NUDOCS 8012040677 | |
| Download: ML19345C431 (2) | |
See also: IR 05000508/1980008
Text
.
-
-.
-.
g
,
e*^
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
n
d
,I -
'
REGION V
I
WS
g
1990 N. CALIFORNIA BOULEVARD
SulTE 202, WALNUT CREEK PI AZA
a *&
i
WALNUT CREE K, CALIFORNIA 94508
em
SEP 21 l'd0
Docket fios. 50-508, 50-509
R
h
Tj
'
k
hh
Ei.G
2'
$8
<
Washington Public Power Supply System
Mr
gs;
-
P. O. Box 468
12lpi
o
c-TJ
Richland, Washington 99352
g
I
$@
'
N
d
5
Attention: Mr. R. L. Ferguson
O
A
E
Managing Director
I
i
Gentlemen:
Subject: NRC Inspection at Washington Nuclear Projects Nos. 3 and 5
This refers to the inspection conducted by Mr. T. W. Bishop of this office
from August 4-28, 1980 of activities authorized by NRC Construction Permits
,
Nos. CPPR-154 and CPPR-155, and to the discussion of our findings held by
Mr. Bishop with Mr. D. E. Dobson and other members of your staff at the conclusion
of the inspection.
Areas examined during this inspection are described in the enclosed inspectior,
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
observations by the inspector.
,
One continuing item of noncompliance was identified regarding structural welding.
Your actions to correct the condition and avoid further violation will be
examined in conjunction with our review of your reply to the Notice of Violation
on this same subject discussed in flRC Report 50-508/80-06 provided to you
by NRC:RV letter of September 4, 1980. No other items of noncompliance with
NRC requirements were identified within the scope of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
'
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any infctmation that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 20
days of the date of this letter, requesting that such information be withheld
from public disclosure. .The application must include a full statement of the
reasons why it is claimed that the information is proprietary. The application
should be prepared so that any proprietary information identified is contained
in an enclosure to the application, since the application without the enclosure
will also be placed in the Public Document Room.
If we do not hear from you
in this regard within ;the specified period, the report will be placed in the
Public Document Rcom.
,
9
[
us'on o a WR
.
.
-
. -
..
- -
.
..
.
.
Washington Public Power Supply System
-2-
EP ' f 1950
i
Should you have any questions concernina this inspection, we will be glad
to discuss them with you.
Sincerely,
.
.
hG.S.Sp cer, Chief
~
g
Reactor Construction and Engineering
Support Branch
Enclosure:
IE Inspection Report
Nos. 50-508/80-08
50-509/80-08
cc w/o enclosure:
M. E. Witherspoon, Division fianager
Quality Assurance, WPPSS
cc w/ enclosure:
D. E. Dobson, Division Manager
W'IP-3/5,WPPSS
.
^h
-#
0