Category:CORRESPONDENCE-LETTERS
MONTHYEARML20195C5131999-05-28028 May 1999 Forwards Revs to Sections 3.9 & 5.6 of Its,Based on Resolution Telcons Held Between NRC Staff & Util on 990526 & 27 ML20128L0571996-10-0909 October 1996 Requests Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info That Will Provide NRC Added Confidence & Assurance That Plant Operated & Maintained within Design Bases & Deviations Reconciled ST-HL-AE-4678, Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List1994-01-20020 January 1994 Requests That Address for WT Cottle,Vice President Be Changed & Dp Hall,Wh Kinsey,Wj Jump & Ma Mcburnett Be Removed from Distribution List ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20128D6211985-05-24024 May 1985 Disputes Charges on 850424 Bill D0258,per 10CFR15 & 170. Bases for Calculation of Bill Involved Use of Inappropriate Fee Schedule.Extension of Due Date of Fee Requested to Facilitate Resolution of Disputed Amount ML20098G6271984-09-27027 September 1984 Forwards Responses to 840617 Request for Addl Info in Order to Complete Review of Facility Site Stabilization Plan.W/Two Oversize Maps.Aperture Cards Available in PDR ML20095E3971984-08-16016 August 1984 Forwards Duke Power Co & North Carolina Municipal Power Agency 1 1983 Annual Repts LG-84-332, Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl1984-04-24024 April 1984 Forwards Most Recent Aerial Photographs of Site for Review of Stabilization Plan.W/O Encl ML20079J5011984-01-19019 January 1984 Informs That Firm Name of Counsel for Applicants/Licensees Charged from Debevoise & Liberman to Bishop,Liberman,Cook, Purcell & Reynolds.Svc Lists Should Be Revised Accordingly ML20078C2031983-09-21021 September 1983 Requests Cancellation of CPPR-167,CPPR-168 & CPPR-169 Based on Current & Predicated Economic Conditions.Stabilization Plan Encl ML20115A6411983-05-12012 May 1983 Forwards Updated Const Status Repts for McGuire Unit 2, Catawba Units 1 & 2 & Cherokee Unit 1 as of 830331,per NUREG-0030.Rept Last Update for McGuire Unit 2 Due to Receipt of OL on 830303.Cherokee Unit 1 Canceled on 830429 LG-83-314, Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility1983-04-0707 April 1983 Responds to NRC Requiring Detailed Analysis of TMI Action Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps. Analysis Will Not Be Submitted,Due to Indefinite Delay in Const of Facility LG-83-163, Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 19831983-02-18018 February 1983 Forwards Amend 19 to Duke Power Nuclear Guides.Amend 20 Will Be Forwarded in Apr 1983 ML20127D4351983-02-0303 February 1983 Forwards Updated Const Status Repts as of 821231.Info for Inclusion in NUREG-0030.Fuel Load Target Date for Catawba Unit 1 May 1984 LG-83-049, Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established1983-01-17017 January 1983 Forwards Response to 821210 Request for Addl Info on IE Bulletin 81-03, Flow Blockage of Cooling Water to Safety Sys Components by Corbicula Sp (Asiatic Clam) & Mytilus Sp (Mussel). Monitoring Program for Clams to Be Established ML20063E6521982-08-24024 August 1982 Forwards Util & Nc Municipal Power Agency Annual Financial Repts for 1981 ML20054F3251982-06-14014 June 1982 Advises of NRC Statement in 820522 Response to Motion to Withdraw Application & to Terminate Proceedings.Nrc Aware of No Reason Why Application May Not Be Dismissed ML20062K3871982-05-20020 May 1982 Forwards First Quarter 1982 Yellow Book Updates Re Const Status ML20051H7031982-05-0505 May 1982 Recommends That Facility Be Deleted from Text of NUREG-0718. CP Applications Withdrawn LD-82-052, Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds1982-05-0404 May 1982 Informs That Addl Action Will Be Required in Order to Fully Comply W/Asme Code Requirements for Radiography of safe-end Welds.Discrepancy Will Be Resolved by re-radiographing Affected Welds ML20041D4921982-03-0202 March 1982 Withdraws CP Applications for Facilities,Per 10CFR2.107 & 820223 Vote by Util Board of Directors.Motion to Withdraw Applications W/O Prejudice & to Terminate CPs Filed W/Aslb & Aslab ML20040F2391982-02-0303 February 1982 Advises That Util Mgt Intends to Recommend to Board of Directors That Application for Facility CPs Be Withdrawn. Util Is Considering Option of Applying for Early Site Review.Util Press Release Encl ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1361981-11-0303 November 1981 Responds to NRC 811014 Ltr Re Violations Noted in IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03.Corrective Actions:Gas Cans Have Been Emptied & Placed in Motor Pool Storage Area ML20080D4571981-10-30030 October 1981 Requests That NRC Be Prepared to Discuss QA Problems at Facilities at Subcommittee 811119 Hearing on QA ML20011A6331981-10-22022 October 1981 Advises of Review of NRC Re Proposed Licensing Requirements & NUREG-0718.Facilities Share PSAR W/Cherokee. Applying Different Regulatory Requirements Could Jeopardize Standardization Concept ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20032D5211981-09-18018 September 1981 Informs That No Westinghouse Electro-Mechanical Div motor- Operated Gate Valves Have Been Installed in Response to IE Bulletin 81-02,Suppl 1.Approx 2 Manhours Expended in Review ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009B3301981-07-10010 July 1981 Requests That NRC Notify N Reynolds That 810622 Petition for Extension of Deadline for Compliance w/CLI-80-21 Has Been Retitled.Svc Should Be Made of All Subsequent Papers on Parties to Proceeding,Including Ucs ML20009D9001981-07-0808 July 1981 Responds to IE Bulletin 81-03 Re Blockage of Cooling Water to Safety Sys Components by Clams & Mussels.Provisions Will Be Made to Minimize Introduction of Clams Into Raw Water Sys.Fifteen Manhours Expended in Preparation of Bulletin ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20030D6581981-06-29029 June 1981 Advises That Toledo Edison Co & IA Electric Light & Power Co Should Be Included as Petitioners in Licensee 810622 Petition Requesting Commission Extension of Deadline Imposed by CLI-80-21 ML20004C2561981-05-28028 May 1981 Requests Authorization to Use ASME Code Cases 1481-2,1592-14 & 1644-8 in Fabrication of Primary Sys Components for Facilities ML20126L6861981-05-19019 May 1981 Ack Receipt of & Informs That Author Is Not Counsel for Intervenors.Nrc Should Furnish ASLB & Aslab W/ Encl Nc Atty General 770328 Memo.Certificate of Svc Encl ML20126K4051981-05-13013 May 1981 Responds to 810411 & 25 Ltrs & Forwards ALAB-355,Footnote 26 Which Sets Stds for Disclosure of Matl Matters ML20126K4201981-05-0404 May 1981 Informs That Being Forwarded to C Barth for Response ML20126K4151981-04-25025 April 1981 Inquires Whether NRC May Withhold Matl Evidence from ASLB, Aslab or Commission ML20003H7721981-04-20020 April 1981 Responds to Re Info Possibly Being Withheld from Aslab.Suggests Contacting Wg Pfefferkorn W/Assessment ML20003H7751981-04-11011 April 1981 Suggests That NRC Is Withholding Matl Info from Aslab ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19350B5911981-03-19019 March 1981 Informs That SE Turk Will Present Argument on Behalf of NRC at 810401 Oral Argument.Atty Previously Assigned to Present Oral Argument Will Be Unable to Do So ML19347D5561981-03-16016 March 1981 Discusses Intervenor Position Re Util 810310 Response to ASLB 810225 Inquiry Re Indefinite Suspension of Const Plans at Site.Application Should Be Suspended or Dismissed Until Issues Re Schedule Commitments Have Been Resolved ML19347D3491981-03-12012 March 1981 Responds to NRC 810223 Request for Addl Info Re Util Plans for Facilities.Completion of Cherokee 1 & 2 Has Been Indefinitely Delayed.Commercial Operating Dates for Cherokee 3 & Perkins 1,2 & 3 Have Not Been Determined ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19350B4381981-03-10010 March 1981 Presents Reasons Why Aslab Should Proceed W/Oral Argument Re Alternate Site Issues as Previously Scheduled ML19347D0311981-03-0404 March 1981 Forwards 810224 Press Release Re Delay of Facility Completion.Financial Situation Has Pushed Facility Completion Into Indefinite Future 1999-05-28
[Table view] Category:NRC TO UTILITY
MONTHYEARML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19351F9851981-01-27027 January 1981 Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. No safety-related Valves Using Specified Valve Yokes Are Used ML19343C1721981-01-26026 January 1981 Forwards ACRS to Chairman Ahearne Re Review of Requirements for near-term CP Applications ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required ML19345D8411980-10-31031 October 1980 Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Required ML19340C8501980-10-30030 October 1980 Forwards IE Info Notice 80-38, Cracking in Charging Pump Casing Cladding. No Written Response Required ML19339C1611980-10-24024 October 1980 Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19336A6381980-10-16016 October 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-369/80-08, 50-370/80-05,50-413/80-09,50-414/80-09,50-491/80-07, 50-492/80-06 & 50-493/80-06 ML19338G3141980-10-10010 October 1980 Forwards IE Info Notice 80-36, Failure of Steam Generator Support Bolting. No Specific Action or Response Requested ML19338F8741980-10-0202 October 1980 Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required ML19347B9491980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19337A5771980-09-10010 September 1980 Forwards IE Circular 80-21, Regulation of Refueling Crews. No Written Response Required ML20008D8241980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. No Written Response Required ML19337A1521980-08-29029 August 1980 Submits Interim Actions for Plant Operation,Pending Final Resolution of Atws.Emergency Operation Procedural Review May Include NRC Site Visit Prior to Issuance of OL ML19344F0241980-08-27027 August 1980 Forwards IE Info Notice 80-31, Maloperation of Gould-Brown Boveri 480 Volt Type K-600S & K-DON 600S Circuit Breakers. No Written Response Required ML19332A4831980-08-22022 August 1980 Forwards IE Circular 80-18, 10CFR50.59 Safety Evaluations for Changes to Radwaste Treatment Sys. No Written Response Required ML19331D5251980-08-15015 August 1980 Forwards Revision 1 to IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Written Response Required ML19331D2501980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C4861980-08-0707 August 1980 Forwards IE Info Notice 80-29, Broken Studs on Terry Turbine Steam Inlet Flange. No Specific Action or Response Requested ML19338C5291980-07-31031 July 1980 Forwards IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by Combustion Engineering. Action Required by Facilities W/Ols or CPs ML19344D8531980-07-24024 July 1980 Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required ML19338C3451980-07-22022 July 1980 Forwards IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/ 80-08 on 800611-13.No Noncompliance Noted ML19336A6431980-07-18018 July 1980 Forwards IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-07,50-492/80-06 & 50-493/80-06 on 800519-23 & Notice of Violation ML19321A3611980-06-27027 June 1980 Forwards IE Bulletin 80-16, Potential Misapplication of Rosemount Inc Models 1151 & 1152 Pressure Transmitters W/Either a or D Output Codes. Written Response Required. IE Circular 80-16 Also Encl.No Written Response Required ML19330A3101980-06-24024 June 1980 Forwards IE Circular 80-14, Radioactive Contamination of Plant Demineralized Water Sys & Resultant Internal Contamination of Personnel. No Written Response Required ML19331C2691980-06-16016 June 1980 Forwards IE Insp Repts 50-491/80-08,50-492/80-07 & 50-493/80 -07 on 800624-25.No Noncompliance Noted ML19326D9961980-06-13013 June 1980 Forwards IE Info Notice 80-28, Prompt Reporting of Info in Accordance W/10CFR50.55(e). No Written Response Required ML19326D7151980-06-12012 June 1980 Forwards Organization Charts for Ofc of Nuclear Reactor Regulation Effective 800428.States Means of Appeal of Staff Position ML19318B9351980-06-12012 June 1980 Forwards Reorganization Chart for Ofc of Nuclear Reactor Regulation.Facility Licensing Matters Will Be Handled by C Moon.Transition Being Made W/Min of Disruption to Ongoing Activities ML19318B2301980-06-12012 June 1980 Discusses Reorganization of Ofc of Nuclear Reactor Regulation & Advises That Mgt Responsibilities Re Facility Have Been Assigned to C Moon.Reorganization Charts Encl 1985-09-12
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20128L0571996-10-0909 October 1996 Requests Info,Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info That Will Provide NRC Added Confidence & Assurance That Plant Operated & Maintained within Design Bases & Deviations Reconciled ML20138Q8301985-12-0303 December 1985 Further Response to FOIA Request for Records Re Voluntary or Required Redress of Sites Where Const Was Terminated, Including Crbr & Legal Analysis.Forwards App E Documents.App D & E Documents Available in Pdr.Photographs Also Available ML20132A8831985-09-12012 September 1985 Responds to 830921 Request That CPPR-167,CPPR-168 & CPPR-169 Be Deleted.Stabilization Plan Has No Significant Environ Impact.Dockets Changed to Canceled Status ML20040H0391982-01-27027 January 1982 Forwards Request for Addl Info Through C-E Owners Group on C-E Heated Junction Thermocouple Reactor Vessel Level Measurement Sys.Response Requested within 30 Days to Complete Generic Review of CEN-181-P ML20038D1311981-12-0808 December 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-491/81-03, 50-492/81-03 & 50-493/81-03 ML20038D1391981-10-14014 October 1981 Forwards IE Insp Repts 50-491/81-03,50-492/81-03 & 50-493/81-03 on 810908-11 & Notice of Violation ML20010A8751981-08-0404 August 1981 Informs That Class 9 Accident Analyses Should Be Presented in Environ Rept.W/O Encl ML20010B8881981-07-27027 July 1981 Forwards IE Insp Repts 50-491/81-02,50-492/81-02 & 50-493/81-02 on 810707-10.No Noncompliance Noted ML20009A7271981-07-0707 July 1981 Authorizes Use of ASME Code Cases 1481-2,1592-14 & 1644-8 in Const of Containment Hydrogen Recombiners,In Response to Util .Conditions for Use Discussed.Use of Code Cases Should Be Documented in FSAR ML20126K4051981-05-13013 May 1981 Responds to 810411 & 25 Ltrs & Forwards ALAB-355,Footnote 26 Which Sets Stds for Disclosure of Matl Matters ML20126K4201981-05-0404 May 1981 Informs That Being Forwarded to C Barth for Response ML20003H7721981-04-20020 April 1981 Responds to Re Info Possibly Being Withheld from Aslab.Suggests Contacting Wg Pfefferkorn W/Assessment ML20008G0131981-04-0707 April 1981 Forwards IE Insp Repts 50-491/81-01,50-492/81-01 & 50-493/81-01 on 810310-12.No Noncompliance Noted ML19350B3351981-03-11011 March 1981 Forwards IE Info Notice 81-06, Failure of Ite Model K-600 Circuit Breaker. No Response Required ML19350A6991981-03-0202 March 1981 Forwards IE Circular 81-03, Inoperable Seismic Monitoring Instrumentation. No Response Required ML19341B8151981-02-25025 February 1981 Requests Util Const Plans for Facility.Response to Be Filed by 810310 & Replies by 810317 ML20008E4531981-02-23023 February 1981 Requests Info Re Schedule for Licensing Activities for Facilities ML19341C1811981-02-0909 February 1981 Forwards IE Circular 81-02, Performance of NRC-Licensed Individuals While on Duty. No Written Response Required ML19339D0971981-02-0404 February 1981 Forwards IE Mgt Meeting Repts 50-269/80-34,50-270/80-30, 50-287/80-27,50-369/80-30,50-370/80-16,50-413/80-30, 50-414/80-30,50-491/80-06,50-492/80-09 & 50-493/80-09 on 801024.No Noncompliance Noted ML19343C1721981-01-26026 January 1981 Forwards ACRS to Chairman Ahearne Re Review of Requirements for near-term CP Applications ML19345F9201981-01-23023 January 1981 Forwards IE Circular 81-01, Design Problems Involving Indicating Pushbutton Switches Mfg by Honeywell,Inc. No Response Required ML19341A5501981-01-22022 January 1981 Denies 810117 Request for Limited Appearance Statement. Right to Make Statement Is Limited to Evidentiary Hearing & Proceeding Is Now in Appellate Stage ML19341D2821981-01-20020 January 1981 Forwards IE Insp Repts 50-491/80-10,50-492/80-10 & 50-493/80-10 on 801202-05.No Noncompliance Noted ML19341B8371981-01-16016 January 1981 Forwards IE Info Notice 81-01, Possible Failures of GE Type Hfa Relays. No Response Required ML19353A3981980-12-22022 December 1980 Responds to Re NRC Progress in Review of Cps,Use of Resources for Section 110 of NRC 1980 Authorization Act, Delay in Adjudicatory Proceedings & Lack of Coherent Regulatory Guidance.Related Documentation Encl ML19340E0271980-12-16016 December 1980 Forwards IE Info Notice 80-44, Actuation of ECCS in Recirculation Mode While in Hot Shutdown. No Written Response Required ML19340C8091980-11-26026 November 1980 Forwards IE Info Notice 80-29,Suppl 1, Broken Studs on Terry Turbine Steam Inlet Flange. No Written Response Required ML19345C4561980-11-21021 November 1980 Forwards IE Bulletin 80-24, Prevention of Damage Due to Water Leakage Inside Containment. No Written Response Required ML19345C2211980-11-14014 November 1980 Forwards IE Bulletin 80-23, Failures of Solenoid Valves Mfg by Valcor Engineering Corp. Requires Estimate of Manpower Associated W/Corrective Actions ML19345C7171980-11-10010 November 1980 Forwards IE Info Notice 80-41, Failure of Swing Check Valve in Decay Heat Removal Sys at Davis Besse Unit 1. No Response Required ML20002B5171980-11-0606 November 1980 Forwards IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Written Response Required ML19345D8411980-10-31031 October 1980 Forwards IE Info Notice 80-39, Malfunction of Solenoid Valves Mfg by Valcor Engineering Corp. No Written Response Required ML19340C8501980-10-30030 October 1980 Forwards IE Info Notice 80-38, Cracking in Charging Pump Casing Cladding. No Written Response Required ML19339C1611980-10-24024 October 1980 Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19336A6381980-10-16016 October 1980 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-369/80-08, 50-370/80-05,50-413/80-09,50-414/80-09,50-491/80-07, 50-492/80-06 & 50-493/80-06 ML19338G3141980-10-10010 October 1980 Forwards IE Info Notice 80-36, Failure of Steam Generator Support Bolting. No Specific Action or Response Requested ML19338F8741980-10-0202 October 1980 Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required ML19347B9491980-09-30030 September 1980 Forwards Suppl 2 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required ML19337A5771980-09-10010 September 1980 Forwards IE Circular 80-21, Regulation of Refueling Crews. No Written Response Required ML20008D8241980-08-29029 August 1980 Forwards IE Info Notice 80-32, Clarification of Certain Requirements for Exclusive Use Shipments of Radioactive Matls. No Written Response Required ML19337A1521980-08-29029 August 1980 Submits Interim Actions for Plant Operation,Pending Final Resolution of Atws.Emergency Operation Procedural Review May Include NRC Site Visit Prior to Issuance of OL ML19344F0241980-08-27027 August 1980 Forwards IE Info Notice 80-31, Maloperation of Gould-Brown Boveri 480 Volt Type K-600S & K-DON 600S Circuit Breakers. No Written Response Required ML19332A4831980-08-22022 August 1980 Forwards IE Circular 80-18, 10CFR50.59 Safety Evaluations for Changes to Radwaste Treatment Sys. No Written Response Required ML19331D5251980-08-15015 August 1980 Forwards Revision 1 to IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by C-E. Written Response Required ML19331D2501980-08-14014 August 1980 Forwards IE Info Notice 80-24, Low Level Radwaste Burial Criteria. No Written Response Required.Jh Sniezek 800530 Memo Encl ML19338C4861980-08-0707 August 1980 Forwards IE Info Notice 80-29, Broken Studs on Terry Turbine Steam Inlet Flange. No Specific Action or Response Requested ML19338C5291980-07-31031 July 1980 Forwards IE Bulletin 80-19, Failures of Mercury-Wetted Matrix Relays in Reactor Protective Sys of Operating Nuclear Power Plants Designed by Combustion Engineering. Action Required by Facilities W/Ols or CPs ML19344D8531980-07-24024 July 1980 Forwards IE Bulletin 80-18, Maint of Adequate Min Flow Through Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture. No Action Required ML19338C3451980-07-22022 July 1980 Forwards IE Insp Repts 50-491/80-09,50-492/80-08 & 50-493/ 80-08 on 800611-13.No Noncompliance Noted ML19336A6431980-07-18018 July 1980 Forwards IE Insp Repts 50-369/80-08,50-370/80-05, 50-413/80-09,50-414/80-09,50-491/80-07,50-492/80-06 & 50-493/80-06 on 800519-23 & Notice of Violation 1996-10-09
[Table view] |
Text
,,..
ff/A 40o9' o
UNITED STATES NUCLEAR REGULATORY COMMISSION
.y o
nE REGION 11 e
.101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 o
NOV 141980 m
In Reply Refer To:
3 RII:JP0 5
lL 50-491, 92 i
50-493,
.J Q
/g e (10-489_
7
._:q dij Llg5 m
a
~
~
2R S
Duke Power Company j),
.3 ATTN:
L. C. Dail, Vice President G
^
Design Engineering P. O. Box 33189 Charlotte, NC 28242 Gentlemen:
Enclosed is IE Bulletin No. 80-23 which requires action by you with' regard to your nuclear powec facility.
In order to assist the NRC in evaluating the value/ impact of each bulletin on licensees, it would be helpful if you would provide us an estimate of the manpower expended in conduct of the review and preparation of the report (s) required by the bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the bulletin.
Should you have any questions regarding this bulletin or the actions re-quired by you,' please contact this office.
Sincerely, (N_' >\\
7 l
v James P. O'Reilly Director
Enclosures:
1.
IE Bulletin No. 80-23 2.
List of Recently. issued IE Bulletins cc w/ encl:
J. T. Moore, Project Manager sewooo \\@
SSINS No.: 6820 t
Accessica No.:
8008220257 1
UNITED STATES NUCLEAR REGULATORY COMMISSION 7'~g q
t-a OFFICE OF INSPECTION AND ENFORCEMENT d
WASHINGTON, D.C.
20555 h
aJ November 14, 1980 IE Bulletin No. 80-23: FAILURES OF SOLENOID VALVES MANUFACTURED BY VALCOR ENGINEERING CORPORATION
==
Introduction:==
Valcor Engineering Corporation (Valcor) has submitted 10 CFR Part 21 Reports addressing failures of Valcor solenoid valves used at nuclear power facilities.
These failures have occurred at nuclear facilities owned by Duke Power Company and Omaha Public Power District, and 3.re purportedly limited to solenoid valves having part numbers (P/N's) V70900-21-1 and V70900-21-3.
The information presented in this bulletin is intended to shed light on the defective solenoid valves so that appropriate actions can be taken to circum-vent the degradation of any safety-related system using such solenoid valves.
DISCUSSION:
The specific Valcor solenoid valves addressed herein were purportedly designed as Class IE components. However, in light of the reported failures, it appears that neither the design nor the qualification tests were adequate for Class IE service. Valcor has attributed the failures to a latent defect in the magnet wire. Valcor believes that this defect manifests itself when the solenoid valves are continuously energized et elevated temperati.:es by an incompata-bility between the magnet wire's polyvinyl varnish coating and the wire's polyimide insulation which causes a dielectric breakdown leading to turn-to-turn shorts within the coil.
Valcor states that the above incompatability is limited to solenoid valves having P/N's V70900-21-1 and V70900-21-3, and that all customers offected by the aforementioned defect have been notified. A listing of Valcor customers r,o notified and valves purchased follows.
gUSTOMER P.O. NO.
VALVE P/N QTY Anchor-Darling P-827 V70900-21-1,-3 24 Anchor-Darling N663 V70900-21-1 6
Cesare Bonetti (Italy) 1535/79 V70900-21-3 10 Duke Power Company E95188-11 V70900-21-3 100 Duke (Mill Power)
C-97733 V70900-21-1,-3 335 Duke Power Company E97822-11 V70900-21-3 70 Ralph Hiller HA-187-0 V70900-21-3 14 Mill Power E52462-73 V70900-21-1,-3 20 Omaha Public Power Dist.
43472 V70900-21-3 19 Stone and Webster LOOO #43 V70900-21-3 8
Copes Vulcan 911,553 V70900-21-1 4
TOTAL 610
IEB 80-23
-r Noverbar 14, 1980 Pages 2 of 3 Valcor's correttive actions include making arrangements for replacing existing
. coils with a newly designed coil using a 997 silicone varnish coating instead
.of the polyvinyl varnish. Sample coils of the new design are scheduled to undergo qualification tests. We do not know the particulars of these tests, but Valcor has scheduled the first phase of these tests for completion by November 15, 1980, and has identified the second phase as an on going aging test.
-Fort Calhoun has replaced twelve of its original solenoid valves with Valcor type V70900-21-3 valves, ten of which are located inside containment and two outside. This substitution was made because the original solenoid valves did not meet the requirements of IE Bulletin No. 79-01.
However, subsequent to the replacement, Fort Calhoun has experienced five failures of these Valcor solenoid valves. Each failure involved a solenoid valve located inside contain-ment and designed for operation in the normally energized mode. These two factors (i.e., continuously energized mode of operation and a somewhat elevated temperature inside* containment) tend to support Valcor's contention regarding the failure mechanism.
ACTIONS TO BE TAKEN BY LICENSEES:
1.
Determine whether Valcor solenoid valves having P/N's V70900-21-1 or -3 are used to perform any safety-related function at your facility.
If so, identify the safety-related systems using.these solenoid valves, the' total number of such solenoid valves used, and evaluate acceptability of continued operation with potentially defective solenoid valves. A report of the results of the evaluation of continued operation shall be rubmitted within ten (10) days of the date of this bulletin and should include factors such as (a) operator's ability to promptly identify a failing or failed solenoid valve, (b) effect of solenoid valve failures on safety-related systems and subsequent operator actions required, and (c) possible degradation of the power supply serving a failed solenoid valve and the effects on other components served by said power supply.
If no such solenoid valves are used, you need only submit a negative declaration to this effect within thirty (30) days of the date of this bulletin and you need not respond to the remaining items.
2.
Licensees of operating plants using the aforementioned solenoid valves in safety-related applications shall periodically test the coils for potential turn-to-turn shorts in a manner that will not violate any LCO or cause any undesirable transient. The tests should account for coil resistance chgnges due te temperature effects attributed to the environ-ment and to I R losses in the coil to provide accurate indications of changes in resistance due to turn-to-turn shorts.
i These tests are to be initiated within ten (10) days of the date of this bulletin. The following schedule is recommended until the units are replaced with qualified units:
(a) Daily.for solenoid valves operated in a norally energized mode; (b) Weekly for solenoid valves operated in a normally deenergized mode.
t
IEB 80-23 Noveab:er - 14, 1980 Pages 3.cf 3 Whenever'the tests indicate that ten percent or more of the coil-turns have been shorted,'said solenoid valve, or its' coil, shall be replaced with a new unit.
3.
Licensees of operating plants shall submit a report within forty-five (45) days of the date of this bulletin describing their longer term corrective action plan and the date by which the corrective actions
. _ will be implemented. As a minimum, the longer term corrective measures should-include the replacement of the coils with fully qualified coils.
New solenoid' valve assemblies (i.e., a repaired unit with a replacement coil or a completely new. unit) shall be demonstrated to be qualified for its safety-related application per the applicable requirements of j
IEEE 323-1974, IEEE 344-1975, IEEE 382-1972 and IE Bulletin No.79-01B and supplements thereto.
ACTIONS TO BE TAKEN BY HOLDERS OF CONSTRUCTION PERMITS:
1.
Determine whether Valcor solenoid valves having P/N's V70900-21-1 or -3 are to be used to perform safety-related functions at your facility.
If so, a report addressing this matter shall be submitted by the earlier of the two following' dates:
(a) within ninety (90) days of the date of this bulletin; (b) two weeks prior to the date by which you expect to recieve an operating License.
The above report should indicate your plans to replace said valves prior to commencing operation, if this is the case. Otherwise, if you t
propose to commence operation prior to replacing said valves, the report should indicate the safety-related systems where such valves are.to be used, and should include an evaluation of the acceptability of operating with potentially defective valves. This evaluation should address factors such as your. proposed test plan, operator's ability to promptly identify a failing or failed valve, effect of solenoid valve failure on safety-related systems and subsequent operator actions required, and the preventive measures you plan to implement to circumvent the effects of failures of these valves.
If no such valves are to be used in your facility, submit a negative declaration to this effect within forty-five (45) days of the date of this bulletin but prior to the date by which you expect to receive an cperating license.
The above requested reports shall be submitted to the director of the i
appropriate NRC region within time stipulated for each item in the this bulletin. A copy of each report shall be forwarded to the Director, Division of Reactor Operations Inspection, Office of Inspection and Enforcement, United States Nuclear Regulatory Commission, Washington, D. C. 20555.
4 j
Approved by GAO, B180225(R0072);
clearance expires November 30, 1980. Approval was given under a blanket clearance specifically for identified generic problems, J
.Y* f $7*j "? 7 }'
' ~~ ""
t
~,
6 IEB 80-23 Novembe; 14, 1980 RECENTLY ISSUED IE BULLETINS Bulletin No.
Subject Date Issued Issued To 80-23 Failures of Solenoid Valves 11/. '#/80 All nuclear power Manufactured by Valcor facilities with an Engineering Corporation OL or CP 80-22 Automation Industries, 9/11/80 All radiography
-Model 200-520-008 Sealed-licensees Source Connectors 80-21 Valve yokes supplied by 11/6/80 All light water Malcolm Foundry Company, Inc.
reactor facilities holding OLs or cps Supplement 3 Environmental Qualification 10/24/80 All power reactor to 79-10B of Class IE Equipment facilities with an OL Supplement 2 Environmental Qualification 9/30/80 All power reactor to 79-01B of Class IE Equipment facilities with an OL 80-22 Automation Ir' -tries, 9/11/80 All radiography Model 200-52v-008 Sealed-licensees source Cennectors 79-26 Boron Loss from BWR 8/29/80 All BWR power Revision 1 Control Blades facilities with an OL 80-20 Failures of Westinghouse 7/31/80 To each nuclear Type W-2 Spring Return power facility in to Neutral Control Switches your region having an CL or a CP 80-19 Failures of Mercury-7/31/80 All nuclear power Wetted Matrix Relays in facilities having
- f. actor Protective Systems either an OL or a CP of Operating Nuclear Power Plants Designed by Combus-tion Engineering 80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture